Committed to connecting the world

  •  

ITU-T work programme

[2025-2028] : [SG5] : [Q6/5]

[Declared patent(s)]  - [Associated work]

Work item: L.HESS-AIDC
Subject/title: General Requirements for Hybrid energy storage for AI data centers
Status: Under study 
Approval process: AAP
Type of work item: Recommendation
Version: New
Equivalent number: -
Timing: 2028-06 (Medium priority)
Liaison: IEC TC8, ISO/IEC JTC 1 SC39
Supporting members: China Unicom, China Telecom, China Mobile, ZTE, CAICT,State Grid Corporation of China, Huawei Technologies
Summary: This Recommendation specifies general requirements for Hybrid Energy Storage Systems (HESS) deployed in AI computing centres (AIDCs). It addresses the unique challenges posed by GPU-driven workloads, including millisecond-level power transients, high-frequency micro-cycling, and the competing demands of transient response, power fluctuation smoothing, and long-duration backup. The Recommendation establishes requirements for HESS scheduling in AIDC, covering: power allocation and capacity dispatch based on load power spectral density; coordination with AI workload schedulers for pre-charging and carbon-aware operation; grid interaction management including harmonic compensation, islanding detection, seamless transition, and fault ride-through; state-of-charge and lifecycle management with active micro-cycle suppression; frequency decomposition for multi-timescale power allocation; virtual inertia and damping control using the high-power layer; dynamic backup capacity reservation; and PCS coordination for stable multi-layer operation.
Comment: -
Reference(s):
  Historic references:
-
Contact(s):
Ying SHI, Editor
Xin WANG, Editor
Yang YING JIE, Editor
Ming Zhang, Editor
Sun ZHEN ZHOU, Editor
ITU-T A.5 justification(s):
Generate A.5 drat TD
-
[Submit new A.5 justification ]
See guidelines for creating & submitting ITU-T A.5 justifications
First registration in the WP: 2026-07-01 11:02:35
Last update: 2026-07-01 11:09:45