|
Number |
Date
|
Source
|
Title
|
Questions
|
| |
Number |
Posted |
Size
|
|
|
| |
|
[ ADM 143 ]
|
2026-09-28 |
WP 5D
|
Schedule for the 53rd meeting of Working Party 5D - Geneva, 28 September - 8 October 2026
|
N/A
|
|
[ ADM 143 ] Revision 4 - English - Word |
2026-09-30 [17:34]
|
72'790 bytes |
|
| |
|
[ TD 626 ]
|
2026-09-30 |
SWG Specific Applications
|
Work plan for revision of Report ITU-R M.2528-0 - Capabilities of the terrestrial component of IMT-2020 for multimedia communications
|
N/A
|
|
[ TD 626 ] - English - Word |
2026-09-30 [16:59]
|
36'092 bytes |
|
| |
|
[ 1541 ]
|
2026-09-29 |
ITU-T SG13
|
Liaison statement on the questionnaire on the draft technical Report ITU-T YSTR.UC-CNB - Use cases of converged IMT-2020 and beyond networks, and broadcasting network technologies for developing countries
|
N/A
|
|
[ 1541 ] - English - Word |
2026-09-29 [12:19]
|
40'543 bytes |
|
| |
|
[ ADM 141 ]
|
2026-09-28 |
Chair, WP 5D
|
Draft agenda for the opening Plenary of the 53rd meeting of Working Party 5D - Monday, 28 September 2026, from 0900 to 1200 hours (Geneva time) (Room Popov, ITU Tower)
|
N/A
|
|
[ ADM 141 ] Revision 1 - English - Word |
2026-09-28 [12:47]
|
43'777 bytes |
|
| |
|
[ 1540 ]
|
2026-09-25 |
BR, Study Groups Department
|
Assignment of documents for Working Party 5D #53 (Documents 5D/1394 - 5D/1540)
|
N/A
|
|
[ 1540 ] Revision 1 - English - Word |
2026-09-28 [11:01]
|
86'217 bytes |
|
| |
|
[ ADM 145 ]
|
2026-09-28 |
Chair, WG Spectrum Aspects and WRC Preparations
|
Draft agenda for the 1st meeting of WG Spectrum Aspects and WRC Preparations - Monday, 28 September 2026, from 0900 to 1200 hours (Geneva time)
(as part of the opening Plenary) (Room Popov, ITU Tower)
|
N/A
|
|
[ ADM 145 ] - English - Word |
2026-09-28 [08:17]
|
56'328 bytes |
|
| |
|
[ ADM 142 ]
|
2026-09-28 |
WP 5D
|
Structure and Chairs of Plenary, Working Groups, Sub Working Groups and Drafting Groups for the
53rd meeting of Working Party 5D - Geneva, 28 September - 8 October 2026
|
N/A
|
|
[ ADM 142 ] - English - Word |
2026-09-28 [07:56]
|
48'048 bytes |
|
| |
|
[ ADM 144 ]
|
2026-09-28 |
Chair, WG General Aspects
|
Draft agenda of the 1st meeting of Working Group General Aspects - Monday, 28 September 2026 (following the opening Plenary of the
53rd meeting of Working Party 5D) (Room Popov, ITU Tower)
|
N/A
|
|
[ ADM 144 ] - English - Word |
2026-09-28 [08:14]
|
47'199 bytes |
|
| |
|
[ ADM 146 ]
|
2026-09-28 |
Chair, WG Technology Aspects
|
Draft agenda of the 1st meeting of Working Group Technology Aspects - Monday, 28 September 2026 (after Opening Plenary, from 0900 to 1200 hours) (Room Popov, ITU Tower)
|
N/A
|
|
[ ADM 146 ] - English - Word |
2026-09-28 [08:15]
|
39'749 bytes |
|
| |
|
[ INF 11 ]
|
2026-09-23 |
BR, Study Groups Department
|
