​At its fully virtual meeting, 30 November - 10 December 2021, ITU-T Study Group 5 achieved the following outcomes: Remote participation was provided using MyMeetings. The following TDs were prepared in this regard:​​​ ​ ​​

Major accomplishments​

Approval of the report of the last SG5 meeting​​​

The report of the last ITU-T SG5 meeting held virtually, from 11-20 May 2021 was approved as contained in 
Report 10​.

Approved Recommendations by ITU-T SG5 (according to A.8 §5)​​


ITU-T R​ec.
Number

Title

Question

TD

None




Recommendations Consented by SG5 for Last Call (AAP - Recommendation A.8)​

Revised Recommendations

ITU-T Rec. N​umber

Title

Question

TD

K.124

Overview of particle radiation effects on telecommunication systems

Q1/5

TD2154

K.130

Neutron irradiation test methods for telecommunication equipment

Q1/5

TD2158

K.131
Design methodologies for telecommunication systems applying soft error measure

Q1/5

TD2157​

K.138

Quality estimation methods and application guidelines for mitigation measures based on particle radiation tests

Q1/5

TD2156
K.139
Reliability requirements for telecommunication systems affected by particle radiation​

Q1/5

TD2155

​K.83
​Monitoring of the electromagnetic field levels
​Q3/5
TD2108-R1
​K.91
​Guidance for assessment, evaluation and monitoring of the human exposure to radio frequency electromagnetic fields
​Q3/5
TD2062-R1
​K.137

​Electromagnetic compatibility requirements and measurement methods for wireline telecommunication network equipment
​Q4/5
TD2106 (A.5)
​L.1331
​Assessment of mobile network energy efficiency
​Q6/5
TD2109​

New Recommendations


ITU-T R​e​c. Number

Work item or provisional name

Title

Question

T​D

K.151

K.HVAC_400VDC

Electrical safety and lightning protection of medium voltage input and up to ±400VDC output power system in ICT data centre and telecommunication centre

Q1/5


L.1035

L.SM_Batteries

Sustainable Management of Batteries

Q7/5

TD2094-R1
L.1016

L.TWS

Method for Evaluation of the Environmental, Health and Safety Performance of True Wireless Stereo Headphones

Q7/5


L.1036
L.ewaste_base-station

Scheduled waste management for base station (inclusive of e-waste)

Q7/5


Agreed informative texts

Document

Work item or provisional name

Title

Question

TD

K.Suppl.13
K.Suppl.13 (rev)

Radiofrequency electromagnetic field (RF-EMF) exposure levels from mobile and portable devices during different conditions of use

Q3/5


K.Suppl.20

K.Suppl.20 (rev)
Supplement on radiofrequency exposure evaluation around underground base stations

Q3/5


Appendix 1 of ITU-T K.70
Appendix I to Recommendation ITU-T K.70
Software "EMF-estimator" v8.0.32 and v8.64

Q3/5

TD2110
L.Suppl.45
L.RBS.Sup_best_practices to ITU‑T L.1350
Radio base station site best practices

Q6/5

TD2118

L.Suppl.46
Suppl. Definitions_CC
Definitions and Recent Trends in Circular Cities

Q13/5

TD2101-R2

Agreed questionnaire

Title

Question

TD

None​






New work items


​TD​ Work item Title Question
(A.1) TD2125 
TD2126

K.ecl
Surge protective component application guide - Electronic Current Limiters
Q2/5
(A.13) TD2131-R1
K.Suppl.WPT
EMF strength in and outside of WPT-EV/OLEV
Q3/5
TD2112

K.76 (rev.)
EMC requirements for telecommunication network equipment (9 kHz-150 kHz)
Q4/5
(A.1) TD2141-R1
L_NCIe
Carbon data intensity for network energy performance monitoring
Q6/5
(A.13) TD2165-R1
L.Sup.EMUE
Energy related mobile end-user experience
Q6/5
(A.13) TD2171
L.Suppl.cdep
Computer processing, data management and energy perspective
Q6/5
(A.13) TD2172
L.Suppl.gcai
Guidelines on the Implementation of Eco-friendly Criteria for AI and other Emerging Technologies
Q6/5
(A.1) TD2107
L.SCCA
Supply-chain based carbon accounting information guidelines for ICT manufacturing industries
Q7/5
(A.1) TD2121-R1
L.GPSIM
Good practices for the sanitization of the information media in end-of-life ICT devices
Q7/5
(A.1) TD2152
TD2183
L.ICT_PROCURE
Public procurement of ICTs to mitigate the adverse effects of e-waste
Q7/5
(A.13) TD2122-R1
L.Suppl.ICIP
Best practices for implementing the circular economy in ICT management
Q7/5
(A.1) TD2163-R1
L.1031(rev.)
Guideline for achieving the e-waste targets of the Connect 2030 Agenda
Q7/5
(A.13) TD2161-R1
L.Suppl.GSP to ITU-T L.1060
Specific principles for the green supply chain management of information and communication technology manufacturing industry
Q7/5

