Page 903 - Cloud computing: From paradigm to operation
P. 903

Intercloud and interoperability                                     5


            II.1.11  Test case: VM life cycle management

            Table II.11 shows the test case for VM life cycle management.


                                      Table II.11 – Test case: VM life cycle management

                                           VM life cycle management test description
             Test purpose          To verify that the CSC manages the VM with various operations including start,
                                   shutdown, restart, suspend and resume VM.

             Reference             [ITU-T Y.3513] clause 7.1.2
             Test sequence   Step      Type                          Description                      Result
                            1      Stimulus      The CSC shuts down a VM which has its power on.
                            2      Check         The state of the VM is power off.
                            3      Stimulus      The CSC starts the VM.
                            4      Check         The state of the VM is power on.
                            5      Stimulus      The CSC restarts the VM.
                            6      Check         The state of the VM is power on.
                            7      Stimulus      The CSC suspends the VM, tries to log in VM's operating
                                                 system through SSH, VNC or other tools provided by the CSP.
                            8      Check         The state of the VM is suspended and VM's activity is paused.
                                                 The CSC cannot log in the VM's operating system through
                                                 SSH, VNC or other tools.
                            9      Stimulus      The CSC resumes the VM, then checks the power states of
                                                 the VM, tries to log in VM's operating system through SSH,
                                                 VNC or other tools provided by the CSP.
                            10     Check         The state of the VM is power on and the VM's activity is
                                                 consistent with the moment before suspend operation.
             Test verdict   It is deemed as successfully terminated if all the checks are successful, otherwise it is
                            deemed as failed.

            II.1.12  Test case: physical machine life cycle management

            Table II.12 shows the test case for physical machine life cycle management.


                                Table II.12 – Test case: physical machine life cycle management

                                     Physical machine life cycle management test description
             Test purpose          To verify that the CSC manages a physical machine with various operations including
                                   start, shutdown, hibernate and wakeup.
             Reference             [ITU-T Y.3513] clause 7.1.1

             Test sequence   Step      Type                          Description                      Result
                            1      Stimulus      The CSC shuts down a physical machine which has its power
                                                 on.
                            2      Check         The state of the physical machine is power off.
                            3      Stimulus      The CSC starts the physical machine.
                            4      Check         The state of the physical machine is power on.

                            5      Stimulus      The CSC hibernates a physical machine which is in power on
                                                 state.
                            6      Check         The state of the physical machine is hibernate.