This page is being moved to a new, faster, and mobile-friendly application! Access the enhanced and centralized experience now on
MyWorkspace
.
Connecting the world and beyond
ITU
General Secretariat
Radiocommunication
Standardization
About ITU-T
Events
All Groups
Standards
Resources
BSG
Study Groups
Regional Presence
Join Us
MyWorkspace
Development
ITU Telecom
Members' Zone
Join ITU
ITU-T work programme
You are here
Home
>
ITU-T work programme
Share
[2013-2016] : [
SG5
] : [
Q19/5
]
[
Declared patent(s)
]
- [
Publication
]
Work item:
L.dualpowerinput
Subject/title:
Impact on ICT equipment architecture of multiple AC or up to 400 VDC power
Status:
[
Carried to next study period
]
Approval process:
AAP
Type of work item:
Recommendation
Version:
New
Equivalent number:
-
Timing:
-
Liaison:
ETSI EE/EE2, IEC
Supporting members:
Huawei, Orange, China, Telecom Italia
Summary:
The document describes all the identified impacts at the power interface i.e.switch/combine circuit between inputs, plugs, converter, power sharing enabling individual battery bank test, ... inside ICT equipment from power interface to internal converters inputs. It will describes in details the following cases: no switch /combine upstream the converter. AC and AC input to ICT equipment with switch. DC and DC input to ICT equipment with combine circuit. DC and DC input to ICT equipment with switch Hybrid AC and DC input to ICT equipment with switch It includes description of impacts on the circuit between the input interface and converter inputs and possible specific solutions for : - power feeding protection lines - plugs and isolation, - power sharing control enabling separate battery test attached to redundant power feeds. - any other depending on impacts
Comment:
Editor: Andreas Stiedl (Huawei) Didier Marquet (Orange)
Reference(s):
[
TD 1770 Rev.2 (GEN/5)
]
[
C 842-COM5
]
[
C 781 Rev.1-COM5
]
[
COM05-C.0781rev1, C.0842
]
Historic references:
[
COM05-C.0781rev1, C.0842
]
Contact(s):
Didier MARQUET
, Editor
SHUGUANG QI
, Editor
Andreas STIEDL
, Editor
ITU-T A.5 justification(s):
-
[
Submit new A.5 justification
]
See guidelines for creating & submitting ITU-T A.5 justifications
First registration in the WP:
2016-10-16 21:40:35
Last update:
2016-10-16 21:44:37
Follow us
Twitter
Facebook
YouTube
Flickr
Linkedin
Instagram
Soundcloud
Podcasts
Spotify
Spreaker
TikTok