(A.1) TD2114-R1
L.Database
Guidance for the creation of an ITU database on GHG emissions of the global ICT sector
Q9/5
(A.1) TD2113-R1
L.1471 (rev.)
Guidance and criteria for information and communication technology organizations on setting Net Zero targets and strategies
Q9/5
(A.1) TD2179
L.1420 (rev.)
Methodology for energy consumption and greenhouse gas emissions impact assessment of information and communication technologies in organizations
Q9/5
(A.1) TD2174-R1
L.Biodiversity_footprint
Methodology for the assessment of the footprint of an ICT organization on biodiversity
Q9/5
(A.1) TD2175-R1​
L.Biodiversity_opportunities
Development of guidance on how to assess the second order effects of ICT solutions on biodiversity, including positive effects
Q9/5

​(A.1) TD2169
L.GHGintensities​
GHG emissions intensity indicators for telecom network operators​Q9/5​
​(A.1) TD2136-R2
​L.GHGemissions_BS
Methodologies for accounting Greenhouse Gas Emissions of Base Station sites​​Q9/5
(​A.1) TD2137-R2

​L.GHGemissions_DC
​Methodologies for accounting Greenhouse Gas Emissions of Data Centres and Telecommunication rooms
​Q9/5
(​A.1) TD2170-R1
L.GHGemissions_IP
Methodologies for accounting Greenhouse Gas Emissions of Industrial Parks​​Q9/5
(A.13) TD2115

​L.Suppl.DC&SDG
Assessing environmentally efficient data centre and cloud computing in the framework of the UN sustainable development goals​​Q9/5
(A.1) TD2147-R1​


​L.MM&BP_IP
​Measurement methodology and Best Practices for decarbonization of Industrial Park in support of Net Zero
Q11/5​
​(A.1) TD2148-R1

L.MM&BP_BS​​Measurement methodology and Best Practices for decarbonization of Base Station sites in support of Net Zero
​Q11/5
(A.1) TD2149-R1
L.MM&BP_DC
Measurement methodology and Best Practices for decarbonization of Data Centre and Telecommunication Room in support of Net Zero
Q11/5​
(A.1) TD2181-R2


​L.BP_SC
​Best Practices for decarbonization of Smart City in support of Net Zero
​Q11/5
(A.13) TD2176​

​L.Suppl.dces
​Data centre energy saving: Application of AI technology in improving energy efficiency of telecom equipment rooms and Internet data centre infrastructure
​Q11/5
​(A.1) TD2103-R2
TD2199
L.FrameworkBIMSssc
​Framework of Building Infrastructure Management System for Sustainable City
Q13/5​


Contributions​

The full list of Contributions can be found in TD2015.​

Action plans for the implementation of WTSA-16 Resolutions 72 and 73 (Rev. Hammamet, 2016) and Resolution 79 (Dubai, 2012) (human exposure to EMF, environment and climate change, and e-waste)​

TD2057-R2 contains a proposed “Action Plan” for the implementation of WTSA-16 Resolutions 72 and 73 (Rev. Hammamet, 2016) and Resolution 79 (Dubai, 2012) (human exposure to EMF, environment and climate change, and e-waste). This document was updated during the meeting.

Highlights from TSAG​

The eighth TSAG meeting was held from 25-29 October 2021. The meeting report is available as TSAG Report 23​. The 9th TSAG meeting is planned to ta​ke place virtually from 10-17 January 2022.

List of stale work items

TSB provided information on the list of stale and possible work items as contained in TD1925 (latest revision). The Rapporteurs of the concerned Questions were encouraged to discuss these work items during their respective sessions and take appropriate action. The concerned work items were updated during the sessions as follows:​

Q

Draft Rec.

