International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-R : R23-WP5D : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R R23-WP5D  C 

ITU-R R23-WP5D

IMT Systems

Results:239 total items.
Result page:  1 - 2 - 3 - 4 - 5  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 239 ]  
(Rev.1) 
Update Report on CITEL PCC.II activities     CITEL Rapporteur     2024-06-24
[ 238 ]  
 
Liaison statement on results of the seventh and final meeting of the FG-MV     ITU-T FG-MV     2024-06-24
[ 237 ]  
 
Reply liaison statement to Working Party 7C (copy to Working Parties 4C, 5A, 5D and 7D for information) - Beam Wireless Power Transmission (WPT)     WP 1A     2024-06-21
[ 236 ]  
 
Reply liaison statement to Working Party 4C (copy to Working Parties 5A, 5D, 7C and 7D for information) - Work of Working Party 1A on beam-Wireless Power     WP 1A     2024-06-21
[ 235 ]  
 
Reply liaison statement to Working Party 7D (copy to Working Parties 4C, 5A, 5D and 7C for information) - Beam Wireless Power Transmission (WPT)     WP 1A     2024-06-21
[ 234 ]  
 
Reply liaison statement to ITU-T Study Group 5 (copy to ITU-R Working Party 5D for information) - Determination and mitigation of electromagnetic compatibility issues for 5G TDD network under tropospheric duct effect     WP 1C     2024-06-21
[ 233 ]  
 
Update on activities in Region 3     Rapporteur Region 3     2024-06-19
[ 232 ]  
 
Liaison statement on draft Recommendation ITU-T K.DMEI "Determination and mitigation of electromagnetic compatibility issues for 5G TDD network under tropospheric duct effect"     ITU-T SG5     2024-06-18
[ 231 ]  
 
Required EMC emission levels in MM wave bands     Netherlands (Kingdom of the)     2024-06-13
[ 230 ]  
 
Proposal to the working document towards a preliminary draft new Recommendation / Report ITU-R S.[MITIGATION MEASURES] from Working Party 4A     Nokia Corporation (Finland)     2024-06-13
[ 229 ]  
 
Proposal to the preliminary draft new Report ITU-R RA.[RAS-IMT-COMPAT-43-GHZ] from Working Party 7D     Nokia Corporation (Finland)     2024-06-13
[ 228 ]  
 
Initial observations on the candidate technology towards revision-3 of IMT-2020     5G India Forum     2024-06-13
[ 227 ]  
 
Inputs to Working Party 5D#46 (June 2024) on coverage, mobility, sustainability, AI related capabilities towards working Document 5D/77 on M.[TPR] for IMT-2030     Reliance Jio Infocomm Limited (India)     2024-06-13
[ 226 ]  
 
Inputs to Working Party 5D#46 (June 2024) on Annex 2 towards working Document 5D/77 on M.[TPR] for IMT-2030     Reliance Jio Infocomm Limited (India)     2024-06-13
[ 225 ]  
 
Proposed draft reply liaison statement to Working Party 4C on WRC-27 agenda item 1.13     Reliance Jio Infocomm Limited (India) , Bharti Airtel Limited (India)   AI1.13   2024-06-13
[ 224 ]  
 
Proposal on working document towards a preliminary draft new Report ITU-R M.[IMT-2030.TECH PERF REQ] - Minimum requirements related to technical performance for IMT-2030 radio interface(s)     India     2024-06-13
[ 223 ]  
 
Proposal for the working document towards a preliminary draft revision of Report ITU-R M.2527-0 - Applications of the terrestrial component of International Mobile Telecommunications for specific societal, industrial and other usages     India     2024-06-13
[ 222 ]  
 
Proposal for the working document towards a preliminary draft revision of Report ITU-R M.2480 - National approaches of some countries on the implementation of terrestrial IMT systems in bands identified for IMT     India     2024-06-13
[ 221 ]  
 
Proposal towards sharing and compatibility studies of IMT systems for WRC-27 agenda item 1.7     India   AI1.7   2024-06-13
[ 220 ]  
 
Proposal for the working document towards preliminary draft new Report ITU-R M.[IMT-2030.TECH PERF REQ]     Qualcomm, Inc. (United States)     2024-06-13
[ 219 ]  
 
Proposal for the working document towards preliminary draft new Report ITU-R M.[IMT-2030.EVAL]     Qualcomm, Inc. (United States)     2024-06-13
[ 218 ]  
 
Proposals for the working document towards a preliminary draft new Report ITU-R M.[IMT-2030.TECH PERF REQ]     Telefon AB - LM Ericsson (Sweden)     2024-06-13
[ 217 ]  
 
Considerations of test environments for the evaluation of IMT-2030     Telefon AB - LM Ericsson (Sweden)     2024-06-13
[ 216 ]  
 
Considerations for developing new ITU-R report of Technology Performance Requirements (TPR) for IMT-2030 and beyond - Security and resilience     Electronics and Telecommunications Research Institute (ETRI) (Korea (Rep. of))     2024-06-12
[ 215 ]  
 
