Committed to connecting the world

WTISD

Study Group 15 Rapporteur Meetings

WP1/15 interim activities

 
Q.
Topic
Date
Location/Host
All/15
WP1/15 interim plenary
17:00, 1 February, 2013
Geneva/ITU-T
2/15
G.989.2, G.984.5 Rev, G.984.3 Rev2
9 October, 2012
telecon
2/15
G.989.3 / G.987.3 Am1
30 October, 2012
telecon
2/15
G.multi / G.poc
20 November, 2012
telecon
2/15
G.989.2 and G.987.3 Am1
11 December, 2012
telecon
2/15
All documents in Q2/15
28 February, 2013
Fuzhou, China
2/15
All documents in Q2/15 – final prep for SG-15 meeting
16 May, 2013
Chengdu, China
4a/15
G.fast
4 October, 2012
telecon
4a/15
DSL and G.fast (1,2)
5 November 2012 –
9 November
Chengdu, China
Host : Huawei
4a/15
Data gathering for DSL
15 October, 2012
telecon
4a/15
DSL
11 December, 2012
telecon
4a/15
DSL
17 January, 2013
telecon
4a/15
G.fast (1)
28 January 2013 –
1 February
Geneva, CH
ITU-T
4a/15
DSL and G.fast (1)
18 March 2013 –
22 March
TBD (default Geneva)
Host : TBD
4a/15
G.fast (1)
13 May 2013 –
17 May
Hoffman Estates (Chicago area) USA
Host : AT&T
4b/15
G.hn
13 – 16 November 2012
Portland, OR
Host : TBD
4b/15
G.hn
21 – 25 January 2013
Geneva, CH
ITU-T
4b/15
G.hn
22 – 26 April 2013
Minneapolis, MN
Host : ATIS
4c/15
All topics Q4c
20 November, 2012
telecon
4c/15
Comment resolution
11 December, 2012
telecon
4c/15
Comment resolution
8 January, 2013
telecon
4c/15
G.hnem & G.wnb
21 – 25 January 2013
TBD (default Geneva)
Host : TBD
4c/15
Comment Resolution
19 February, 2013
telecon
4c/15
Comment Resolution
12 March, 2013
telecon
4c/15
G.hnem & G.wnb
8 – 12 April 2013
TBD (default Geneva)
Host : TBD
4c/15
Comment Resolution
30, April, 2013
Telecon
(1) The starting time will be 9:30 am (local time) the first day.
(2) Monday morning address DSL, G.fast will start Monday afternoon
 

WP2/15 interim activities

Q.
Topic
Date
Location/Host
6/15
Establish sets of parameters and associated values to enable multi-vendor interoperability for the various modulation formats for 40G and 100G application codes in a revision of G.698.2;
 
Study the potential need of new optical interface specifications for low-cost metro applications on the basis of wavelength-agnostic endpoints;
 
To consider documents relating to revised G.680, G.693, G.697, G.698.2, G.698.3, G.959.1 and G.Sup39;
 
March 2013
5 days
co-located with IETF CCAMP WG meeting in Orlando, 11 – 15 March 2013
TBC
 

WP3/15 interim activities

Q.
Topic
Date
Location/Host
3, 9, 10, 12, 14/15
MPLS-TP topics
28 Jan-1 Feb
Hiroshima/ Fujitsu
9/15
OTN SMP, MECP, Protection Interworking, Signal Degrade
25 February-1 March 2013
Dallas/Xtera
9/15
Protection Recommendations, Protection Interworking, OTN SMP, MECP
6-10 May 2013
TBD/TBD
10/15
Finish G.8011.x series, G.8013, G.8012.1
25 February-1 March 2013
Dallas/Xtera
11/15
G.709, Beyond 100G, 1GE + FEC for access/metro, PM of timing adaptation
25 February-1 March 2013
Dallas/Xtera
12, 14/15
All Q12 topics (except MPLS-TP) and ASON management. Cloud computing and its management aspects.
4-8 February 2013
Shenzhen/ZTE (to be confirmed)
13/15
- Continue the work on the transport of phase and time in the G.827x series giving priority to the following documents which consent has already been delayed: G.8273.x, G.8271.1, G.8275 and G.8275.1.
- Continue the work on the transport of frequency in the G.826x series
- Address, if needed, the AAP comments
21-25 January 2013
Paris/France Telecom Orange
13/15
- Continue the work on the transport of phase and time in the G.827x series
- All other Q13 items
8-12 April 2013
San Jose/ Symmetricom
14/15
Equipment Management except MPLS-TP
10-14 December 2012
Darmstadt/ Deutsche Telekom
14/15
Equipment management (including G.8152 MPLS-TP NE info model)
15-19 April 2013
Darmstadt/ Deutsche Telekom