Title

Stale status

Last update

​​Overall duration in months

Action taken


Q1/5

K.lp

Using data of lightning positioning system for network protection

Stale​


2017-11-14

​48

Updated
 TD2180

Q1/5


K.Sup.to-ITU-T-K.26
Supplement to ITU-T K.26 - Mitigation techniques for induction problems on fibre optical cables

Stale

2015-01-06

82

Discontinued

Q1/5


K.Sup.to-ITU-T-K.108

Supplement to ITU-T K.5 - Mitigation techniques for ITU-T K.108 and K.104

Stale


2015-01-06

82

Discontinued

Q2/5



Protective devices

Stale


2008-04-07

​163
Updated

Q2/5

Surge and over-current protection parameters of external disconnector for surge protective devices used in telecommunication equipment

Stale


2019-04-28

​31

Discontinued


Q6/5

L.EE_serv
Energy Efficiency measurement methodology and metrics for servers

Stale

2020-06-02


​17
Contributions will be submitted for next meeting

Q7/5

L.CE_Industry 4.0

Circular Economy and Industry 4.0

Stale

2020-05-17


18

Discontinued

Q7/5

L.Counterfeit

Adequate Assessment and Sensitisation on Counterfeit ICT Products and their Environmental Impact

Stale

2020-05-15

​18

Updated
Q8/5
Guide to the K & relevant L-series Recommendations
Extension of the Guide to cover relevant L-series Recommendations

Stale

2016-11-10


​60
Contributions will be submitted for next meeting

Q8/5

Mitigation Handbook - Additional case studies

Additional case studies to be added

Stale

2016-11-10


​60

Contributions will be submitted for next meeting


Q8/5
Terminology Handbook
Extension of the Terminology Handbook to cover relevant L-series terminologies

Stale


2010-11-08


132
Contributions will be submitted for next meeting

Q8/5
Terminology Handbook - web version

Web version of the Terminology Handbook

Stale


2016-11-10


60
Contributions will be submitted for next meeting

Q9/5



Application of the activities of the Task Force on Climate-related Financial Disclosures in the ICT sector

Stale


2020-05-13


18​

Updated


ITU-T SG5 Regional Groups

ITU-T SG5 Regional Group for Africa (SG5RG-AFR)

ITU-T SG5 Regional Group for the Arab Region (SG5RG-ARB)​

ITU-T SG5 Regional Group for Latin America (SG5RG-LATAM)

ITU-T SG5 Regional Group for Asia and the Pacific (SG5RG-AP)​
Collaboration matters and Information Sharing

The following TDs were presented by TSB and were noted during the ITU-T SG5 opening plenary:​

A Newcomers' session was held on 27 September 2021 together with ITU-T Study Group 20. The previous TDs were briefly presented and noted during the ITU-T SG5 opening plenary. More information about the Newcomers' session can be found here​.

Additionally, during the closing plenary, the following TDs were presented and were noted by the experts:
​Experts were invited to attend the 10th Green Standards Week (Virtual, 14-16 December 2021). The 10th GSW was dedicated to Driving Sustainable Digital Transformation through e-waste management and circular economy.


Session on TSAG and WTSA-20 preparation​

A session on TSAG (10-17 January 2022) and WTSA-20 (1-9 March 2022) preparations was held on Monday 6 December 2021 from 11:30 to 13:00 hours, Geneva time. During this session, SG5 experts agreed to the:
Working Party meetings

Question 8/5 - Guides and terminology on environment and climate change

During this meeting, Q8/5 experts reviewed four incoming liaison statements and prepared the respective responses.
The meeting report of Question 8/5 can be found in TD1998-R1.

Working Party 1/5 - EMC, lightning protection, EMF

Working Party 1/5 has made significant progress on various work items and achieved the following key outcomes:

Q1/5: Electrical protection, reliability, safety and security of ICT systems

The Rapporteur of Q1/5 (Mr Chuanyou Dai) opened the meeting and presented the draft agenda contained in TD1941-R1, which was approved without modifications.

Seven Contributions relevant to Q1/5 were received and discussed during the meeting. Six TD documents were submitted during the meeting to reflect and mark the revision of Contributions.

Five revised Recommendations and one new Recommendation were proposed to be submitted for consent. The work programme was also updated.

The report of Q1/5 meeting is contained in TD1991-R1.

Q2/5: Protecting equipment and devices against lightning and other electrical events

The Rapporteur of Q2/5 (Mr Mick Maytum) opened the meeting and presented the draft agenda contained in TD1942-R1, which was approved without modifications.

