Executive summary of the SG11 meeting (Geneva, 6-15 February 2017)
Study Group 11 meeting was held in Geneva, from 6-15 February 2017 and was attended by 90 delegates from 27 countries. Along with face-to-face meetings, most sessions from various Questions or joint Questions meetings were supported by remote participation capabilities.
The SG11 meeting was co-located with:
-
SG13 (6-17 February 2017);
-
Steering Committee of the SG11RG-RCC (7 February 2017);
- JCA-SDN (9 February 2017);
- 3rd ITU-T CASC meeting (13 February 2017);
- Steering Committee of the SG11RG-AFR (13 February 2017).
1 Approved and Consented Recommendations (ITU-T A.8)
The following table shows the ‘Consented’ draft Recommendations
# | Question | WP/11 | Draft new/revised Rec. No. | Title | Final TD PLEN | A.5 justification |
1 | 1/11 | 1/11 | ITU-T Q.3053 (formerly Q.Arc-IPSMS) | Signalling architecture and requirements for IP based short message service over ITU-T defined NGN | TD 159 | TD 148 |
2 | 2/11 | 1/11 | ITU-T Q.3630 v.1 | Inter-IMS Network to Network Interface (NNI) | TD 140 | TD 127 |
3 | 5/11 | 1/11 | ITU-T Q.3713 (formerly Q.BNG-Pool) | Signalling requirements for BNG (Broadband Network Gateway) pool | TD 138 Rev.1 | N/A |
2. Supplements, Handbooks, Technical Papers, Guidelines and Corrigenda
2.1 Supplements
No Supplements were approved at this meeting.
2.2 Guidelines
The following table shows the approved draft Guidelines
# | Question | WP/11 | Guidelines | Title | Final TD | A.5 justification |
1 | | CASC | ITU-T SG11 Guideline | ITU-T CASC procedure to appoint ITU-T technical experts | TD 144 | N/A |
2.3 Handbooks
No Handbooks were approved at this meeting.
2.4 Technical Papers
The following table shows the approved draft Technical Report
# | Question | WP/11 | Technical Report | Title | Final TD | A.5 justification |
1 | 15/11 | 3/11 | Survey Report | Survey report on counterfeit ICT devices in Africa region | TD 1199 Rev.1 | N/A |
2.5 Corrigenda
No Corrigenda were approved at this meeting.
3 SG11 Structure and Management
The structure and management of SG11 as presented in TD 62 Rev.5 was endorsed by the meeting
SG11 structure and Management team is therefore confirmed as follows:
WP1: Signalling requirements and protocols for emerging telecommunications networks
(Questions: 1, 2, 3, 4, 5/11)
WP1 Chairman: Xiaojie Zhu (China Telecom),
WP1 Vice-chairman: Vacant
WP2: Control and management protocols for IMT-2020
(Questions: 6, 7, 8/11)
WP2 Chairman: Shin-Gak Kang (ETRI)
WP2 Vice-chairman: Vacant
WP3: Conformance and interoperability testing, combating counterfeit ICT and mobile device theft
(Questions: 9, 10, 11, 12, 13, 14, 15/11)
WP3 Chairman: Kaoru Kenyoshi (NEC Corporation)
WP3 Vice-chairman: Awad Ahmed Ali Hmed Mulah (NTC)
WP3 Vice-chairman: João Alexandre MONCAIO ZANON (NTA)CASC: Conformity Assessment Steering Committee
Chairman: Isaac BOATENG (NCA)
Vice-chairman: Khoa NGUYEN VAN (VNTA, MIC)
Vice-chairman: Karim LOUKIL (CERT)
SG11RG-AFR: ITU-T SG11 Regional Group for Africa
Chairman: Isaac BOATENG (NCA)
Vice-chairman: Karim LOUKIL (CERT)
SG11RG-RCC: ITU-T SG11 Regional Group for RCC
Chairman: Alexey BORODIN (Rostelecom)
4 Questions
There were no changes to the Questions texts at this meeting.
