Executive Summary of the ITU-T Study Group 5 Meeting “Environment, Climate Change and Circular Economy” (Virtual meeting, 19-23 October 2020)​​

Statistics

Main discussions and results
​At its fully virtual meeting, 19-23 October 2020, ITU-T Study Group 5 achieved the following outcomes:Remote participation was provided using MyMeetings. The following TDs were prepared in this regard:​​​ ​ ​​

Major accomplishments​

Approval of the report of the last SG5 meeting​

The report of the last ITU-T SG5 meeting held in Geneva, from 11 to 20 May 2020 was approved as contained in Report 8

Approved Recommendations by ITU-T SG5 (according to A.8 §5)​


​​ITU-T Rec. Number

Title​


Question

TD
​None



Recommendations Consented by SG5 for Last Call (AAP - Recommendation A.8)​

Revised Recommendations​​​​

ITU-T Rec. Number​​​​​​​​Title​Questio​n     TD
K.35
Bonding configurations and earthing at remote electronic sitesQ1/​5
TD1567-R1
K.50
Corrigendum 1 to Recommendation ITU-T K.50 “Safe limits for operating voltages and currents in telecommunication systems powered over the network"
Q2​/5TD1601
K.44
Corrigendum 1 to Recommendation ITU-T K.44 “Resistibility tests for telecommunication equipment exposed to overvoltages and overcurrents - Basic Recommendation"
Q2/5
TD1599
K.147
Corrigendum 1 to Recommendation ITU-T K.147 “Ethernet port resistibility testing for overvoltages and overcurrents”
Q2/5   TD1600
K.145
Assessment and management of compliance with radio frequency electromagnetic field exposure limits for workers at radiocommunication sites and facilitiesQ3/5TD1591
K.70
Mitigation techniques to limit human exposure to EMFs in the vicinity of radiocommunication stationsQ3/5TD1593
K.91
Guidance for assessment, evaluation and monitoring of human exposure to radio frequency electromagnetic fieldsQ3/5TD1592
K.34​
Classification of electromagnetic environmental conditions for telecommunication equipment - Basic EMC RecommendationQ4/5​   TD1589
​​K.78

High altitude electromagnetic pulse immunity guide for telecommunication centres
Q5/5
TD1537-R1
​L.1031
​Guideline for ​achieving the e-waste targets of the Connect 2030 Agenda
​Q7/5
TD1603
​ 
New Recom​mendations

ITU-​T Rec. Number​Work item or provisional nameTitleQuestion           TD
K.148
   K.appmspd    
Multiservice surge protective device application guide 
Q2/5TD1566-R2
K.149
K.pim
Passive intermodulation test methods of array antenna systems in mobile communication systems
Q4/5
       TD1584
K.150
K.soft_dev
Information of semiconductor devices required for design of telecommunication equipment applying soft error mitigation measuresQ5/5

TD1568-R1
A.5 TD1527

L.1304
L.Proc_DC
Procurement Criteria for Sustainable Data Centres
Q6​/5

TD1561-R2
A.5 TD1638

L.1024
L.SEEQEffect for global ICT of the potential of selling services instead of equipment on the waste creation and environmental impactsQ7/​5
TD1597

Agreed informative texts
 
Document​   Work item or provisional                    name                              TitleQuestion        TD
K.Suppl.21 to ​Recommendation ITU-T K.21 
K.Sup.customer
Rationale for setting resistibility requirements of telecommunication equipment installed in customer premises against lightning
Q2/5
TD1604
K.Suppl.22 to Recommendation ITU-T K.45K.Sup.access_trunk_networks
Rationale for setting resistibility requirements of telecommunication equipment installed in the access and trunk networks against lightningQ2/5
TD1587-R1
K.Suppl.23 to Reco​mmendation ITU-T K.147

Supplement to ITU-T K.147Ethernet port surge voltages and currents
Q2/5TD1535
L.Suppl.40 to Recommendation ITU-T L.1371​​
​L.Suppl.scoring_tool
​Scoring tool to assess the sustainability performance of office buildings
Q6/5​
TD1596-R1

L.Suppl.38 to Recommendation ITU-T L.1470

​L.Suppl.TrajectoriesManSupp

Guidance to ICT manufacturers on setting 1.5°C aligned targets compliant with Recommendation ITU-T L.1470