Eight contributions were received and discussed (C835 and C834 will serve as inputs for the revisions of ITU-T K.Suppl.24 “Rationale for setting resistibility requirements of telecommunication equipment installed in a telecommunication centre against lightning", ITU-T K.21 “Resistibility of telecommunication equipment installed in customer premises to overvoltages and overcurrents" and ITU-T K.45 “Resistibility of telecommunication equipment installed in the access and trunk networks to overvoltages and overcurrents".).

Q2/5 worked on the AAP comments of Recommendation ITU-T K.147 and produced a log of the Q2/5 responses and a track changes version of ITU-T K.147 for the AAP. Five liaisons were responded to, and five informational TDs were posted. One new work item was created (draft Recommendation ITU-T K.ecl “Surge protective component application guide - Electronic Current Limiters"). Q2/5 experts recommended to discontinue the work item on draft Recommendation ITU-T K.sod “Surge and over-current protection parameters of external disconnector for surge protective devices used in telecommunication equipment".

The report of Q2/5 meeting is contained in TD1992-R1.

Q
3/5: Human exposure to electromagnetic fields (EMFs) due to digital technologies

The Rapporteur of Q3/5 (Mr Fryderyk Lewicki) opened the meeting and presented the draft agenda contained in TD1943-R2, which was approved with modifications.

During the Q3/5 session, 20 input documents (including 14 contributions) were discussed.

Two revised Recommendations: ITU-T K.83 “Monitoring of the electromagnetic field levels" and the Recommendation ITU-T K.91 “Guidance for assessment, evaluation and monitoring of the human exposure to RF EMF" were sent for consent to ITU-T SG5.

The main objective of this meeting was to revise Recommendation ITU-T K.91 “Guidance for assessment, evaluation and monitoring of the human exposure to RF EMF", the basic ITU-T Recommendation concerning human exposure to EMF. It was updated the section concerning new EMF exposure limits and information on new radiocommunication systems such as 5G.

Appendix I to Recommendation ITU-T K.70 “Software "EMF-estimator" v8.0.32 and v8.64" was revised. Q3/5 also revised ITU-T K.Suppl.20 to ITU-T K.91 “Supplement on radiofrequency exposure evaluation around underground base stations". Both documents were submitted for agreement.

One input Liaison Statement concerning Wireless Power Transfer (WPT) systems was received (TD2020). This LS was  connected closely with Contribution C844-R2 Draft of K-Series Supplement -"EMF strength inside and outside of OLEV" from Korea. After extensive discussion and taking into consideration different views, it was decided to agree for the new work item (TD2131-R1 “ITU-T K.Suppl.WPT "EMF strength in and outside of OLEV") in which document C844-2 will be the basic text for the consideration during the next ITU-T SG5 meeting. The response to the LS contained in TD2020 was included in the outgoing Liaison Statement (TD2173-R1) with information on the results of Q3/5 virtual meeting, which will be sent to ITU-R and ITU-D in order to continue the good collaboration with both sectors.

Many contributions on the results of assessment of the RF EMF exposure from 5G systems were discussed and considered. Information included in these contributions will be used in the development and revision of related ITU-T Recommendations and Supplements. Many informative documents were discussed and will be used to enrich the future work of Q3/5. The work programme has been discussed, updated, and approved.

The report of Q3/5 meeting is contained in TD1993-R2.​

Q4/5: Electromagnetic compatibility (EMC) aspects in ICT environment

The Co-Rapporteurs of Q4/5 (Messrs Beniamino Gorini and Xing Hai Zhang) opened the meeting and presented the draft agenda contained inTD1944-R2, which was approved without modifications.

All documents related to Question 4/5 were discussed in the meeting segments from 1 to 6 December 2021. Seven technical Contributions were received and discussed.

It was agreed that the new revision of Recommendation ITU-T K.137 "Electromagnetic compatibility requirements and measurement methods for wireline telecommunication network equipment" will be submitted to WP1/5 for consent as contained in TD2099-R1. For this revision of ITU‑T K.137, the A.5 justification contained in TD2106 on the normative reference of ETSI EN 300 386 “Telecommunication network equipment; ElectroMagnetic Compatibility (EMC) requirements; Harmonised Standard covering the essential requirements of the Directive 2014/30/EU" was produced.