5 Liaison officers and Rapporteurs
SG11 approved the appointment of the new Rapporteurs and Associate Rapporteurs as follows:
QUESTION | CONTACT |
Q1/11 (WP1/11) Signalling and protocol architectures in emerging telecommunication environments and guidelines for implementations | Huan DENG Rapporteur Email: denghuan.bri@chinatelecom.cn |
Q2/11 (WP1/11) Signalling requirements and protocols for services and applications in emerging telecommunication environments | Cheng LI Rapporteur Email: licheng@caict.ac.cn |
| Martin BRAND Associate Rapporteur Email: martin.brand@a1telekom.at |
Q3/11 (WP1/11) Signalling requirements and protocols for emergency telecommunications | Xiaojie ZHU Acting rapporteur Email: zhuxj@gsta.com |
Q4/11 (WP1/11) Protocols for control, management and orchestration of network resources | Ying CHENG Rapporteur Email: chengying10@chinaunicom.cn |
Q5/11 (WP1/11) Protocols and procedures supporting services provided by broadband network gateways | Junfeng MA Rapporteur Email: majunfeng@caict.ac.cn |
| Aipeng GUO Associate rapporteur Email: guoap7@chinaunicom.cn |
Q6/11 (WP2/11) Protocols supporting control and management technologies for IMT-2020 | Haining WANG Rapporteur Email: wanghn.bri@chinatelecom.cn |
Q7/11 (WP2/11) Signalling requirements and protocols for network attachment including mobility and resource management for future networks and IMT-2020 | Jongmin LEE Rapporteur Email: jminlee@sk.com |
Q8/11 (WP2/11) Protocols supporting distributed content networking and information centric network (ICN) for future networks and IMT-2020, including end-to-end multi-party communications | Shin-Gak KANG Rapporteur Email: sgkang@etri.re.kr |
Q9/11 (WP3/11) Service and networks benchmark testing, remote testing including Internet related performance measurements | Martin BRAND Rapporteur Email: martin.brand@a1telekom.at |
Q10/11 (WP3/11) Testing of emerging IMT-2020 technologies | Kaoru KENYOSHI Acting rapporteur Email: kaoru.kenyoshi@emea.nec.com |
Q11/11 (WP3/11) Protocols and networks test specifications; frameworks and methodologies | Martin BRAND Rapporteur Email: martin.brand@a1telekom.at |
| Kaoru KENYOSHI Associate rapporteur Email: kaoru.kenyoshi@emea.nec.com |
Q12/11 (WP3/11) Testing of Internet of things, its applications and identification systems | Steve LIANG Rapporteur Email: liangs@ucalgary.ca |
| Kazunori TANIKAWA Associate rapporteur Email: k-tanikawa@cq.jp.nec.com |
| Ruslan KIRICHEK Associate rapporteur Email: ruslan.stk@gmail.com |
Q13/11 (WP3/11) Monitoring parameters for protocols used in emerging networks, including cloud computing and software-defined networking/network function virtualization (SDN/NFV) | Minrui SHI Rapporteur Email: shimr@sttri.com.cn |
| Xu LU Associate Rapporteur E-mail: luxu@caict.ac.cn |
Q14/11 (WP3/11) Cloud interoperability testing | Nan CHEN Rapporteur Email: chenn@gsta.com |
Q15/11 (WP3/11) Combating counterfeit and stolen ICT equipment | João Alexandre MONCAIO ZANON Rapporteur Email: zanon@anatel.gov.br |
| Isaac BOATENG Associate rapporteur Email: isaac.boateng@nca.org.gh |
CASC Conformity Assessment Steering Committee | Isaac BOATENG Chairman Email: isaac.boateng@nca.org.gh |
| Khoa NGUYEN VAN Vice-chairman Email: nvkhoa@mic.gov.vn |
| Karim LOUKIL Vice-chairman Email: karim.wakil@cert.mincom.tn |
The final list of Rapporteurs and Associate Rapporteurs can be found in TD 13 Rev.1 (GEN/11).
