This page will soon be deactivated—explore our new, faster, mobile-friendly site, now centralized in MyWorkspace!

Committed to connecting the world

  •  
ITU GSR 2024

ITU-T work programme

[2025-2028] : [SG15] : [Q13/15]

[Declared patent(s)]  - [Associated work]  - [Publication]

Work item: G.8271.1/Y.1366.1 (2022) Amd.3
Subject/title: Network limits for time synchronization in packet networks with full timing support from the network-Amendment 3
Status: Approved on 2025-05-14 [Issued from previous study period]
Approval process: AAP
Type of work item: Recommendation
Version: -
Equivalent number: -
Timing: -
Liaison: IEEE 802, 3GPP, O-RAN, IEEE1588
Supporting members: -
Summary: Recommendation ITU-T G.8271.1/Y.1366.1 specifies the maximum network limits of phase and time error that shall not be exceeded. It specifies the minimum equipment tolerance to phase and time error that shall be provided at the boundary of packet networks at phase and time synchronization interfaces. It also outlines the minimum requirements for the synchronization function of network elements. This Recommendation addresses the case of time and phase distribution across a network by a packet-based method with full timing support to the protocol level from the network. Amendment to Recommendation G.8271.1 provides the following updates: Added a HRM to address the use case of Synchronization requirements for applications connected via the 5G system
Comment: -
Reference(s):
  Historic references:
-
Contact(s):
ITU-T A.5 justification(s):
Generate A.5 drat TD
-
[Submit new A.5 justification ]
See guidelines for creating & submitting ITU-T A.5 justifications
First registration in the WP: 2024-01-11 12:40:41
Last update: 2025-04-13 16:50:32