Committed to connecting the world

  •  

ITU-T work programme

Study period:
Study Group:
Working party:
Question:
 
GSI:
Status:







Registered:
Consented between:
and
Approved between:
and
Work item:
Subject/title:
Summary:
Base text:
Editor's name or company:
Total found: 99 Page Size:
Show details
12345
Work item Question Subject/title Timing Study group Study period
 G.Sup.ION-aiBB WP1/15 Use cases and requirements of AI enhanced ION-2030 for broadband
2027-03
SG15 2025-2028
 GSTR.NCUS10G WP1/15 Network characteristics and use cases for the 10Gbps broadband era
2026-07
SG15 2025-2028
 G Sup81 (ex G Suppl.PONsec Rev2) Q2/15 Practical aspects of PON security - Revision 2
2027
SG15 2025-2028
 G Sup88 (ex G Suppl. VHSP Rev.1) Q2/15 PON transmission technologies above 50 Gb/s per wavelength - Revision 1
2027
SG15 2025-2028
 G Sup. LLSoT(W)DM Q2/15 Low Layer Split Mobile Fronthaul over T(W)DM PON
2026-07
SG15 2025-2028
 G.988 (2022) Amd.3 Q2/15 ONU management and control interface (OMCI) specification - Amendment 3
2026-07
SG15 2025-2028
 G.hsp.TWDMpmd Q2/15 Higher Speed Passive Optical Networks: TWDM PMD
2027
SG15 2025-2028
 G.OMCC4FIP Q2/15 Management and control interface of fibrer in premises (FIP) networks via OMCC
2027
SG15 2025-2028
 G.Sup45 Q2/15 Power conservation in optical access systems
2026-07
SG15 2025-2028
 G.Sup.ION-aiBB Q2/15 Use cases and requirements of AI enhanced ION-2030 for broadband
2027-03
SG15 2025-2028
 GSTR.NCUS10G Q2/15 Network characteristics and use cases for the 10Gbps broadband era
2026-07
SG15 2025-2028
 G Sup. ISAC4FIP Q3/15 Use cases, requirements and technical vision of ISAC for in-premises networks
2026
SG15 2025-2028
 G.9903 Cor.2 Q3/15 Narrowband orthogonal frequency division multiplexing power line communication and radio frequency transceivers for G3-PLC and G3-Hybrid networks - Corrigendum 2
-
SG15 2025-2028
 G.9903 Amd.3 Q3/15 Narrowband orthogonal frequency division multiplexing power line communication and radio frequency transceivers for G3-PLC and G3-Hybrid networks - Amendment 3
-
SG15 2025-2028
 G.9930 Q3/15 Point-to-point fibre in the premises
-
SG15 2025-2028
 G.9943 Amd.1 Q3/15 High speed fibre-based in-premises transceivers - network management
2026
SG15 2025-2028
 G.9945 (ex G.Xfin-PHY) Q3/15 High speed fibre-based in-premises transceivers - 10G Physical layer
2026
SG15 2025-2028
 G.9946 (ex G.Xfin-DLL) Q3/15 High speed fibre-based in-premises transceivers - 10G data link layer
2026
SG15 2025-2028
 G.dop Q3/15 Data Over Power - Vehicle Network. System, Management, PHY and DLL Specification
2026-07
SG15 2025-2028
 G.Sup. FIP4B10G Q3/15 Beyond 10Gbps fibre in-premises network: use cases, system requirements & technology options"
2027-10
SG15 2025-2028
12345