Work item | Question | Equiv. Num. | Status | Timing | Approval process | Version | Liaison relationship | Subject / Title | Priority |
L109 (ex L.60) | Q16/15 | | Carried to next study period | 2017-06 | AAP | Rev. | - | Construction of optical/metallic hybrid cables | - |
L.10 | Q16/15 | | Approved 2015-08-13 | 2015-07 | AAP | Rev. | - | Optical fibre cables for duct and tunnel application | - |
L.26 | Q16/15 | | Approved 2015-08-13 | 2015-07 | AAP | Rev. | - | Optical fibre cables for aerial application | - |
L.43 | Q16/15 | | Approved 2015-08-13 | 2015-07 | AAP | Rev. | - | Optical fibre cables for buried application | - |
L.59 (2008) Amd.1 | Q16/15 | | Agreed 2015-07-03 | 2015-07 | Agreement | - | - | Optical fibre cables for indoor applications: Amendment 1 - New appendix on low friction indoor cable and wiring (Japanese experience) | - |
L.82 (2010) Amd.1 (ex L.coi) | Q16/15 | | Agreed 2014-12-05 | 2014-12 | Agreement | - | IEC SC86A WG3 | Optical cabling shared with multiple operators in buildings: Amendment 1 - New Appendix II | Medium |
L.83 (2010) Amd.1 | Q16/15 | | Carried to next study period | 2016-09 | - | - | IEC SC86A WG3 | Low impact trenching technique for FTTx networks: Amendment 1 | Medium |
L.91 (ex L.coi) | Q16/15 | | Carried to next study period | 2016-09 | - | New | IEC SC86A WG3 | Microduct technology and its application in the access network | Medium |
L.103 (ex L.59) | Q16/15 | | Approved 2016-04-13 | 2016-02 | AAP | Rev. | - | Optical fibre cables for indoor applications | - |
L.108 (ex L.79) | Q16/15 | | Carried to next study period | 2017-06 | AAP | Rev. | - | Optical fibre cable elements for microduct blowing-installation application | - |
L.110 (ex L.dsa) | Q16/15 | | Carried to next study period | 2018 | - | New | ITU-T SG5 and IEC SC86A | Optical fibre cables for direct surface application | - |
L.155 (ex.L83) | Q16/15 | | Carried to next study period 2016-09-30 | TBD | AAP | Rev. | IEC SC86A WG3 | Low-impact trenching technique for FTTx networks | Medium |
L.156 (ex L.57) | Q16/15 | | Carried to next study period | 2017-06 | AAP | Rev. | - | Air-assisted installation of optical fibre cable | - |
L.162 (ex L.coi) | Q16/15 | | Carried to next study period 2016-09-30 | 2016-09 | AAP | New | IEC SC86A WG3 | Microduct technology and its applications | Medium |
L.206 (ex L.oxcon) | Q16/15 | | Carried to next study period | 2017-06 | Agreement | New | - | Requirements for passive optical nodes: outdoor optical cross connect cabinet | - |
L.cci | Q16/15 | | Carried to next study period | 2018 | Agreement | New | - | Criteria for optical cable installation with minimal existing infrastructure | - |
L.fdb | Q16/15 | | Carried to next study period | 2018 | AAP | - | IEC SC86B WG6 | Requirements for passive optical nodes:Fibre Distribution Box | - |
L.pneid | Q16/15 | | Carried to next study period | 2018 | AAP | New | - | Passive node elements with automated ID tag detection | - |