Q9/5

TD1569-R3

Agreed questionnaire

             
Title

Question

​TD
None  


New work items​

TD​Work itemTitle​Question
A.1 TD1595
K.HVAC_400Vdc
Electrical safety and lightning protection of medium voltage input and up to 400VDC output power system in data center and telecommunication room
1/5​
TD1540-R1K.Suppl.spe to ITU-T K.117
Long reach single twisted-pair Ethernet resistibility testing2/5
A.13 TD1541

K.Suppl to ITU-T K.147Ethernet port surge voltages and currents
2/5
​A.1 TD1641
K.87​Guide for the application of electromagnetic security requirements - Overview​​​5/5
​A.1 TD1642​
K.130​Neutron irradiation test methods for telecommunication equipment​​
​5/5
A.1 TD1582-R2
L.Energy_sav _Cloud & EdgeEnergy saving design for Data Centre considering harmonization of Cloud and Edge    6/5
A.1 TD1581-R1
L.Spec_EdgeDCSpecification of Edge Data Centre infrastructure 6/5
A.1 TD1580-R2L.ESEEvaluation method of Safety and Energy saving for power supply system in telecommunication room/buildings  6/5
A.1 TD1571-R1 L.EEMDC
 Energy Efficiency in Micro Data Centre for Edge Computing    6/5
A.13 TD1629-R2
TD1596-R1
L.Suppl.scoring_toolScoring tool to assess the sustainability performance of office buildings
6/5
A.1 TD1616-R1
  TD1606
L.methodology_arch Methodology to assess the environmental impact and e-waste generation of different network architectures
7/5
A.1 TD1609-R2L.TWSMethod for Evaluation of the Environmental and Safety Performance of True Wireless Stereo Products  7/5
A.1 TD1602-R2
 TD1603
L.1031Rev​
Guideline for achieving the e-waste targets of the Connect 2030 Agenda7/5
A.13 TD1608
L.Suppl.resource_sav​Examples of resource saving by using ICT technologies7/5
A.13 TD1583-R1
L.Suppl.Connect2030
Guidance on how to address Connect2030 targets on net abatement9/5
A.1 TD1590-R2L.NetZero
Net-Zero and ICT Sector
9/5
A.13 TD1635-R1L.Suppl.GR_Deal
Green deal best practices
9/5

Contributions​​

The full list of Contributions can be found in TD1523-R1.| The following Contributions have been addressed to QAll/5:​

C​TitleSubmitterComment
C 712

Korea Green New Deal Initiative and ICTKorea (Rep. of)​As per agreement of the experts, this Contribution was discussed during the WP2/5 opening plenary​.
C 718
​EMF exposure evaluation on non-radiocommunication installations
Korea (Rep. of)​​As per agreement of the experts, this Contribution was discussed during the Q3/5 sessions. 

C-719

Proposed new study item on "suggestion of promoting standard implementation in national and organizational members"    Ministry of Industry and Information Technology (MIIT) (China)This Contribution was discussed and was noted by SG5 experts.
 ​
Action plans for the implementation of WTSA-16 Resolutions 72 and 73 (Rev. Hammamet, 2016) and Resolution 79 (Dubai, 2012) (human exposure to EMF, environment and climate change, and e-waste)

TD1511-R3 contains a proposed “Action Plan" for the implementation of WTSA-16 Resolutions 72 and 73 (Rev. Hammamet, 2016) and Resolution 79 (Dubai, 2012) (human exposure to EMF, environment and climate change, and e-waste). Rapporteurs were requested to discuss the draft Action Plan during their respective sessions. The draft Action Plan was approved during the closing plenary and it was agreed that TSB SG5 Secretariat will add the results of this meeting.

Highlights from TSAG
The sixth TSAG meeting was held from 21 to 25 September 2020. The report of the TSAG meeting is available as TSAG Report 10. The 7th TSAG meeting is planned to take place virtually from 11 to 18 January 2021.

List of future stale work items

TSB provided information on the list of possible future stale work items (in three months) as contained in TD1534. The Rapporteurs of the concerned Questions (Q2/5, Q3/5, Q4/5, Q6/5,) were encouraged to discuss these work items during their respective sessions and take appropriate action. ITU-T SG5 Regional Groups.​

ITU-T SG5 Regional Group for Latin America (SG5RG-LATAM)

The SG5RG-LATAM Chairman, Mr Miguel Felipe Anzola Espinosa announced that the next meeting of the SG5RG-LATAM meeting is due to take place on 10 November 2020. The meeting will be preceded by the 10th  International Spectrum Congress: "Engine of economic and Social growth" hosted by the National Agency for Spectrum, Colombia.

