| Work item | Question | Equiv. Num. | Status | Timing | Approval process | Version | Liaison relationship | Subject / Title | Priority |
| G.Sup.ION-aiBB | WP1/15 | | Under study | 2027-03 | Agreement | - | - | Use cases and requirements of AI enhanced ION-2030 for broadband | Medium |
| G Sup81 (ex G Suppl.PONsec Rev2) | Q2/15 | | Under study | 2027-03 | Agreement | Rev. | ETSI ISG F5G, ETSI TC CYBER | Practical aspects of PON security - Revision 2 | - |
| G Sup88 (ex G Suppl. VHSP Rev.1) | Q2/15 | | Under study | 2027-10 | Agreement | Rev. | - | PON transmission technologies above 50 Gb/s per wavelength - Revision 1 | Medium |
| G.988 (2022) Amd.3 | Q2/15 | | Consented 2026-07-10 | 2026-07 | AAP | - | - | ONU management and control interface (OMCI) specification - Amendment 3 | Medium |
| G.988 | Q2/15 | | Under study | 2027-10 | AAP | Rev. | - | ONU management and control interface (OMCI) specification | Medium |
| G.9804.2 | Q2/15 | | Under study | 2027-10 | AAP | Rev. | - | Higher speed passive optical networks - Common transmission convergence layer specification | Medium |
| G.9805 Amd.1 | Q2/15 | | Under study | 2027-10 | AAP | - | - | Coexistence of passive optical network systems | Medium |
| G.hsp.TWDMpmd | Q2/15 | | Under study | 2027 | AAP | New | Potential connection with project under development in IEEE P802.3 | Higher Speed Passive Optical Networks: TWDM PMD | - |
| G.OMCC4FIP | Q2/15 | | Under study | 2027 | AAP | - | - | Management and control interface of fibrer in premises (FIP) networks via OMCC | Medium |
| G.Sup45 | Q2/15 | | Under study | 2026-10 | Agreement | - | - | Power conservation in optical access systems | Medium |
| G.Sup.51 | Q2/15 | | Under study | 2027-10 | Agreement | - | - | Passive optical network protection considerations | Medium |
| G.Sup.ION-aiBB | Q2/15 | | Under study | 2027-03 | Agreement | - | - | Use cases and requirements of AI enhanced ION-2030 for broadband | Medium |
| G.sup.PONcoop | Q2/15 | | Under study | 2028-07 | Agreement | New | Broadband Forum | Multi-PON cooperation based on combo ONU | Medium |
| G Sup. ISAC4FIP | Q3/15 | | Under study | 2027-03 | Agreement | New | ETSI ISG F5G,CCSA TC6 | Use cases, requirements and technical vision of ISAC for in-premises networks | Medium |
| G.9940 Amd.1 | Q3/15 | | Under study | 2027-03 | AAP | - | - | High speed fibre-based in-premises transceivers - system architecture | Medium |
| G.9943 Amd.1 | Q3/15 | | Under study | 2026 | AAP | - | - | High speed fibre-based in-premises transceivers - network management | Medium |
| G.9944 (e.x.G.Xfin-SA) | Q3/15 | | Under study | 2027-03 | AAP | New | Broadband Forum, ETSI ISG F5G, CCSA TC6 | High speed fibre-based in-premises networking - 10G system architecture | Medium |
| G.9945 (ex G.Xfin-PHY) | Q3/15 | | Under study | 2027 | AAP | - | - | High speed fibre-based in-premises transceivers - 10G Physical layer | Medium |
| G.9946 (ex G.Xfin-DLL) | Q3/15 | | Consented 2026-07-10 | 2026 | AAP | New | - | High speed fibre-based in-premises transceivers - 10G data link layer | Medium |
| G.dop | Q3/15 | | Under study | 2026-07 | AAP | New | - | Data Over Power - Vehicle Network. System, Management, PHY and DLL Specification | Medium |