Information for participants - Meetings of Working Party 5D #53 (Geneva, 28 September - 8 October 2026)
|
N/A
|
|
[ INF 11 ] - English - Word |
2026-09-23 [12:41]
|
5'182'099 bytes |
|
| |
|
[ 1539 ]
|
2026-09-22 |
CCT
|
Reply liaison statement on comments on the definitions of the terms "RIS controller", "RIS reflective surface", "RIS type 1-O" and "RIS type 2-O" developed by ITU-T Study Group 5
|
N/A
|
|
[ 1539 ] - English - Word |
2026-09-22 [14:53]
|
47'045 bytes |
|
| |
|
[ 1538 ]
|
2026-09-22 |
CCT
|
Reply liaison statement on comments on the definitions of the terms "deployment environment type (DET)" and "BS cell cluster" developed by ITU-T Study Group 5
|
N/A
|
|
[ 1538 ] - English - Word |
2026-09-22 [14:52]
|
48'060 bytes |
|
| |
|
[ 1458 ]
|
2026-09-15 |
China
|
Proposal on summary of sharing and compatibility studies between incumbent services/systems and IMT operating in the frequency band 14.8-15.35 GHz
|
AI1.7
|
|
[ 1458 ] - English - Word |
2026-09-15 [16:03]
|
143'635 bytes |
|
| |
|
[ 1500 ]
|
2026-09-16 |
Telia Company AB
|
Pfd levels required for protection of FWA CPE from DC-MSS-IMT
|
AI1.13
|
|
[ 1500 ] - English - Word |
2026-09-17 [09:03]
|
143'544 bytes |
|
| |
|
[ 1501 ]
|
2026-09-16 |
Nokia Corporation
, Telefon AB - LM Ericsson
|
Considerations on the polarisation loss and the reference bandwidth in the development of regulatory limits for the protection of terrestrial IMT networks from DC-MSS-IMT
|
AI1.13
|
|
[ 1501 ] - English - Word |
2026-09-17 [10:49]
|
781'358 bytes |
|
| |
|
[ 1527 ]
|
2026-09-16 |
Botswana
, Mozambique
, Namibia
, South Africa
|
Pfd limits for protection of terrestrial IMT UE
|
AI1.13
|
|
[ 1527 ] - English - Word |
2026-09-17 [16:38]
|
397'146 bytes |
|
| |
|
[ 1528 ]
|
2026-09-16 |
Botswana
, Mozambique
, Namibia
, South Africa
|
Protection of terrestrial IMT BS
|
AI1.13
|
|
[ 1528 ] - English - Word |
2026-09-18 [09:04]
|
454'660 bytes |
|
| |
|
[ 1530 ]
|
2026-09-16 |
Orange
|
Calculation and simulation of pfd limits for the protection of IMT terrestrial networks against interferences from DC-MSS-IMT satellites stations
|
AI1.13
|
|
[ 1530 ] - English - Word |
2026-09-18 [09:00]
|
698'531 bytes |
|
| |
|
[ 1534 ]
|
2026-09-16 |
France
|
Compatibility study between IMT in the frequency band 4 400-4 800 MHz and aeronautical radionavigation service operating in the frequency band 4 200-4 400 MHz
|
AI1.7
|
|
[ 1534 ] - English - Word |
2026-09-18 [14:57]
|
17'563'040 bytes |
|
| |
|
[ 1478 ]
|
2026-09-16 |
GSM Association
|
Pfd limits to protect IMT terminals
|
AI1.13
|
|
[ 1478 ] - English - Word |
2026-09-16 [11:54]
|
45'788 bytes |
|
| |
|
[ 1537 ]
|
2026-09-16 |
Orange
, Telefon AB - LM Ericsson
|
Regulatory measures for protection of IMT BS from DC-MSS-IMT
|
AI1.13
|
|
[ 1537 ] - English - Word |
