Page 19 - Methodology to assess Net Zero progress in cities
P. 19

–  Intelligent building management systems
            –  Low-carbon emission transportation - carbon emission transportation systems



            Energy Demand control dimension

            This dimension is used to evaluate how energy demand and general carbon behaviour in the city
            has changed, especially based on the ICT infrastructure. Some corresponding topics could be:


            –  Building efficiency
            –  Behavioural change

            –  Logistics mobility

            –  Food systems
            –  Waste and recycling

            –  Active mobility

            The cities can be classified in maturity levels, addressing corresponding achievements (Table 1):



            Table 1: Recommended achievements for each maturity level

                                                     Infrastructure
                          Strategy  ICT Infrastructure            Services and utilities  Assessment  KPIs performance
                                                      upgrades
             Maturity Level 1  The overall   Key infrastructures and  Key aspects on   Strategy and priorities  Assessment plan is   Long-term targets for
                        strategy is   data are identified in   infrastructure upgrades  for services and   ready  KPIs are set for the
                        developed  the strategy   are identified in the   utilities on city level   city's neutral strategy
                                                  strategy        are identified               and baseline values
                                                                                               for KPIs are collected
             Maturity   Carbon    ICT infrastructures   Methodology to   Domain services and   Self-assessment   Interim KPI targets for
                        neutrality   are operated, and   identify and implement  utilities contribute   of infrastructure   maturity level 2 are
             Level 2
                        initiatives are   corresponding   upgrades are agreed  to carbon neutrality   development and   achieved
                        aligned with   data are produced          individually   services are carried
                        the strategy  independently                              out
             Maturity   Evaluation   Accessibility of ICT   Infrastructure   Services and utilities   User satisfaction   Interim KPI targets for
                        of carbon   infrastructures and   upgrades are carried   focus on carbon   assessments are   maturity level 3 are
             Level 3
                        neutrality   data is improved  out independently by   neutrality and public   carried out  achieved
                        initiatives is            different sectors.  value generation.
                        carried out
                                                                  Utility and service
                                                                  operation is
                                                                  monitored and
                                                                  analysed to improve
                                                                  carbon neutrality
                                                                  performance
             Maturity   Strategy is   Cross-domain ICT   Cross-domain   Cross-domain carbon   Stakeholders'   Interim KPI targets for
                        developed   infrastructures and   infrastructure upgrades  neutrality initiatives  satisfaction   maturity level 4 are
             Level 4
                        for improving  data exchanges   are performed            assessments are   achieved
                        integration   are provided with                          carried out
                        and       interoperability
                        cooperation  capabilities
             Maturity   Improvement  Continuous   Continuous      Continuous     Systematic    Long-term targets for
                        and       development of   improvements with   improvements of   assessment process  KPIs are achieved
             Level 5
                        optimization   infrastructure and data  state-of-the-art   services and utilities   is established with
                        potential is   provision are carried   technologies for   are made by applying  corresponding
                        explored  out             carbon reduction  advanced state-of-the- actions
                                                                  art technologies for
                                                                  carbon reduction


                                                                                                          9
   14   15   16   17   18   19   20   21   22   23   24