Progress was made on the following Work Items:​​

Q4/5 agreed to revise Recommendation ITU-T K.76 “EMC requirements for telecommunication network equipment (9 kHz-150 kHz)" as the requirements need to be updated.

Q4/5 Work programme was reviewed and updated as reported in clause 7 of this report.

The liaison statements assigned to Q4/5 were discussed and contributions were provided for the replies to SG5-TD2044 and SG5-TD1673 (JCA-IMT2020 roadmap).

Q4/5 had considered the SG5-TD2058-R3 “Draft Report of ITU-T SG5 to the World Telecommunication Standardization Assembly (WTSA-20), Part I: General" and SG5-TD2059-R2 “Draft Report of ITU-T SG5 to the World Telecommunication Standardization Assembly (WTSA-20), Part II: Questions proposed for study during the next study period (2021-2024)" and it was noted that some new Q4/5 Recommendations and Supplements were missing, and this was raised to TSB-SG5.

The report of Q4/5 meeting is contained in TD1994-R1.

Working Party 2/5 - Environment, Energy Efficiency and the Circular Economy

Working Party 2 has made significant progress and achieved the following key outcomes:

Q
6/5: Environmental efficiency of digital technologies

The Co-Rapporteurs of Q6/5 (Ms Silvia Giannubilo/Mr Stefano Nativi) opened the meeting and presented the draft agenda contained in TD1946-R4, which was approved with modifications.

All ten Contributions were reviewed and the documents under study were improved based on the Contributions received. Six incoming Liaisons were reviewed and discussed in detail; no outgoing liaison statements were approved.

FG-AI4EE had submitted two deliverables for consideration by Q6/5. Based on the input received during the Q6/5 discussion, two A.13 Justifications were created (TD2171 and TD2172), in order to start work items that will create supplements to be agreed next year.

Four new Work Items including: L.NCIe “network carbon intensity", L.Suppl.gcai “FG-AI4EE D.WG3-01 – Guidelines on the Implementation of Eco-friendly Criteria for AI and other Emerging Technologies", L.Suppl.cdep “FG-AI4EE D.WG2-02 – Computer processing, data management and energy perspective",  and L.Sup.EMUE “Energy related mobile end-user experience".

During the WP2/5 closing plenary, it was decided that the new work item draft Supplement L.Sup.EMUE “Energy related mobile end-user experience" will be proposed to ETSI TC EE as a technical-aligned deliverable,​ and a liaison statement was prepared and approved during the WP2/5 closing plenary.

The report of Q6/5 meeting is contained in TD1996-R1.

Q7/5: E-waste, circular economy and sustainable supply chain management

The Co-Rapporteurs of Q7/5 (Ms Nevine Tewfik/Mr Leandro Navarro) opened the meeting and presented the draft agenda contained in TD1947-R3, which was approved without modifications.

Q7/5 received a total of 19 Contributions for the following eight work items, in ​addition to Contributions to open new work items​:  ​

​All Contributions were discussed during the Q7/5 sessions.  Experts agreed to submit the final documents of draft Recommendations ITU-T L.SM_Batteries “Sustainable Management of Batteries" as contained in TD2094-R1; ITU-T L.TWS “Method for Evaluation of the Environmental and Safety Performance of True Wireless Stereo Headphones" as contained in TD2168-R1 and L.ewaste-base_station “Scheduled Waste Management for Base Station (inclusive of e-waste)" as contained in TD2164-R1 for consent at SG5 meeting.

Six new work items were agreed upon by experts and the relevant A.1 and A.13 forms were prepared and reviewed.  A presentation on “Introduction to Digital Product Passport from the European Commission", as contained in TD2082, was delivered by Mr Ilias Iakovidis. Taking into consideration the discussions held during this presentation and those presentations delivered during the WP2/5 Opening Plenary, a proposal was made to revise Recommendation ITU-T L.1031 “Guideline for achieving the e-waste targets of the Connect 2030 Agenda" to reflect developments in the e-waste sector as contained in TD2163-R1.

Four incoming liaisons were discussed and the replies to them were prepared by Q7/5, in addition to outgoing liaisons initiated by Q7/5 to relevant standardization bodies.

All work items discussed during the meeting were updated with recent developments and new content.  New baseline documents were developed for all work items.

Q7/5 successfully concluded the AAP discussion for draft Recommendation ITU-T L.1050 “Methodology to identify the key equipment in order to assess the environmental impact and e-waste generation of different network architectures".  During the session, comments received from Ericsson were reviewed and discussed.  A consensus was reached on the amendments.  Experts sent the additional review text based on the agreed changes, found in TD2160.

