Page 106 - Kaleidoscope Academic Conference Proceedings 2020
P. 106

2020 ITU Kaleidoscope Academic Conference




            occasions is indicated by a dynamic 2-D bitmap in DPCI.   whether it overlaps with eMBB transmission. For BPC, once
            More specifically, the bit construction of DPCI is illustrated   the  resource  of  URLLC  overlaps  with  that  of  eMBB,  the
            as follows.                                       URLLC UE will perform P-dB power boosting, i.e., 6 dB.
                                                              However, the eMBB transmission will cause quite different
              Q  bits  are  used  for  indicating  which  time  domain  interference  on  URLLC  time-frequency  resources  under
               occasion is occupied, where ‘Q’ equals the number of  some  situations.  For  example,  as  shown  in  Figure  5,  the
               occasions in the time domain per RUR.          transmission power of different eMBB UEs is different in the
                                                              same RUR, and the proportion of overlapping resources to
              Cm×n is 2-D bitmap for frequency domain indication,  the  total  resources  of  URLLC  services  is  different  in
               i.e.,  the occupied time  domain  occasions are  divided  different RURs. A fixed value of power boosting will not
               into ‘a×b’ portions, each portion is indicated by a bit in  only lead to insufficient or serious power waste for URLLC
               the  2-D  bitmap,  wherein  a  represents  number  of  transmission, but also affect the transmission performance of
               occupied  time  domain  occasions  and  b  represents  normal eMBB services.
               frequency  domain  granularity.  Both  of  them  are
               determined  according  to  the  indication  of  Q  bits  Compared  with  fixed  power  adjustment  according  to
               dynamically.                                   resource  multiplexing,  the  following  two  points  are
                                                              enhanced  in  ROPC:  1)  defining  different  power  control
           Under the example shown in Figure 4, Q=7, a = 2 and b=10,   parameters for different resource groups; 2) boosting power
           then the total bit-number is 27. Compared with BCI, which   according to the proportion of overlapping resources to the
           requires 28bits, this method can make the frequency domain   total  resources  of  URLLC  services.  More  details  are
           indication granularity (FDIG) finer with the same number of   provided on the above two enhancements in the following
           bits. This could reduce the false cancellation probability for   subsections.
           a better protection of eMBB PUSCH. As shown in Table 1,
           as long as the number of occupied time domain occasions   3.2.1   Different power control  parameters for different
           (OTDOs)  is  less  than  5,  the  minimum  frequency  domain   resource groups
           indication  granularity  for  each  time  domain  occasion  of
           DPCI is finer than that of BCI.                    In an RUR, multiple groups of a time-frequency resource can
                                                              be indicated by gNB to the URLLC UE. Different groups of
                                                              time-frequency  resource  correspond  to  different  power
                                                              control parameter sets. The URLLC transmission power is
                                                              determined  according  to  the  power  control  parameter  set
                                                              corresponding  to  the  group  of  time-frequency  resource  it
                                                              overlaps with eMBB.
             F
                 O1  O2   O3  O4   O5  O6   O7     O2  O5     As  shown  in  Figure  6,  the  control  information  of  ROPC
                  T      Resource scheduled    Cancelation resource   includes at least one time-frequency resource indication field.
                          for UL URLLC      indicated by DPCI  Each time-frequency resource indication field can indicate a
                         Resource cancelled
                         by UL CI falsely                     group  of  time-frequency  resources.  The  power  control
             Figure 4 – Resource indicated by dynamic 2-D bitmap   parameters for each group of time-frequency resources will
                                                              be  configured  via  radio  resource  control  signaling.  If  the
            Table 1 – Minimum indication granularity with different   resource scheduled for URLLC transmission overlaps with
                number of the occupied time domain occasions   more  than  one  group  of  time-frequency  resources,
                                                              transmission power will be calculated based on each power
                  OTDOs                 1~7                   control  parameter  respectively,  and  a  higher  one  or  an
                  number
            BCI                                               average value will be selected.
                   FDIG                  1
                                         4
                  OTDOs    1    2    3    4    5    6   7
             DP   number
             CI    FDIG    1   ≤  1  1   ≤  1  ≤  1  ≤  1  1
                          21     10  7     5    4    3  3             RUR #1      RUR #2        RUR #3
                                                                      Resource scheduled for UL   Resource scheduled
           3.2    Design for ROPC                                   eMBB with PC parameter set A  for UL URLLC
                                                                      Resource scheduled for UL
                                                                    eMBB with PC parameter set B
           In order to ensure the flexibility of URLLC transmission, it’s   Figure 5 – Various situations of overlapping between the
           better  for  gNB  to  schedule  the  most  appropriate  time-  URLLC PUSCH and the eMBB PUSCH
           frequency  resources  for  the  URLLC  UE  without  caring





                                                           – 48 –
   101   102   103   104   105   106   107   108   109   110   111