Considerations for developing new ITU-R report of Technology Performance Requirements (TPR) for IMT-2030 and beyond - AI-related capacity     Electronics and Telecommunications Research Institute (ETRI) (Korea (Rep. of))     2024-06-12
[ 214 ]  
 
This document has been withdrawn     N/A     2024-06-13
[ 213 ]  
 
Proposed system characteristics to be considered for Earth Exploration-Satellite Service (EESS) (space-to-earth) in the band 8 025 8 400 MHz under agenda item 1.7     Egypt   AI1.7   2024-06-13
[ 212 ]  
 
List of assignments that the administration of Arab Republic of Egypt had notified to the bureau and that are within the frequency band subject to WRC-27 agenda item 1.13     Egypt   AI1.7   2024-06-13
[ 211 ]  
 
Draft working document on sharing and compatibility studies of IMT systems in the frequency band 7 125-8 400 MHz     Egypt   AI1.7   2024-06-13
[ 210 ]  
 
Draft working document on sharing and compatibility studies of IMT systems in the frequency band 4 400-4 800 MHz     Egypt   AI1.7   2024-06-13
[ 209 ]  
 
Draft document on sharing and compatibility studies of IMT systems in the frequency band 14.8-15.35 GHz     Egypt     2024-06-13
[ 208 ]  
 
Calculation of pfd limits for protection of terrestrial IMT under WRC-27 agenda item 1.13     Germany   AI1.13   2024-06-13
[ 207 ]  
 
Proposed draft reply liaison statement to Working Party 4C concerning WRC-27 agenda item 1.13     Japan   AI1.13   2024-06-13
[ 206 ]  
 
Proposed working document on frequency arrangements used for terrestrial IMT systems in the frequency ranges between 694/698 MHz and 2.7 GHz concerning WRC-27 agenda item 1.13     Japan   AI1.13   2024-06-13
[ 205 ]  
 
Proposals on working document on characteristics of terrestrial component of IMT for sharing and compatibility studies in preparation for WRC-27     Japan     2024-06-13
[ 204 ]  
 
Proposal on a draft reply liaison statement to Working Parties 4C and 7B for WRC-27 agenda items 1.12, 1.13, 1.14, 1.15     Japan   AI1.15, AI1.14, AI1.13, AI1.12   2024-06-13
[ 203 ]  
 
Proposal to finalize the work on draft revision of Recommendation ITU-R M.1036-7     Japan     2024-06-13
[ 202 ]  
 
Proposals to working document of document IMT-2030/2 "Process: submission, evaluation process and consensus building for IMT-2030"     Japan     2024-06-13
[ 201 ]  
 
Proposals to working document towards a preliminary draft new Recommendations ITU-R M.[IMT-2020.UNWANT.BS] and M.[IMT-2020.UNWANT.MS]     Japan     2024-06-13
[ 200 ]  
 
Proposals to working document toward preliminary draft new Report ITU-R M.[IMT-2030.TECH PERF REQ] on "4.10 Positioning"     Japan     2024-06-13
[ 199 ]  
 
Proposals to working document towards a preliminary draft new Report ITU-R M.[IMT-2030.TECH PERF REQ]     Japan     2024-06-13
[ 198 ]  
 
IMT characteristics for use in WRC-27 studies     GSM Association (United Kingdom)     2024-06-13
[ 197 ]  
 
Considerations for the active antenna array radiation pattern model for IMT base stations     Telefon AB - LM Ericsson (Sweden)     2024-06-13
[ 196 ]  
 
Considerations on possible methodology to be used for sharing studies to assess protection of receiving space stations in the 7125-8400 MHz range (WRC-27 agenda item 1.7)     France   AI1.7   2024-06-13
[ 195 ]  
 
Proposals on Recommendation ITU-R S.[MITIGATION MEASURES]     France     2024-06-13
[ 194 ]  
 
Position and proposals regarding on the work on Recommendation ITU-R S.[MITIGATION MEASURES]     Mozambique , Nigeria , Papua New Guinea     2024-06-13
[ 193 ]  
 
Proposed draft reply liaison statement to Working Party 4C - Work related to WRC-27 agenda item 1.13     Germany   AI1.13   2024-06-13
[ 192 ]  
 
Reply-liaison statement to ITU-R Working Party 5D, on their recent publication - ITU-R Framework and overall objectives of the future development of IMT for 2030 and beyond     Director, BR     2024-06-13
[ 191 ]  
 
Further modifications to the working document of Document IMT-2030/1 "IMT-2030 background"     IAFI     2024-06-13
[ 190 ]  
 
Technical aspects of TDD technology for connectivity between space station and IMT user equipment for use in the proposed reply liaison statement to Working Party 4C regarding WRC-27 agenda item 1.13     IAFI   AI1.13   2024-06-13
Results:239 total items.
Result page:  1 - 2 - 3 - 4 - 5  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2024-06-25