Page 31 - Methodology for measurement of Quality of Service (QoS) Key Performance Performance Indicators (KPIs) for Digital Financial Services
P. 31

ANNEX B

           Check lists to be used in testing campaigns








           This clause contains elements of check lists for usage in   B.2 AT EACH NEW TESTING LOCATION
           measurement campaigns. The lists describe the points
           to be checked; the way to do so will have to be defined   B.3 DAILY, AFTER COMPLETION OF TESTS
           case by case.
             Figure B-1 illustrates the use of the check list during   •  Make sure the device is set up to use network date/
           a particular day of a test campaign.                  time (in case the network is  providing this feature
                                                                 and information is assessed to be reliable).
           B.1 DAILY, PRIOR TO BEGINNING OF TESTS             •  Check that airtime/data volume credit is sufficient to
                                                                 perform their respective actions (e.g. sufficient pre-
           •  Make sure the time-taking device has correct time   paid credit, or remaining data volume). Query and re-
             and date settings.                                  cord respective information. Re-charge if necessary.
           •  Make sure the device is set up to use network date/  Remark: When respective action should be taken will
             time (in case the network is  providing this feature   depend on the actual testing situation (i.e. if it is better
             and information is assessed to be reliable).     to do it in the evening for the following day, or in the

           •  Make sure the devices have sufficient airtime/data   morning of the next day). Choice should be made to
             volume credit to  perform their respective actions   give the best overall test team productivity under given
             (e.g. sufficient prepaid credit, or remaining data vol-  circumstances.
             ume). Query and record respective information.


           FIGURE B-1: Measurement related checking procedures



                                                  Repeat for multiple locations

                Daily pre-              On-           On-                  On-                Daily post-
               measurement             location      location             location           measurement
                procedures              entry        periodic              exit               procedures
                                       checks        checks               checks







           TABLE B-1: Checking actions to be taken at each new testing location
           ACTION                                                             FREQUENCY
           Make sure the ObsTool UE is in the same cell as the DFS UE         Initially and periodically every ~ 2 hours
           Make sure the UE used have sufficient battery charging level       Initially and periodically every ~ 2 hours
           Make sure UE used for DFS testing do not run extensive background activities    Initially and periodically every ~2 hours
           (e.g. download of new OS versions or apps requiring substantial system resources










                                 Methodology for measurement of Quality of Service (QoS) Key Performance Indicators (KPIs) for Digital Financial Services • 29Methodology for measurement of Quality of Service (QoS) Key Performance Indicators (KPIs) for Digital Financial Services • 29
   26   27   28   29   30   31   32   33   34   35   36