Committed to connecting the world

  •  
wtisd

ITU-T Recommendations

Search by number:
Others:
Skip Navigation Links
Content search
Advanced search
Provisional name
Equivalent number
Formal description
Study Groups tree viewExpand Study Groups tree view

ITU-T L.259/L.73 (04/2008)

عربي | 中文 | English | Español | Français | Русский
地下塑料管道的检查和维修方法
在管道安装到沟壕中并被回填后,但在任何表面建筑开始前,检查管道质量是一种通常做法,因为某些塑料管道可能变成椭圆形,被穿通或破损。ITU-T L.73建议书描述了采用测试芯棒和闭路电视(CCTV)系统来检查管道质量的检查方法,还描述了用来修理地下管道的各种方法。介绍了称为不开挖即可维修的“不挖沟方法”,还介绍了传统的维修方法。此外,还建议了选择适当维修方法的导则。预计本建议书将提供检查和维修工作的备选解决方案。
Citation: https://handle.itu.int/11.1002/1000/9330
Series title: L series: Environment and ICTs, climate change, e-waste, energy efficiency; construction, installation and protection of cables and other elements of outside plant
L series: Environment and ICTs, climate change, e-waste, energy efficiency; construction, installation and protection of cables and other elements of outside plant
  L.200-L.299: Optical infrastructures
  L.250-L.299: General aspects and network design
Approval date: 2008-04-06
Provisional name:L.irud
Approval process:AAP
Status: In force
Observation:Former ITU-T L.73 renumbered as ITU-T L.259 on 2016-02-15 without further modification and without being republished.
Maintenance responsibility: ITU-T Study Group 15
Further details: Patent statement(s)
Development history