6.3.8.2.5      Operation, Administration, and Maintenance (OA&M)

            The SSC Platform must include the necessary indicators to allow its adequate maintenance ensuring:


            •  Preventive Maintenance: Storage and assessment of relevant indicators for maintenance
                management. Generation of maintenance plans based on these data.

            •  Corrective Maintenance (Warning Management): Possibility to manage warnings or alarms
                and send messages, e-mails, SMS, and calls based on these.

            6.3.8.2.6      Process control


            The SSC Platform should allow the control of the execution of the following processes, whether
            internal or external:

            •  Analysis of consumption, alarms, trends, etc.

            •  Cost allocation
            •  Sustainability (efficient use of facilities, emissions, etc.)

            •  Optimization of processes and planning

            •  Quality control of public services by third parties
            •  Crisis room

            •  Generation of exploitation reports


            6.3.8.2.7      Decision support

            The SSC Platform should have tools to improve the resilience of the city and decision making such
            as:

            •  Simulation based on current and historical information.

            •  Assessment and execution of action plans in complex scenarios.

            •  Predictive analysis and city modelling.
            •  Data mining and statistical analysis.

            •  Integration with other BI systems and tools.


            6.3.8.2.8      Dissemination of Public Information in real-time

            The Platform must allow the information to be transmitted in an open, reliable and quality way,
            continuously and without interruptions, in a standard format to allow access to it from multiple
            devices. This information applies to scenarios such as:

            •  Final services for the citizen.