More information on SG5RG-LATAM is available at https://www.itu.int/en/ITU-T/studygroups/2017-2020/05/sg5rglatam/Pages/default.aspx.

ITU-T SG5 Regional Group for Asia and the Pacific (SG5RG-AP)

Collaboration matters and Information Sharing

The following TDs were presented by TSB and were noted during the ITU-T SG5 opening plenary:​​​

  • ​TD1536-R7 EMF Background paper
  • TD1529 AI for Good Summit
  • TD1533 New Global Portal
  • TD1490 U4SSC
  • TD1637 Events on E-waste and EMF-African region
  • TD1502 BSG e-learning course: A.1 online course
  • TD1506 Bridging the standardization gap and Regional Groups

  • The following information on Workshops, Training and Forums of interest to ITU-T SG5 were presented by TSB and were noted during the ITU-T SG5 plenary:

    Session on "Using international standards to build smart sustainable cities and tackle climate change, e-waste and nature loss", 15 October 2020

     ITU-T SG5 Newcomer session

    The following documents were briefly presented and noted during the ITU-T SG5 opening plenary:​​​​

  • TD1505 Presentation on ITU-T Study Group 5 "Environment, climate change and circular economy" 
  • TD1475 ITU-T Study Group 5: Newcomer Welcome Pack 
  • TD1476 ITU-T Study Group 5 Work programme
  • TD1478 Guidelines for the preparation of Contributions to ITU-T: Relevant ITU A-series Recommendation
  • TD1507 Template for A.1 justification information: Format for describing a proposed new Recommendation in the work programme
  • TD1508 Template for A.13 justification information: Format for describing a proposed new non-normative document in the work
          programme
  • TD1509 Template for A.25 justification information: Format for documenting a study group or working party decision
  • Newcomers were invited to contact the ITU-T SG5 Secretariat should they be interested in receiving a presentation for newcomers.

    Working Party meetings

      • The draft Report of Working Party 1/5 can be found in TD1500-R2
      • The draft Report of Working Party 2/5 can be found in TD1501-R2.

    Question 8/5 - Guides and terminology on environment and climate change

    During this meeting, Q8/5 achieved the following key outcomes:
    Q8/5 experts discussed the new IEC version 6 template. The template is strongly integrating with Microsoft Word and some Word existing functions become inaccessible.​
    Additionally, Q8/5 experts reviewed 5 incoming liaison statements and prepared the respective responses.
    The meeting report of Question 8/5 can be found in TD1498-R1.

    Working Party 1/5 - EMC, lightning protection, EMF

    Working Party 1/5 has made significant progress and achieved the following key outcomes:

    Question 1/5 - Protection of information and communication technology (ICT) infrastructure from electromagnetic surges
    The Rapporteur of Q1/5 (Mr Chuanyou Dai) opened the meeting and presented the draft agenda contained in TD1481-R3, which was approved without modifications.

    Three Contributions and five TD documents relevant to Q1/5 were received and discussed during the meeting. The Work programme was updated for completion dates and on editors.

    During the meeting, it was agreed to submit draft revised Recommendation ITU-T K.35 “Bonding configurations and earthing at remote electronic sites" for consent. The additional review texts for draft Recommendations ITU-T K.56 “Protection of radio base stations against lightning discharges" and ITU-T K.112 “Lightning protection, earthing and bonding: Practical procedures for radio base stations" were prepared. However, the texts are pending confirmation from the expert from Greece who submitted the comments.

    During this meeting one new work item, draft Recommendation ITU-T K.HVAC_400Vdc “Electrical safety and lightning protection of medium voltage input and up to 400VDC output power system in data center and telecommunication room", was discussed and agreed.
    One incoming liaison statement TD1553, “LS/i/r on a new Work Item for Surge Protective Device Module (reply to SG5-LS153) [from IEC SC37A]" was received. Based on the discussion held within Q1/5, it was agreed to prepare the draft reply as contained in TD1577-R1.

    The report of Q1/5 meeting is contained in TD1491-R1.

    Question 2/5 - Equipment resistibility and protective components
    The Rapporteur of Q2/5 (Mr Mick Maytum) opened the meeting and presented the draft agenda contained in TD1482-R1,​ which was approved without modifications.