The report of Q7/5 meeting is contained in TD1997-R2.

Q9/5: Climate change and assessment of digital technologies in the framework of the Sustainable Development Goals (SDGs) and the Paris Agreement

The Co-Rapporteurs of Q9/5 (Mr Jean Manuel Canet/ Ms Pernilla Bergmark) opened the meeting and presented the draft agenda contained in TD1949-R1, which was approved with modifications.

No Recommendations were proposed for consent, but good progress was made for draft Recommendations ITU-T L.Enablement “Assessment of GHG emissions reductions enabled by ICT services in support of the Net Zero transition" (outcome reflected in TD2116-R1) and ITU-T L.VirtualMeetings “Methodology for estimating GHG emissions in the frame of virtual meetings and events" (outcome reflected in TD 2104-R1).

With regard to these two work items, formal discussions took place with two invited experts, Dr Bieser and Dr Coroama. The outcome of the discussions was noted in the aforementioned TDs and will be considered in the continued development of the Recommendations. In particular, the discussion elaborated on the rebound effect and on the complexities and need for a systemic view on the environmental impacts of ICT.

Ten new work items were agreed including new work items on the assessment of ICT organizations' footprints on biodiversity, and of the GHG emissions of specific products and installations. Other new work items include guidance on setting up a database for the carbon footprint of the ICT sector and the development of intensity indicators for GHG emissions of operators. It was also agreed to revise Recommendations ITU-T L.1420 “Methodology for energy consumption and greenhouse gas emissions impact assessment of information and communication technologies in organizations" on organizational GHG emissions assessment in particular with regards to scope 3 on emissions, and ITU-T L.1471 “Guidance and criteria for information and communication technology organizations on setting Net Zero targets and strategies" for further alignment with SBTi. Information on the new work items is available in the updated work programme.

Following a proposal from WP2/5 Chairman Paolo Gemma, as contained in TD2086, it was agreed that it would be ideal to establish a formal relationship between SG5 (in particular Q9/5) and the European Green Digital Coalition (EGDC) which has a strong interest in Q9/5 deliverables. Co-Rapporteurs will reach out to TSB for the next steps and explore how this collaboration could be established.

The report of Q9/5 meeting is contained in TD1999-R3 .

Q
11/5: Climate change mitigation and smart energy solutions

The Co-Rapporteurs of Q11/5 (Ms Qi Shuguang/Mr Sangjin Jeong) opened the meeting and presented the draft agenda contained in TD1950-R3, which was approved with modifications.

All six contributions were reviewed and the documents under study were improved based on the contributions received. Eleven incoming Liaisons were discussed in detail and two outgoing Liaison Statements were prepared.

Based on the discussion, four new work items regarding the decarbonization of base station sites, data centres and telecommunication rooms, industrial parks and smart city were initiated. Specifically, the new work items are: draft Recommendation ITU-T L.MM&BP_IP “Measurement methodology and Best Practices for decarbonization of Industrial Park in support of Net Zero"; ITU-T L.MM&BP_BS “Measurement methodology and Best Practices for decarbonization of Base Station sites in support of Net Zero"; ITU-T L.MM&BP_DC “Measurement methodology and Best Practices for decarbonization of Data Center and Telecommunication Room in support of Net Zero"; and ITU-T L.BP_SC “Best Practices for decarbonization of Smart City in support of Net Zero".

Draft Recommendations ITU-T L.ESE “Evaluation method of safety operations and energy saving for power supply system in telecommunication room/building", ITU-T L.10kVAC_up to 400VDC “Specifications of 10kV AC input and up to 400VDC output integrated power system in data centre and telecommunication room" and ITU-T L.PSU_for server “Methodologies for evaluating the functionality and performance of power supply unit configured for servers" were progressed.

The report of Q11/5 meeting is contained in TD2001-R2.

Q
12/5: Adaptation to climate change through sustainable and resilient digital technologies

The Co-Rapporteurs of Q12/5 (Messrs Claudio Bianco and Derick Khamali) opened the meeting and presented the draft agenda contained in TD1951-R1, which was approved with modifications.

The Q12/5 Team discussed the status of the Q12/5 in detail and held six sessions. Two Contributions were received and processed (C865-R1 and C901). Two TDs related to the Contributions received were generated as TD2128 and TD2167.

