Committed to connecting the world

ITU 150

ITU-T liaison statement database

ITU-T LIAISON STATEMENT SG11-LS120

Outgoing from: SG11
Sent for action to: -
Sent for comment to: -
Sent for information to:
SG16 registered as T17-SG16-170116-TD-GEN-0013 for meeting [Geneva, 16-27 January 2017]
In response to: SG16-LS233
Source: ITU-T Study Group 11
Title: LS/r on draft new ITU-T Q.4016 "SIP signalling between the IP Multimedia Subsystem (IMS) and SIP enabled devices for real-time fax over IP" (reply to SG16 - LS 233 –E)
Reference: Ref.: TD 1352 Rev.1 GEN/11)
Approval date: 2016-07-06
Deadline date: 2017-01-30
Full path: http://handle.itu.int/11.1002/ls/sp15-sg11-oLS-00120.zip
See full conversation:  
LSTitleFromToApproval date
SG11-LS120LS/r on draft new ITU-T Q.4016 "SIP signalling between the IP Multimedia Subsystem (IMS) and SIP enabled devices for real-time fax over IP" (reply to SG16 - LS 233 –E)SG11SG16; 2016-07-06
SG16-LS233LS/r on draft new ITU-T Q.4016v.1_FAX_req_and_tests "SIP signalling between the IP Multimedia Subsystem (IMS) and SIP enabled devices for real-time fax over IP" (COM11-LS107) to [ITU-T SG11]SG16SG11; 2016-06-03
SG11-LS107LS on draft new Recommendation on “SIP signalling between the IP Multimedia Subsystem (IMS) and SIP enabled devices for real-time fax over IP” (Q.4016v.1_FAX_req and tests)SG11SG16; 2016-03-24