    Fourteen Contributions and five liaison statements where discussed and reviewed. During the meeting three Supplements, three corrigendum's and one new Recommendation were completed. Q2/5 experts reviewed the incoming liaison statement TD1521 on Power over Ethernet (PoE) and Power over Data Lines (PoDL) [from IEEE 802.3 Working Group]. This LS provided 81 comments on Recommendation ITU-T K.147 “Ethernet port resistibility testing for overvoltages and overcurrents", some of which entailed redrawing Figures. Due to time constraint, a full review of TD1521 could not completed.

    The report of Q2/5 meeting is contained in TD1492-R1.

    Question 3/5 - Human exposure to electromagnetic fields (EMFs) from information and communication technologies (ICTs)
    The Rapporteur of Q3/5 (Mr Fryderyk Lewicki) opened the meeting and presented the draft agenda contained in TD1483-R3, which was approved with modifications.

    During ten Q3/5 sessions, 21 input documents (including 11 Contributions) have been discussed.

    Three Recommendations were revised and submitted for consent: ITU-T K.91 “Guidance for assessment, evaluation and monitoring of the human exposure to RF EMF", the Recommendation ITU-T K.70 “Mitigation techniques to limit human exposure to EMF's within vicinity of radiocommunication stations" and Recommendation ITU-T K.145 “Assessment and management of compliance with RF EMF exposure limits for workers at radiocommunication sites and facilities" in which the new Appendix with example of the use of an RF exposimeter was added.

    Three input Liaison Statements have been considered and noted. The outgoing Liaison Statement providing information on the results of Q3/5 virtual meeting to ITU-R and ITU-D was prepared in order to continue the good collaboration with both Sectors.

    The document “Background paper on Implementing 5G for Good: Does EMF Matter?" received from ITU Office for Europe was extensively discussed and many improvements were proposed. 

    Contributions with information on results of assessment of the RF EMF exposure from 5G systems was received and will be used in development and revision of the ITU-T Recommendations and Supplements.

    Many informative documents have been discussed and will be used to enrich the future work of Q3/5. The work programme has been discussed, updated and approved.

    The report of Q3/5 meeting is contained in TD1493-R2.

    Question 4/5 - Electromagnetic compatibility (EMC) issues arising in the telecommunication environment
    The Co-rapporteurs of Q4/5 (Mr Beniamino Gorini/ Mr Xing Hai Zhang) opened the meeting and presented the draft agenda contained in TD1484-R2, which was approved with modifications.

    All documents related to Question 4/5 were discussed in the meeting segments from 19 to 21 October 2020. Seven technical Contributions were received and discussed.

    Recommendations submitted for consent are:

     -  Draft Recommendation ITU-T K.pim "Passive intermodulation test methods of array antenna systems in mobile communication
        systems"; ref.: SG5-TD1584
      - Draft revised Recommendation ITU-T K.34 “Classification of electromagnetic environmental conditions for telecommunication equipment
       ​ Basic EMC Recommendation"; ref.: SG5-TD1589

    Progress was made on the following work items:
     -  Revision of Recommendation ITU-T K.123 "Electromagnetic compatibility requirements for electrical equipment in telecommunication
        facilities"; the second draft was discussed and revised (ref.: SG5-TD1563).
     -  New draft Recommendation ITU-T K.plc.emc "Electromagnetic compatibility requirements and measurement methods for outdoor
        equipment and installation using power line communication technology"; the first draft was produced (ref.: SG5-TD1570-R1).
      - Revision of Recommendation ITU-T K.137 "Electromagnetic compatibility requirements and measurement methods for wireline
        telecommunication network equipment"; the second draft was produced (ref.: SG5-TD1585).
      - New draft Recommendation ITU-T K.power_emc of “Electromagnetic compatibility requirements for power equipment
       in telecommunication facilities"; the second draft was produced (ref.: SG5-TD1607). 

    A Contribution on the future work of Recommendation ITU-T K.43 “Immunity requirements for telecommunication network equipment" was discussed (ref.: SG5-C-691). It was decided to check the scopes of the existing EMC Recommendations to verify whether ITU-T K.43 should be revised or withdrawn because requirements might be already covered by other Recommendations.

    A new Contribution on the issues with CDNs for surge immunity test in IEC 61000-4-5 was also discussed (ref.: SG5-C-705) and it was agreed to consider this for the adoption of IEC 61000-4-5 Ed.2 or Ed.3 in ITU-T EMC Recommendations. Moreover, it was agreed to perform further investigations to check if the test methods in Ed.2 or Ed.3 of IEC 61000-4-5 are equivalent.

    Q4/5 work programme was reviewed and updated.