SG11 approved the appointment of new liaison officers and representatives as follows:
ENTITY | CONTACT |
CITEL Inter-American Telecommunication Commission | João Alexandre MONCAIO ZANON Liaison officer E-mail: zanon@anatel.gov.br |
E-health related studies in SG11 E-health related studies in SG11 | Cheng LI Liaison officer E-mail: licheng@caict.ac.cn |
ETSI ETSI STQ, INT | Martin BRAND Liaison officer E-mail: martin.brand@a1telekom.at |
GSMA GSM Association | Xiaojie Zhu Liaison officer E-mail: zhuxj@gsta.com |
ISO/IEC JTC 1/SC 6 ISO/IEC JTC 1/SC 6 | Shin-Gak KANG Liaison officer E-mail: sgkang@etri.re.kr |
ITU-D SG2 ITU-D SG2 | Isaac BOATENG Liaison officer E-mail: isaac.boateng@nca.org.gh |
ITU-R SGs ITU-R Study Groups | Xiaojie ZHU Liaison officer E-mail: zhuxj@gsta.com |
ITU-T SG12 ITU-T Study Group 12 (QoS) | Kaoru KENYOSHI Liaison officer E-mail: kaoru.kenyoshi@emea.nec.com |
ITU-T SG13 ITU-T Study Group 13 (NGN, FN, IMT-2020) | Shin-Gak KANG Liaison officer E-mail: sgkang@etri.re.kr |
ITU-T SG15 ITU-T Study Group 15 (Access) | Junfeng MA Liaison officer E-mail: majunfeng@caict.ac.cn |
ITU-T SG16 ITU-T Study Group 16 (Multimedia) | Shin-Gak KANG Liaison officer E-mail: sgkang@etri.re.kr |
ITU-T SG17 ITU-T Study Group 17 (Security) | Kai HU Liaison officer E-mail: kevinkai.hu@huawei.com |
ITU-T SG20 Internet of things (IoT) and smart cities and communities (SC&C) | Kaoru KENYOSHI Liaison officer E-mail: kaoru.kenyoshi@emea.nec.com |
| Ruslan KIRICHEK Liaison officer Email: ruslan.stk@gmail.com |
JCA-AHF Joint Coordination Activity on Accessibility and Human Factors | Kaoru KENYOSHI Liaison officer E-mail: kaoru.kenyoshi@emea.nec.com |
JCA-IoT and SC&C Joint coordination activity on Internet of Things and Smart Cities and Communities | Kaoru KENYOSHI Liaison officer E-mail: kaoru.kenyoshi@emea.nec.com |
JCA-SDN Joint Coordination Activity on Software-Defined Networking | Jia HE Liaison officer E-mail: hejia@huawei.com |
SCV Standardization Committee for Vocabulary | João Alexandre MONCAIO ZANON Vocabulary Rapporteur Email: zanon@anatel.gov.br |
PR Public Relations | Kaoru KENYOSHI Liaison officer E-mail: kaoru.kenyoshi@emea.nec.com |
RCC Regional Commonwealth in the field of Communications | Aleksey BORODIN Liaison officer E-mail: alexey.borodin@rt.ru / borodin.msk@mail.ru |
SG11 Mentor SG11 Mentor | Kaoru KENYOSHI E-mail: kaoru.kenyoshi@emea.nec.com |
OGC Open Geospatial Consortium | Steve LIANG Liaison Officer E-mail: steve.liang@ucalgary.ca |
The final list of Liaison Officers and representatives can be found in TD 12 Rev.4 (GEN/11).
6 Action plan of ITU-T SG11 for the new Study Period (2017-2020)
During the first meeting of SG11, the Chairman requested SG11 Management team to give a short overview that highlights their plans for the current Study Period. These documents became a basis for the SG11 action plan which lists the key SG11 priorities for the next four years. The action plan is available in TD 173 (GEN/11).
