Page 935 - 5G Basics - Core Network Aspects
P. 935

Transport aspects                                              2


            Field  3  "Upstream  reference  PSD  (MREFPSDus)"  indicates  the  MREFPSDus  as  defined  in  clause 7.3.2
            (Table 7-1) on all MEDLEYus subcarriers indicated in field 4. The format shall be presented using the "PSD
            descriptor" format defined in Table 12-22 and the number of breakpoints being described shall be from 2
            to 32. The update of PSD values obtained by the FTU-O on other subcarriers than MEDLEYus set shall be
            ignored. The indicated breakpoint values and the interpolated values of MREFPSDus shall not deviate from
            the actual value of the transmit PSD, as measured in the termination impedance at the U interface, by more
            than 1 dB.

            Field 4 "Final MEDLEY set of active US subcarriers "includes a complete set of upstream MEDLEY subcarriers
            using the band descriptor presented in Table 12-21, along with all subcarriers from the BLACKOUTus set
            (O-PRM, field 5) that fall within the range of frequencies for the included complete set of upstream MEDLEY
            subcarriers. The final MEDLEY set of active US subcarriers shall consist of all subcarriers included in this field
            except the upstream BLACKOUTus subcarriers (O-PRM, field 5). This field shall contain only subcarriers that
            belong to the proposed MEDLEY set of active US subcarriers as indicated in the field 2 of O-PRM message.

            12.3.3.3   Signals transmitted during channel discovery phase

            12.3.3.3.1  Signals during QUIET 1 stage
            12.3.3.3.1.1    O-P-QUIET 1

            The O-P-QUIET 1 signal shall consist of QUIET symbols only.
            The duration of O-P-QUIET 1 signal is variable with a valid range from 2 to 128 superframes. Its duration is
            determined by the FTU-O and is not necessarily an integer number of superframes.
            The O-P-QUIET 1 signal shall be followed by the O-P-VECTOR 1 signal. The FTU-O terminates the QUIET 1
            stage by starting transmission of the O-P-VECTOR 1 signal at a superframe boundary.

            12.3.3.3.1.2    R-P-QUIET 1
            The R-P-QUIET 1 signal shall consist of QUIET symbols only.
            The R-P-QUIET 1 signal shall be continued until the FTU-R receives the O-SIGNATURE message.

            12.3.3.3.2    Signals during O-VECTOR 1 stage

            12.3.3.3.2.1    O-P-VECTOR 1
            Upon completion of the O-VECTOR 1 stage, the VCE determines the downstream PSD to be used during
            further stages of channel discovery phase (CDPSDds).
            NOTE – During transmission of the O-P-VECTOR 1 signal, the VCE estimates the downstream FEXT channels from the
            initializing lines into the vectored lines based on the reported VF samples from the FTU-Rs of the vectored lines. Upon
            completion  of  the  O-VECTOR  1  stage,  downstream  FEXT  cancellation  matrices  are  established  by  the  VCE  for  all
            vectored lines and FEXT from the initializing line into vectored lines is cancelled.
            The O-P-VECTOR 1 signal shall consist of downstream sync symbols and quiet symbols only. Sync symbols
            shall be transmitted at each downstream sync symbol position. Quiet symbols shall be transmitted at all
            other downstream symbol positions (see Figure 10-26). The sync symbols shall be generated as described in
            clause 10.2.2.1. The SOC shall be in its inactive state.
            The O-P-VECTOR 1 signal shall use all subcarriers from the SUPPORTEDCARRIERSds set. The transmit PSD of
            all subcarriers shall be equal to STARTPSDds.
            The  FTU-O  shall  use  the  probe  sequence  assigned  to  the  initializing  line  by  the  vectoring  control  entity
            (VCE).

            The  duration  of  the  O-VECTOR  1  stage  is  vendor  discretionary,  but  shall  be  an  integer  number  of
            superframes with the minimum of four superframes and maximum of 1 536 superframes (to be consistent
            with  the  timeout  specified  in  clause  12.3.1).  The  O-P-VECTOR 1  signal  shall  be  followed  by  the
            O-P-CHANNEL-DISCOVERY  1-1  signal;  transition  to  O-P-CHANNEL-DISCOVERY  1-1  signal  determines  the
            actual  duration  of  the  O-VECTOR 1  stage.  The  start  time  of  the  CHANNEL  DISCOVERY  1-1  stage  is



                                                                                                         925
   930   931   932   933   934   935   936   937   938   939   940