International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-R : RRB22.3 : Contributions : 17 Recently posted -  Search Meeting Documents
   
[17]  Summary of Decisions of the 91st RRB Meeting (31 October - 4 November 2022)

Format

Size

Posted

English

Word  

73591 bytes 2022-11-14 [17] Corrigendum 1

PDF (acrobat)  

224407 bytes 2022-11-14 [17] Corrigendum 1

Word  

128060 bytes 2022-11-07 [17] 

PDF (acrobat)  

582039 bytes 2022-11-07 [17] 
Arabic

PDF (acrobat)  

594532 bytes 2022-11-22 [17] Revision 1

Word  

122091 bytes 2022-11-22 [17] Revision 1

PDF (acrobat)  

590264 bytes 2022-11-17 [17] 

Word  

121610 bytes 2022-11-17 [17] 
Chinese

PDF (acrobat)  

663072 bytes 2022-11-15 [17] 

Word  

119676 bytes 2022-11-15 [17] 
Español

PDF (acrobat)  

469727 bytes 2022-11-15 [17] 

Word  

128022 bytes 2022-11-15 [17] 
Français

Word  

96756 bytes 2022-11-15 [17] 

PDF (acrobat)  

547949 bytes 2022-11-15 [17] 
Russian

PDF (acrobat)  

474719 bytes 2022-11-22 [17] 

Word  

110410 bytes 2022-11-22 [17] 
 

Document :

ITU-R RRB22.3  Contribution  17

Title :

Summary of Decisions of the 91st RRB Meeting (31 October - 4 November 2022)

Date :

2022-11-07

Source :

Director, BR

Observation :

Corrigendum 1 is in English only and Revision 1 is in Arabic only

Access :

Public Document

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2022-11-22