7 SDN 5G/IMT-2020
SG11 made progress on ongoing work items which are related to SDN as follows:-
ITU-T Q.SAN-MIM: Signalling requirements of SDN-based access networks with media independent management capabilities;
-
ITU-T Q.NEA-REQ: Signalling Requirements of NFV Entity Management for Network Attachment;
- ITU-T X.mp2p-mssr: Managed peer-to-peer communications: Multimedia Streaming Signalling Requirements;
- X.mp2p-mspp: Managed peer-to-peer communications: Multimedia Streaming Peer Protocol;
- X.mp2p-msomp: Managed peer-to-peer communications: Multimedia Streaming Overlay Management Protocol;
Most of them will be proposed for consent at the next meetings (WP2/11 meeting, July 2017) and the next SG11 meeting (8-17 November 2017).
More information on these activities is available in the WP2/11 report, TD 117 (GEN/11).
8 SS7 security
SG11 started working on SS7 security through creating an amendment to ITU-T Q.731.3. The output document which contains the draft amendment is available in TD 137 (GEN/11).
The Chairman of SG11 also invited Mr Raymond Tu to give a presentation of a mechanism for authentication for caller id which was highlighted in his paper submitted to ITU Kaleidoscope 2016. For more details please see TD 79 (GEN/11) and TD 60 (GEN/11).
9 Third meeting of the ITU-T Conformity Assessment Steering Committee (CASC)
The third meeting of the CASC was addressed in two sessions on Monday 13 February 2017 from 9:30am and was chaired by Mr Isaac Boateng.
The CASC agreed the Guidelines “ITU-T CASC procedure to appoint ITU-T technical experts” which was further approved at the closing meeting of ITU-T SG11. The output document can be found in TD 144 (GEN/11).
The CASC was informed by IECEE about the received responses on IECEE inquiry on ITU Recommendations to be used for certification. Among IECEE members which provided feedback are: Italy, Slovenia, Switzerland and Viet Nam. The CASC noted that there is market need for conformance testing against ITU-T Recommendations. The meeting then decided to inform all SGs on the responses of IEC enquiry on testing against ITU-T Recs. The outgoing LS is available in TD 163 (GEN/11).
The CASC continues collaborating with IECEE through established Task Force (TF) “Certification Management Committee (CMC) Task Force ITU Requirements”. The Chairman of CASC presented the list of CASC representatives who were nominated to this TF. The CASC will be informed on the outcome of the TF meetings at the next CASC meetings. There are the following meetings of CASC in 2017:-
12 July 2017 (e-meeting);
-
9 and 15 November 2017 (physical meetings, Geneva, during SG11 meeting).
The meeting report can be found in TD164 (GEN/11). More details are available on the ITU-T CASC web page.10 VoLTE/ViLTE interconnection
SG11 made progress on ongoing work items Q.30xx_VoLTE_Interconnection_FW “Framework of interconnection of VoLTE/ViLTE-based networks” and revised Recommendation ITU-T Q.1912.5 “Interworking between Session Initiation Protocol (SIP) and Bearer Independent Call Control protocol or ISDN User Part”. Both documents are planned for consent during next the SG11 meeting (8-17 November 2017).
In addition, SG11 decided to start two new work items which deal with VoLTE issues. Among them are:
-
Q.suppl.VoLTE_ETS_Interconnection “Signalling requirements for interconnection between VoLTE-based network and other networks supporting emergency telecommunications service (ETS)”;
-
Q.VoLTE_INT_TEST “VoLTE/ViLTE interconnection testing for interworking and roaming scenarios including relevant QoS/QoE testing”.
The discussion of these work items will continue at the rapporteur group meetings, including joint meetings with ETSI TC INT, which are scheduled to take place in March and June 2017. The full list of interim meetings is available on the SG11 web page.
11 Implementation of ITU C&I Programme
According to received inputs from different ITU-T SGs, ITU-T SG11 updated the reference table of ITU-T Recommendations suitable for C&I testing and the list of pilot projects on conformance testing against ITU-T Recommendations. The information was updated on the ITU C&I Portal accordingly:12 Internet related performance measurements
SG11 continue working on the ongoing draft Recommendation ITU-T Q.3961. It was agreed to align the title of draft ITU-T Q.3961 with the current mandate of SG11. The agreed title of the draft ITU-T Q.3961 is “Testing methodologies of Internet related performance measurements including e2e bit rate within the fixed and mobile operator’s networks”.
