Page 14 - Methodology for inter-operator and cross-border P2P money transfers
P. 14

Figure 1 – P2P money transfer roles and team activities




















































            8�2  Test parameterization and neutral starting state  neutral state again. Respective considerations are in
            A particular property of systematic service tests is   full analogy to testing of e.g., telephony.
            a frequency of service usages which is significantly   A testing campaign, therefore, should contain a
            higher than the usage frequency created by a typical   pre-testing phase with systematic tests to make sure
            end user.                                          that usage frequencies typical for testing do not
            While a high testing frequency leads to a high yield   affect testing results with respect to the end-user
            of samples for computation of QoS KPI, it is conceiv-  perspective.
            able that the system has a certain “dead time” after   NOTE  –  In  actual  implementations,  there  may  be
            each transaction, where the system would not accept   limitations applied by the DFS providers limiting the
            a new transaction or create unexpected results of a   number of transactions per day, or the total amount
            transaction attempted within this period of time. It is   of transferred money per day or another period of
            advisable to be aware of this possibility and obtain   time. It is also conceivable that mechanisms exist
            respective information before actual parameters of a   which limit the frequency of testing. When setting
            test campaign are determined.                      up tests, it is important to check for such condi-
            The testing frequency can be controlled by a pause   tions. This starts with creating awareness of testers
            between transactions, which also acts as a guard   for effects of such mechanisms, and be prepared
            time to allow the service under test to reach its   to adapt data processing accordingly if respective



            12   Methodology for inter-operator and cross-border P2P money transfers
   9   10   11   12   13   14   15   16   17   18   19