Page 19 - Methodology for inter-operator and cross-border P2P money transfers
P. 19

Figure 4 – Schematic allocation of data sources to devices



































            the handling effort, i.e., to combine apps on the same   different networks, one or several of the following
            platform. The actual decision is made by the Field   conditions can apply:
            Test Lead (FTL) on the basis of a benefit-to-effort
            consideration. It is recommended to also run checks   •  Testing teams may be in different locations with-
            (e.g., on the data from the first days of a measure-  out direct communication between them. This
            ment campaign) to make sure that there are no        means that each team only sees a part of the
            negative effects, or only effects on a tolerable scale.  overall set of events belonging to a transaction.
            The DFS application must be always visible in order to   NOTE – Enabling real-time communication
            record events properly, and the MSW app also needs   between teams – e.g., via audio/video conferenc-
            to be on top of the screen for delay-free recording   ing solutions) requires adequate data bandwidth
            of events. Therefore from all possible combinations,   which limits applicability to respective situations.
            only a few remain: There must be at least two devic-  A powerful means of communication between
            es; the network-testing app can run on either the    teams would be an automated dashboard, making
            device running the DFS use case (“DFS device”), or   processed information available in near real time.
            the device running the MSW app. With the further     Technically, such a solution is easily feasible giv-
            consideration that network testing also uses packet   en the required amount of budget. In the actual
            data resources, the second configuration is the one   design of such a system, using as little as possible
            of choice, as shown schematically in Figure 4.       data bandwidth would have to be a major design
            Please note that this is a rather schematic and simpli-  goal in order to assure operation under a wide
            fied view. Details given in the following sub clauses   range of on-site conditions.
            have precedence.                                   •  There may be multiple teams at work in the same
                                                                 time period.
            11�1  Basic Considerations for data collection and
            processing                                         Consequently, additional information – beyond what
            In the case of measurement campaigns involving     is collected by the testing tools itself – is required to
            cross-border transactions, and transactions between   produce the desired information, i.e., DFS KPI.
                                                               Basically, it must be known which team or pair of
                                                               teams is running which scenario in which period of



                                                       Methodology for inter-operator and cross-border P2P money transfers  17
   14   15   16   17   18   19   20   21   22   23   24