    The liaison statements assigned to Q4/5 were discussed and responses were prepared, where required.

    The report of Q4/5 meeting is contained in TD1494-R1.

    Question 5/5 - Security and reliability of information and communication technology (ICT) systems from electromagnetic and particle radiations
    The Rapporteur of Q5/5 (Mr Yuichiro Okugawa) opened the meeting and presented the draft agenda contained in TD1485-R2, which was approved without modifications.

    Draft Recommendation ITU-T K.soft_dev, “Information of semiconductor devices required for design of telecommunication equipment applying soft error mitigation measures" (TD1568-R1) and drat revised Recommendation ITU-T K.78, “High altitude electromagnetic pulse immunity guide for telecommunication centres" (TD1537-R1) were reviewed, discussed and submitted for consent.

    The report of Q5/5 meeting is contained in TD1495-R2.

    Working Party 2/5 - Environment, Energy Efficiency and the Circular Economy

    Working Party 2 has made significant progress and has achieved the following key outcomes:

    Question 6/5 - Achieving energy efficiency and smart energy
    The Rapporteur of Q6/5 (Ms Qi Shuguang) opened the meeting and presented the draft agenda contained in TD1486-R3, which was approved with modifications.

    All nine (9) Contributions were reviewed and the documents under study were improved based on the contributions received. Three (3) incoming liaison statements were ​​discussed and six (6) outgoing liaisons were prepared.

    Based on discussions that took place in Q6/5, it was agreed to propose for consent new draft Recommendation ITU-T L.Proc_DC “Procurement Criteria for Sustainable Data Centres" and for agreement draft Supplement ITU-T L.Suppl.scoring_tool “Scoring tool to assess the sustainability performance of office buildings".

    Q6/5 held a meeting together with ETSI EEPS. The incoming Liaisons from ETSI were discussed and draft replies were prepared.

    The following new work items including ITU-T L.ESE “Evaluation method of Safety and Energy saving for power supply system in telecommunication room/buildings", L.Spec_EdgeDC “Specification of Edge Data Centre infrastructure", L.EEMDC “Energy Efficiency in Micro Data Centre for Edge Computing" and L. Energy_sav_Cloud & Edge “Energy saving design for Data Centre considering harmonization of Cloud and Edge", L.Suppl.scoring_tool “Scoring tool to assess the sustainability performance of office buildings" were created.
    Q6/5 experts progressed on the following draft Recommendation based on the Contributions received:​​​

  •   Draft Recommendation ITU-T L.SM_EN “Smart energy for cities and home applications"
  •   Draft Recommendation ITU-T L.PSU_for server “Methodologies for evaluating the functionality and performance of power supply
           unit configured for servers",
  •  ​ Draft Recommendation ITU-T L.EAS_network slicing “Energy-Aware States network slicing".​ 

  • ​The report of Q6/5 meeting is contained in TD1496-R3. ​

    Question 7/5 - Circular economy including e-waste
    The Rapporteur of Q7/5 (Ms Nevine Tewfik) opened the meeting and presented the draft agenda contained in TD1487-R2, which was approved with modifications.

    Q7/5 on e-waste and circular economy received a total of 18 Contributions which were discussed during this ITU-T SG5 meeting. The following work items were addressed and new baseline documents were produced to continue the work during the interim period:

  • Draft Recommendation ITU-T L.GSP “General principles for the green supply chain management of ICT manufacturing industry";
  • Draft Recommendation ITU-T L.HL_e-waste “Guide for the institutions of higher learning to contribute in the effective management of
         e-waste";
  • Draft Recommendation ITU-T L.SM_B “Sustainable Management of Batteries";
  • Draft Recommendation ITU-T L.ARCH_EoL_CE and L.methodology_arch.​​
  • In addition, experts agreed to submit the updated baseline document of Draft Recommendation ITU-T L.SEEQ for consent at this meeting as found in TD1597. Experts also agreed to submit for consent the revised Recommendation ITU-T L.1031 as found in TD1603 to ITU-T SG5.

    Four new work items were agreed by experts, including the merging of L.ARCH_EoL_CE and L.methodology_arch into one work item; TD1609-R2 based on C696 Proposed new work item on L.TWS "Method for Evaluation of the Environmental and Safety Performance of True Wireless Stereo Products" and TD1608 based on C722 offered the A.13 justification for proposed new ITU-T Supplement in the work programme: L.Suppl.resource_sav “Examples of resource saving by using ICT technologies".