The text was improved and the group decided to continue improving this document at the relevant Rapporteur groups as indicated on the SG11 web page. The meeting report can be found in TD 109 (GEN/11). 13 Collaboration with ETSI TC INT
SG11 continue collaborating with ETSI TC INT through joint activities related to the following areas:
-
Framework of Interconnection of VoLTE/ViLTE networks;
-
Testing specifications of VoLTE/ViLTE interconnection;
- Internet related performance measurements.
The next joint meeting of Q2, 9 and 11/11 and ETSI TC INT is scheduled to take place in Vienna (hosted by Austria Telekom) from 28-30 March 2017. All details are available on the SG11 web page.
14 Combating counterfeit ICT and mobile device theft
SG11 approved the survey report on counterfeit ICT devices in Africa region, TD 1199 Rev.1 (GEN/11). This report will be posted as a Technical Report.
SG11 started a new work item ITU-T Q.FW_CSM" Framework for combating the use of Stolen Mobile ICT Devices".
Two draft technical reports have been revised, as follows:
-
Q.FW_CCF: Framework for solution to combat counterfeit ICT Devices
-
TR-CF_BP: Technical Report - Guidelines on Best Practice and Solutions for Combating Counterfeit ICT
SG11 also decided to create the plans for Implementation of WTSA-16 Resolution 96 and Resolution 97 according to the received contributions. More details are available in the WP3/11 report, TD 118 Rev.1 (GEN/11).
15 Testing of Internet of things, its applications and identification systems
SG11 started a new work item Q.Het_IoT_Gateway_Test which will describe the testing methodology of the heterogeneous network gateway which is to be used for communication among IoT devices.
Also, SG11 made progress on ongoing work items which are related to IoT testing, as follows:
-
Q.39_IoT_MN_test "The architecture and facilities of Model network for IoT testing"
-
Q.FW_IoT/Test “Framework for IoT Testing”
- Q.39_FW_Test_ID_IoT “The framework of testing of identification systems used in IoT”
16 Outgoing Liaison Statements
The following table shows the list of the fifteen agreed outgoing liaison statements. See TD 10 (GEN/11)
# | Q (s) | For: | To: | Title | Reference |
1 | 2/11 | Info | SG2 | LS/o on work item Q.30xx_VoLTE_Interconnection_FW [to ITU-T SG2] | TD 139 |
2 | 4/11 | Info | SG13, JCA-SDN, ONUG | LS/o on recent SDN-related developments in SG11: one new work item [to ITU-T SG13, JCA-SDN, ONUG] | TD 134 |
3 | 5/11 | Info | SG13, JCA-SDN | LS/o on recent SDN-related progress in Q5: one consented Recommendation plus one new work item [to SG13, JCA-SDN] | TD 143 |
4 | 9/11 | Info | IETF BMWG | LS/o/r on SG11's views on IETF BMWG - LS 1 -E and IETF BMWG - LS 2 -E (LS/i on proposal to develop a Benchmarking Methodology for ITU-T Recommendation Y.1731 OAM Performance) (reply to IETF BMWG LS1&2) [to IETF BMWG] | TD 120 Rev.1 |
5 | 9/11 | Info | ITU-D SG1, All ITU-T Study Groups, TDAG, TSAG | LS/o/r on Operational Plan for Implementation of WTSA-16 Resolution 95 (Hammamet, 2016) | TD 119 Rev.1 |
6 | 11/11 | Info | All ITU-T SGs | LS/o on Implementation of ITU C&I Programme [to all ITU-T SGs] | TD 125 |
7 | 14/11 | Action | ISO/IEC JTC1 SC38 WG4 | LS/o on cloud computing interoperability [to ITU-T ISO/IEC JTC1 SC38 WG4] | TD 93 |
8 | 14/11 | Info | SG2 | LS/o/r to SG2 on Telecommunication Management and OAM Project Plan (reply to SG2-LS 155 -E) [to ITU-T SG2] | TD 92 |
9 | 14/11 | Info | SG13 | LS/o/r to SG13 on information update in draft Supplement on Cloud Computing Standardization Roadmap (reply to SG13-LS 157 -E) [to ITU-T SG13] | TD 91 |
10 | 15/11 | Action | APT, ATU, CITEL, EUR, RCC ; SG2, SG5, SG3, SG17, SG20 | LS/o on ITU-T SG11 work on the combat of counterfeit ICT devices and mobile device theft | TD 167 Rev.1 |