It was agreed that TD2128 will align the supplement to consolidate and update the past works on sustainability and adaptation to climate change while TD2167 will be discussed in upcoming online meetings and will be used to pinpoint critical sectors that will benefit from the deployment of Resilient Sustainable Digital Technologies.

The meeting also reviewed the Liaison Statements that were received for its attention and will include relevant information that could be used to advance the work of Q12/5.

The report of Q12/5 meeting is contained in TD2002-R1.

Q
13/5: Building circular and sustainable cities and communities​

The Rapporteur of Q13/5 (Mr Leonidas Anthopoulos) opened the meeting and presented the draft agenda contained in TD1952-R2, which was approved with modifications.

Q13/5 meeting reviewed the submitted Contributions and Liaison Statements and the following results were achieved.

A new work item has been agreed, draft Recommendation ITU-T L.FrameworkBIMSssc “Framework of Building Infrastructure Management System for Sustainable City", based on the output document TD2103-R2. The aim will be to define the framework of building infrastructure management system that improves the sustainability of the city, particularly buildings as a city asset.

Progress was made on the draft Supplement, ITU-T Suppl. Definitions_CC on “Definitions and Recent Trends in Circular Cities" based on Contribution C892 and the output document TD2101-R2; Q13/5 experts agreed to send for agreement this draft Supplement to WP2/5.

Progress was also made on draft Recommendation ITU-T L.FUB on “Development framework for bioeconomy for cities and communities " based on Contribution C893 and the output document TD2102-R2; Q13/5 experts agreed to continue working on this work item.

The report of Q13/5 meeting is contained in TD2003-R1.

Rapporteur group e-meetings 

The complete list of planned e-meetings can be found here.

Updates in the SG5 Management Team and Rap​porteurs:

During the ITU-T SG5 closing plenary the following expert was nominated as Associate Rapporteurs as contained in
TD1931-R1:​​

Focus Group on “Environmental Efficiency for Artificial Intelligence and other Emerging Technologies" (FG-AI4EE)

The FG-AI4EE Co-chairman, Mr Paolo Gemma, presented the progress report of the FG-AI4EE as contained in TD2018.

The fourth meeting of the Focus Group was held virtually on 21 October 2021 and was attended by 62 participants. The Focus Group meeting was preceded by an ITU webinar on "AI for environmental sustainability", organized on the margins of the AI for Good Global Summit.

The FG-AI4EE requested ITU-T SG5 for a one-year extension, to last until December 2022. This request was approved by ITU-T SG5.

As outcome of the 4th FG-AI4EE meeting, the FG-AI4EE submitted four deliverables to ITU-T Study Group 5 (TD1980). The deliverables have been processed as follows:

​Delive​​rable #

Type

Title

Action taken by ITU-T SG5

D.WG2-02

TR


Computer Processing, Data management and Energy perspective

​It was adopted as a draft Supplement as contained in the A.13 justification (TD2171)

D.WG2-06

TR

Assessment of Environmentally Efficient Data Centre and Cloud Computing in the framework of the UN Sustainable Development Goals (SDGs)

It was adopted as a draft Supplement as contained in the A.13 justification (TD2115).


D.WG3-01

TR


Guidelines on the implementation of eco-friendly criteria for AI and other emerging technologies

It was adopted as a draft Supplement as contained in the A.13 justification (TD2172)

D.WG3-03

TR


Application of AI technology in improving energy efficiency of telecom equipment rooms and Internet Data Centre infrastructure

It was adopted as a draft Supplement as contained in the A.13 justification (TD2176​)

It is proposed that the next meeting of the FG-AI4EE takes place in April 2022. The exact dates and venue will be confirmed later.

The FG-AI4EE website is available here.

Dates of the next ITU-T SG5 meeting
The next meeting of ITU-T SG5 is planned to take place virtually from 20 June to 1 July 2022.​


 
​Executive Summary from previous meetings: 2021-05​ I 2020-102020-05​​2019-092019-05​​ | ​2018-09 | 2018-05​ | 2018-03 | 2017-11 | 2017-05 | 2016-04 | 2015-10 | 2014-12 | 2014-07 | 2014-05 | 2013-12 | 2013-01 | 2012-04 | 2011-09 | 2011-04 | 2010-11 | 2010-04 | 2010-01 | 2009-10 | 2009-05 | 2008-11 | 2008-02