|
SG9-LS62
- [https://www.itu.int/ifa/t/2022/ls/sg9/sp17-sg9-oLS-00062.zip]
|
LS on progress made on the draft new Recommendation ITU-T J.acc-us-prof "Requirements for the specific semantics of a Common User Profile used to personalize audiovisual media" and the new Technical Report TR.CUP “Concept of a Common User Profile format used to personalize audiovisual media” during the SG9 meeting held in Bogota, Colombia [14-23 November 2023]
|
Approved on 2023-11-23.
|
Source:
|
ITU-T Study Group 9
|
For action to:
|
-
|
For information to:
|
DVB TM;
|
Deadline:
|
-
|
|
|
SG9-LS61
- [https://www.itu.int/ifa/t/2022/ls/sg9/sp17-sg9-oLS-00061.zip]
|
LS on progress made on the draft new ITU-T Technical Report JSTR.LCAP "Technical advances, challenges, and best practices in live captioning", draft new Recommendation ITU-T J.acc-us-prof "Requirements for the specific semantics of a Common User Profile used to personalize audiovisual media", and the new Technical Report TR.CUP “Concept of a Common User Profile format used to personalize audiovisual media” during the SG9 meeting held in Bogota, Colombia [14-23 November 2023]
|
Approved on 2023-11-23.
|
Source:
|
ITU-T Study Group 9
|
For action to:
|
-
|
For information to:
|
ITU-R WP 6C; IRG-AVA; SG16;
|
Deadline:
|
-
|
|
|
|
|
|
|
|
|
|
|
|
|
SG9-LS50
- [https://www.itu.int/ifa/t/2022/ls/sg9/sp17-sg9-oLS-00050.zip]
|
LS on agreement of a draft new ITU-T J Supplement 13 (ex J.FSR-TEST) "Factual subscriber-base reporting and protected content delivery in Conditional Access System - Test Methods" during the SG9 meeting held in Bogota, Colombia [14-23 November 2023]
|
Approved on 2023-11-23.
|
Source:
|
ITU-T Study Group 9
|
For action to:
|
-
|
For information to:
|
CASC; SG11;
|
Deadline:
|
-
|
|
|
|
SG9-LS48
- [https://www.itu.int/ifa/t/2022/ls/sg9/sp17-sg9-oLS-00048.zip]
|
LS on information about the progress of draft Recommendation ITU-T J.cable-5G-arch “System Architecture for cable television services to use IMT-2020 radio system”
|
Approved on 2023-11-23.
|
Source:
|
ITU-T Study Group 9
|
For action to:
|
-
|
For information to:
|
ITU-R SG 5; ITU-R SG 6; JCA-IMT2020; SG11; SG13;
|
Deadline:
|
-
|
|
|
|
SG9-LS46
- [https://www.itu.int/ifa/t/2022/ls/sg9/sp17-sg9-oLS-00046.zip]
|
LS on AAP consent of two draft new Recommendations ITU-T J.198.2 (ex J.HiNoC3-PHY) and ITU-T J.198.3 (ex J.HiNoC3-MAC) and Agreement of draft new Supplement ITU-T J. Suppl. 12 (ex J.Sup-HiNoC)
|
Approved on 2023-11-23.
|
Source:
|
ITU-T Study Group 9
|
For action to:
|
-
|
For information to:
|
CCSA; IEC TC 100; SCTE; TTA; TTC; IEEE 802.3 Ethernet WG; Cable Labs; ETSI TC Cable; SG15;
|
Deadline:
|
-
|
|
|
|
SG5-LS113
- [https://www.itu.int/ifa/t/2022/ls/sg5/sp17-sg5-oLS-00113.docx]
|
LS on draft Recommendation ITU-T K.DMEI “Determination and mitigation of electromagnetic interference between base stations due to tropospheric radio-duct”
|
Approved on 2023-11-22.
|
Source:
|
ITU-T Study Group 5
|
For action to:
|
ITU-R SG 1; ITU-R SG 5; ITU-R SG 3;
|
For information to:
|
-
|
Deadline:
|
2024-03-31
|
|
|