| | Info | OCDE, WIPO, WTO, 3GPP, MWF, GSMA | | |
11 | All/11 | Action | TSAG | LS/o on implementation of Resolution 44 of WTSA-16 — bridging the standardization gap between developing and developed countries [to TSAG] | TD 168 |
12 | All/11 | Info | SCV | LS/o/r on ongoing collaboration (reply to SCV LS11) [to SCV] | TD 169 |
13 | All/11 | Info | ITU-D SG2 | LS/o/r on ongoing collaboration [to ITU-D SG2] | TD 170 |
14 | CASC | Action | All ITU-T Study Groups | LS/o on appointment of SGs Focal Points to CASC and outcomes of CASC meeting (13 February 2017) | TD 163 |
15 | CASC | Info | SG12 | LS/o/r on feedback from SG12 to SG11/CASC and TSAG regarding tests of the compatibility between mobile phones and vehicle hands-free terminals (reply to SG12 LS8) [to ITU-T SG12] | TD 162 |
17 Approved new work itemsThe following table shows the list of the nine new work items. See
TD 171 (GEN/11)N. | Q | Work item (Draft Recs) | Status | Title | Editor | Timing | Ref. |
1 | 1/11 | Q.VCNSA | New | Signalling architecture supporting virtualization of control network entities | Jinlan Ma, China Telecom P.R.China majl.gd@chinatelecom.cn Xiaojie ZHU (Judy), China Telecom P.R.China zhuxj.gd@chinatelecom.cn | 2019-02 | TD 160 Rev.1 |
2 | 2/11 | Q.731.3-Amendment1 | New | Amendment for ITU-T Q.731.3 STAGE 3 DESCRIPTION FOR NUMBER IDENTIFICATION SUPPLEMENTARY SERVICES USING SIGNALLING SYSTEM No.7 | Shi Minrui China TelecomChina shimr@sttri.com.cn Wu Tong China Telecom China E-mail: wutong@chinatelecom.cn | 2018-02 | TD 137 |
3 | 3/11 | Q.suppl.VoLTE_ETS _Interconnection | New | Signalling requirements for interconnection between VoLTE-based network and other networks supporting emergency telecommunications service (ETS) | Jinlan Ma,China Telecom,China majl.gd@chinatelecom.cn Xiaojie Zhu,China Telecom, China zhuxj.gd@chinatelecom.cn | 2019-02 | TD 151 |
4 | 3/11 | Q.suppl.NGN_pri_ Interconnection | New | Signalling requirements for interconnection between NGN and GSM/UMTS networks supporting priority calls | Sunil Purohit Telecommunication Engineering Center, DoT,India ddgs.tec@gov.in Harsh SharmaTelecommunication Engineering Center, DoT, India adetngs.tec@gov.in Mukesh Dhingra Tata Teleservices limited (TTSL), India mukesh.dhingra@tatatel.co.in | 2019-02 | TD 150 |
5 | 4/11 | Q.SD-WAN | New | Signalling Requirement for SD-WAN Service | Cancan Huang, China Telecom, huangcc@gsta.com Huanan Chen, China Telecom, chenhuanan@gsta.com | 2019-3 | TD 133 |
6 | 5/11 | Q.BNG-CFS | New | Signalling requirements for separation of control and forwarding plane in vBNG | Aipeng Guo guoap7@chinaunicom.cn Junfeng MA majunfeng@caict.ac.cn Bo Lei leibo@ctbri.com.cn | 2019-7 | TD 124 |
7 | 11/11 | Q.VoLTE_INT_TEST | New | VoLTE/ViLTE interconnection testing for interworking and roaming scenarios including relevant QoS/QoE testing | Martin Brand (AT1) martin.brand@a1telekom.at Gerhard Ott (DT) Gerhard.ott@telecom.de | 2018 | TD 122 |
8 | 12/11 | Q.Het_IoT_Gateway_Test | New | The structure of the testing of heterogeneous Internet of Things gateways in a laboratory environment | Alexey Borodin alexey.borodin@rt.ru Ruslan Kirichek kirichek@sut.ru | 2018 | TD 157 |
9 | 15/11 | Q.FW_CSM | New | Framework for Combating the use of Stolen Mobile ICT Devices | João Alexandre MONCAIO ZANON zanon@anatel.gov.br | 2018-4Q | TD 165 |
18 Work plan for interim Working Party and Rapporteur meetings
The following represents the interim meetings plan as agreed at SG11 Plenary (Geneva, 15 February 2017). Also in TD 11 Rev.2 (GEN/11)
18.1 Working parties
Two interim Working Parties meetings will be held before the next SG11 meeting.
