1st Inter-regional Information Session
on WRC-27 Preparation
3-5 December 2025
3-5 December 2025
1st Inter-regional Information Session on WRC-27 Preparation
The 1st Inter-regional Information Session (IRIS) on WRC-27 Preparation is a face-to-face event organized in accordance with Resolution 72 (Rev.WRC-19) with the possibility of remote participation (see Programme).
Using information from the ITU-R responsible groups on the ongoing preparatory studies for WRC‑27 (see at itu.int/go/rcpm-wrc-27-studies), as well as on up-to-date information regarding the Bureau and regional preparations for CPM27-2, RA-27 and WRC-27, round tables provide all the stakeholders with the opportunity to exchange views and gain a deeper insight on the most challenging WRC‑27 agenda items and issues, as well as of the draft preliminary common views and/or positions of the concerned entities.
Programme1 (Geneva time) | Meeting Sessions
Day 1 – 3 Dec. 2025
- Address by Mr Mario Maniewicz, Director BR
- Address by Mr Alexander Kühn, Chair CPM-27
- Status of the preparation for CPM27-2, RA‑27 and WRC‑27, incl. organizations of regional groups and main areas of activity
- CEPT: Mr Stephen TALBOT (CPG Chair)
- Representatives of APT, ASMG, ATU, CITEL and RCC
Panel on WRC-27 agenda item 1.7 (IMT)2
| Moderator: | Mr Michael KRÄMER (Chair, ITU-R WP 5D WG SPEC & WRC PREP) | |
| Panelists: | • Mr Geraldo NETO (Chair, ITU-R WP 5D SWG ai 1.7); • CEPT: Mr Christoph HILDEBRAND (ECC Project Team (PT) 1 Chair) • Representatives of APT, ASMG, ATU, CITEL and RCC |
Panel on WRC-27 agenda item 1.13 (IMT-MSS)2
| Co-Moderators: | Mr Nobuyuki KAWAI (Chair, ITU-R WP 4C); Mr Hiroyuki ATARASHI (Chair, ITU-R WP 5D) | |
| Panelists: | • Mr Alexander PASTUKH (Chair, ITU-R WP 4C SWG ai 1.13); • Dr Golnar KHOMAMI (Chair, ITU-R WP 5D SWG IMT-MSS); • CEPT: Mr Christoph HILDEBRAND (ECC PT 1 Chair) • Representatives of APT, ASMG, ATU, CITEL and RCC |
Panel from Session 1 (cont’d)2
Panel on WRC-27 agenda items 1.11, 1.12 & 1.14 (MSS)2
| Moderator(s): | Mr Paul DEEDMAN (Chair, ITU-R WP 4C WG MSS Spectrum Aspects) | |
| Panelists: | • Ms Xochitl HERNANDEZ, (Chair, ITU-R WP 4C SWG ai 1.11) • Mr Nickolas SPINA, (Chair, ITU-R WP 4C SWG ai 1.12) • Ms Jennifer A. MANNER (Chair, ITU-R WP 4C SWG ai 1.14) • CEPT: Ms Nadia KATSANOU (CPG PT C Chair & CPG Vice Chair) • Representatives of APT, ASMG, ATU, CITEL and RCC |
Panel from Session 2 (cont’d)2
- The timing of the sessions and the list of the WRC-27 agenda items/topics are indicative at this stage and may change subsequently, as deemed appropriate.
- Roundtables on presentation and explanations of the ongoing ITU-R preparatory studies for WRC-27 by the responsible groups, and of the preliminary draft common views, positions and/or proposals from the regional groups (APT‑APG, Arab Group/ASMG, African Group/ATU, CEPT-CPG, CITEL‑PCC.II, RCC), other main international organizations (e.g. ICAO, IMO, WMO, etc.) and/or other relevant stakeholders, as appropriate.
Day 2 – 4 Dec. 2025
- The timing of the sessions and the list of the WRC-27 agenda items/topics are indicative at this stage and may change subsequently, as deemed appropriate.
- Roundtables on presentation and explanations of the ongoing ITU-R preparatory studies for WRC-27 by the responsible groups, and of the preliminary draft common views, positions and/or proposals from the regional groups (APT‑APG, Arab Group/ASMG, African Group/ATU, CEPT-CPG, CITEL‑PCC.II, RCC), other main international organizations (e.g. ICAO, IMO, WMO, etc.) and/or other relevant stakeholders, as appropriate.
Day 3 – 5 Dec. 2025
Closing
- The timing of the sessions and the list of the WRC-27 agenda items/topics are indicative at this stage and may change subsequently, as deemed appropriate.
- Roundtables on presentation and explanations of the ongoing ITU-R preparatory studies for WRC-27 by the responsible groups, and of the preliminary draft common views, positions and/or proposals from the regional groups (APT‑APG, Arab Group/ASMG, African Group/ATU, CEPT-CPG, CITEL‑PCC.II, RCC), other main international organizations (e.g. ICAO, IMO, WMO, etc.) and/or other relevant stakeholders, as appropriate.
Practical Information for Participants
Documentation
Information Documents
Input Documents