    Four outgoing liaisons were drafted: addressed to ISO TC 323 identifying a liaison officer, to ETSI TC EEPS and to ITU-T SG17. The work programme was reviewed and amended as needed and e- meetings were set for the interim period. A number of Contributions were received as food for thought.  They will be considered for possible new work items in the future.

    The report of Q7/5 meeting is contained in TD1497-R1.

    Question 9/5 - Climate change and assessment of information and communication technology (ICT) in the framework of the Sustainable Development Goals (SDGs)
    The Co-rapporteurs of Q9/5 (Mr Jean Manuel Canet/ Ms Pernilla Bergmark) opened the meeting and presented the draft agenda contained in TD1489-R3, which was approved with modifications.

    The Supplement Suppl.L.TrajectoriesManSupp giving guidance to ICT manufacturers on setting 1.5°C aligned targets compliant with Recommendation ITU-T L.1470 has been actively discussed. A final version submitted for agreement has been finalised and is available in TD1569-R3.

    Two new work items have been agreed, with the objectives:

     -  To develop a Supplement addressing the Connect 2030 objective 3.4 and to identify Q9/5 deliverables to be updated or initiated in the
         future. The work item description is contained in TD1583-R1 for approval.
     -  To develop a new Recommendation addressing the definition of net-zero for the ICT sector and the actions of the ICT sector to
       ​ contribute to the net-zero target globally. The work item description is contained in TD1590-R2 for approval.

    Moreover, the Korean Green New Deal was presented, and experts agreed that this initiative addresses similar topics covered in the scope of Q9/5.

    As far as the WTSA preparation is concerned, the experts reviewed the WTSA Action Plan and the Q9/5 description. The discussions highlighted the importance of biodiversity and the work performed by Q9/5 with respect to trajectories aligned by the 1.5C target.

    The report of Q9/5 meeting is contained in TD1499-R4.

    Rapporteur group meetings (including e-meetings)

    The complete list of planned meetings can be found here.

    Updates in the SG5 Management Team and Rapporteurs:​

     - Click here for the complete list of SG5 Rapporteurs and Associate rapporteurs.
     - Click here for the complete list of SG5 Liaison rapporteurs and other representative roles.
     - Click here for the complete list of SG5 management team. 

    Focus Group on “Environmental Efficiency for Artificial Intelligence and other Emerging Technologies" (FG-AI4EE)

    The FG-AI4EE Co-chairman, Mr Paolo Gemma, provided a brief overview of the progress of the three FG-AI4EE Working Groups, namely:​​

    • Working Group 1: Requirements of AI and other Emerging Technologies to Ensure Environmental Efficiency
    • Working Group 2: Assessment and Measurement of the Environmental Efficiency of AI and Emerging Technologies
    • Working Group 3: Implementation Guidelines of AI and Emerging Technologies for Environmental Efficiency

    The Focus Group organized its first working group meetings between 28 to 30 September 2020, which was attended by over 30 experts. FG-AI4EE Co-chairman also encouraged interested experts to contribute to the work of the FG-AI4EE.

    The next meeting of the FG-AI4EE is planned to take place on 10 December 2020. The meeting will be preceded by the First Workshop on Environmental Efficiency for Artificial Intelligence and other Emerging Technologies​ on 9 December 2020.

    The FG-AI4EE website is available here.

    Special session on ITU-T Study Group 5 future and WTSA preparations

    A special session to discuss ITU-T SG5 future in preparation of WTSA-20 was held on Tuesday, 20 October 2020.

    During the session, the following documents were discussed:​​​

  • TD1543 WTSA Report Part I on revision to Resolution 2 and WTSA Report Part II on Questions proposed for study during the next Study Period (2020-2024).

    ITU-T SG5 experts agreed to remove reference to quality of service (QoS) in SG5 part of Resolution 2. Additionally, experts slightly revised the proposed ToR for Questions A “Electrical protection, reliability, safety and security of ICT systems" and Question I “Climate change and assessment of digital technologies in the framework of the Sustainable Development Goals (SDGs) and the Paris Agreement". Experts also agreed to add reference to the WSIS action lines and the Sustainable Development Goals (SDGs).

    The outcome of the discussion is contained in the outgoing liaison statement addressed to TSAG, as contained in TD1632. The latest version of WTSA Report Part I and Part II are contained in TD1618-R1 and TD1617.

  • Dates of the next ITU-T SG5 meeting

    The next meeting of ITU-T SG5 is planned to take place virtually in 2021.​​​