WP | Date | Place / Host | Terms of reference | Contact |
WP1/11 | 12 July 2017 | Geneva/TSB | To finalize and consent Q.SCO | TSB/ITU Secretariat: tsbsg11@itu.int |
WP2/11 | 13 July 2017 | Geneva/TSB | Consent ITU-T X.mp2p-mssr Approve all WP2/11 output documents Collaboration on WP2/11 related issues with other groups | TSB/ITU Secretariat: tsbsg11@itu.int |
18.2 Rapporteur groups
The following interim Rapporteurs’ groups meetings are agreed by SG11 Plenary (Geneva, 15 February 2017).
Question | Date | Place / Host | Terms of reference | Contact |
Joint Q2/11-ETSI TC INT | 28-30 March 2017 | Vienna (Austria Telekom) Confirmed | Draft Rec. Q.30xx_VoLTE_Interconnection_FW "Framework of interconnection of VoLTE/ViLTE-based networks" | Host: Martin BRAND, martin.brand@a1telekom.at TSB/ITU Secretariat: tsbsg11@itu.int ETSI Secretariat: Helene Schmidt helene.schmidt@etsi.org ETSI announcement |
Joint Q9/11-ETSI TC INT | 28-30 March 2017 | Vienna (Austria Telekom) Confirmed | Draft Q.3961 "Testing methodologies of Internet related performance measurements including e2e bit rate within the fixed and mobile operator’s networks" | Host: Martin BRAND, martin.brand@a1telekom.at TSB/ITU Secretariat: tsbsg11@itu.int ETSI Secretariat: Helene Schmidt helene.schmidt@etsi.org ETSI announcement |
Joint Q11/11-ETSI TC INT | 28-30 March 2017 | Vienna (Austria Telekom) Confirmed | Draft Q.VoLTE_INT_TEST
"VoLTE/ViLTE interconnection testing for interworking and roaming scenarios including relevant QoS/QoE testing" | Martin BRAND, martin.brand@a1telekom.at TSB/ITU Secretariat: tsbsg11@itu.int ETSI Secretariat: Helene Schmidt helene.schmidt@etsi.org ETSI announcement |
Q4/11 | 15-17 May 2017 13:00-15:00 (Geneva time) | e-meeting | Progress Q.SCO to be ready for consent Progress Q.PVMapping | Ying CHENG chengying10@chinaunicom.cn |
Q8/11 | 22-26 May 2017 | e-meeting | Progress all Q8/11 on-going work items | Shin-Gak KANG (sgkang@etri.re.kr) |
Joint Q2/11-ETSI TC INT | 27-29 June 2017 | Sophia Antipolis (ETSI HQ) Planned | Draft Rec. Q.30xx_VoLTE_Interconnection_FW "Framework of interconnection of VoLTE/ViLTE-based networks" | Martin BRAND, martin.brand@a1telekom.at TSB/ITU Secretariat: tsbsg11@itu.int |
Joint Q9/11-ETSI TC INT | 27-29 June 2017 | Sophia Antipolis (ETSI HQ) Planned | Draft Q.3961 "Testing methodologies of Internet related performance measurements including e2e bit rate within the fixed and mobile operator’s networks" | Martin BRAND, martin.brand@a1telekom.at TSB/ITU Secretariat: tsbsg11@itu.int |
Joint Q11/11-ETSI TC INT | 27-29 June 2017 | Sophia Antipolis (ETSI HQ) Planned | Draft Q.VoLTE_INT_TEST
"VoLTE/ViLTE interconnection testing for interworking and roaming scenarios including relevant QoS/QoE testing" | Martin BRAND, martin.brand@a1telekom.at TSB/ITU Secretariat: tsbsg11@itu.int |
