AAP Recommendation

G.709/Y.1331 (2003) Cor.1: Interfaces for the Optical Transport Network (OTN)

Study Group
15

Study Period
2005-2008

Consent Date
2006-11-10

Approval Date
2006-12-14

Provisional Name


Input used for Consent
TD 334-PLEN

Status
AT

IPR
Site

This draft Corrigendum 1 to G.709 (03/2003) clarifies the - operational conditions under which overlapping tandem connection monitoring should be used - location of the PJO1 and PJO2 fields in the OPU3 for the case of ODU2 mapping into four tributary slots of the OPU3.

AAP Current Status
Step # Action
Start / End
Status Announcement Related documents Comments / Resolution logs