Q1/11 | 3-14 July 2017 | Geneva | Progress Q.VCASA Consider any new work item | Huan DENG denghuan.bri@chinatelecom.cn |
Q3/11 | 3-14 July 2017 | Geneva | Progress Q.suppl.VoLTE_ETS_Interconnection and Q.suppl.NGN_pri_Interconnection | Xiaojie ZHU zhuxj@gsta.com |
Q4/11 | 3-14 July 2017 | Geneva | Consent Q.SCO Progress Q.PVMaaping to be ready for consent Progress Q.SMO and Q.SVDC Discuss new work item introduced by contributions Review the work program and modify the Action Plan | Ying CHENG chengying10@chinaunicom.cn |
Q5/11 | 3-14 July 2017 | e-meeting | Progress on recommendation of Q.BNG-DBoD | MA Junfeng majunfeng@caict.ac.cn GUO Aipeng guoap7@chinaunicom.cn |
Q6/11 | 3-14 July 2017 | Geneva | Discuss new work item proposals LSs with other related organizations | Haining WANG wanghn.bri@chinatelecom.cn |
Q7/11 | 3-14 July 2017 | Geneva | Progress all current work items of Q7/11 Discuss new work proposals | Jongmin LEE jminlee@sk.com |
Q8/11 | 3-14 July 2017 | Geneva | Propose Consent of ITU-T X.mp2p-mssr Progress all Q8/11 on-going works Discuss new work proposals | Shin-Gak KANG (sgkang@etri.re.kr) |
Q13/11 | 3-14 July 2017 | ITU/Geneva with remote facilitation | Handle the input contributions Consider new Wis | Minrui SHI shimr@sttri.com.cn |
Q14/11 | 3-14 July 2017 | ITU/Geneva with remote facilitation | Handle the input contributions Consider new Wis Progress on the open work items for Q14/11 | CHEN Nan chenn@gsta.com |
CASC | 12 July 2017 | e-meeting | To consider contribution of ITU members for progressing work items of CASC and possible revision of CASC ToR to adapt to WTSA-16 Resolution 2 and Resolution 76; To discuss progress on collaboration with existing certification programmes on the ITU-T Recommendations which are proposed to be subjects of joint certification schemes; To update list of focal points to CASC. To discuss documents which need to be prepared for such collaboration; To progress the other work items of the CASC. | Isaac BOATENG isaac.boateng@nca.org.gh tsbcasc@itu.int |
Q8/11 | 28 August-1 September 2017 | e-meeting | Progress all Q8/11 on-going work items | Shin-Gak KANG (sgkang@etri.re.kr) |
Q7/11 | 4-7 September 2017 8 September 2017 | e-meeting CC | Progress all current work items of Q7/11 and discuss new work proposals | Jongmin LEE jminlee@sk.com |
19 Regional Groups’ meetings
SG11 was informed about Regional Groups’ meetings which are scheduled for 2017, as follows:
Note: the Regional Group will take place back-to-back with the
SG11 Regional Workshop for Africa on "Counterfeit ICT Devices, Conformance and Interoperability Testing Challenges in Africa" (5 April 2017), the
SG13 Regional Workshop (2-3 April 2017) and the Regional Group of SG13 (
SG13RG-AFR, 4-5 April 2017)
20 Next Study Group 11 meetingThe next SG11 meeting is scheduled in Geneva, 8-17 November 2017.
The following meeting of SG11 is scheduled in Geneva, 30 April-11 May 2018 (planned).