2026-09-18 [11:59]
|
356'567 bytes |
|
| |
|
[ 1535 ]
|
2026-09-16 |
France
|
Summary of sharing and compatibility studies under WRC-27 agenda item 1.7 for the frequency band 7 125-8 400 MHz - Downlink of earth exploration satellite service and of fixed satellite service
|
AI1.7
|
|
[ 1535 ] - English - Word |
2026-09-18 [11:52]
|
143'100 bytes |
|
| |
|
[ 1533 ]
|
2026-09-16 |
France
|
Elements of a working document towards preliminary draft CPM text for WRC-27 agenda item 1.7
|
AI1.7
|
|
[ 1533 ] - English - Word |
2026-09-18 [11:41]
|
573'541 bytes |
|
| |
|
[ 1532 ]
|
2026-09-16 |
France
|
Proposed modifications to summary of sharing and compatibility studies under WRC-27 agenda item 1.7 for the frequency band 4 400-4 800 MHz
|
AI1.7
|
|
[ 1532 ] - English - Word |
2026-09-18 [11:27]
|
145'192 bytes |
|
| |
|
[ 1531 ]
|
2026-09-16 |
France
|
Proposed modifications to summary of sharing and compatibility studies under WRC-27 agenda item 1.7 for the frequency band 4 400-4 800 MHz
|
AI1.7
|
|
[ 1531 ] - English - Word |
2026-09-18 [08:47]
|
153'350 bytes |
|
| |
|
[ 1529 ]
|
2026-09-16 |
Nokia Corporation
, Qualcomm, Inc.
, Telefon AB - LM Ericsson
|
Updates to WRC-27 agenda item 1.7 summary of studies in the band 4 400-4 800 MHz
|
AI1.7
|
|
[ 1529 ] - English - Word |
2026-09-17 [16:47]
|
147'664 bytes |
|
| |
|
[ 1526 ]
|
2026-09-16 |
France
, Germany
, Italy
, Luxembourg
, Norway
, Spain
, Turkiye
|
Summary of sharing and compatibility studies under WRC-27 agenda item 1.7 for the frequency band 7 125-8 400 MHz - Earth exploration satellite service
|
AI1.7
|
|
[ 1526 ] - English - Word |
2026-09-17 [16:11]
|
145'477 bytes |
|
| |
|
[ 1525 ]
|
2026-09-16 |
Telefon AB - LM Ericsson
|
Update of study p in the working document on WRC-27 agenda item 1.13
|
AI1.13
|
|
[ 1525 ] - English - Word |
2026-09-17 [15:40]
|
2'938'143 bytes |
|
| |
|
[ 1524 ]
|
2026-09-16 |
European Organisation for the Exploitation of Meteorological Satellite
, European Space Agency (ESA)
|
Proposed modifications to Attachment 8 (MetSat vs IMT at 7 GHz)
|
AI1.7
|
|
[ 1524 ] - English - Word |
2026-09-17 [16:05]
|
36'203 bytes |
|
| |
|
[ 1523 ]
|
2026-09-16 |
Tonga
|
Working document on studies for the regulatory considerations to protect terrestrial IMT systems under WRC-27 agenda item 1.13
|
AI1.13
|
|
[ 1523 ] - English - Word |
2026-09-17 [15:26]
|
44'755 bytes |
|
| |
|
[ 1522 ]
|
2026-09-16 |
IAFI
|
Considerations to protect terrestrial IMT systems under WRC-27 agenda item 1.13
|
AI1.13
|
|
[ 1522 ] - English - Word |
2026-09-17 [15:54]
|
45'359 bytes |
|
| |
|
[ 1521 ]
|
2026-09-16 |
IAFI
|
Analysis of parameter assumptions across FSS/MSS (Earth-to-space) sharing studies for WRC-27 agenda item 1.7
|
AI1.7
|
|
[ 1521 ] - English - Word |
2026-09-17 [15:36]
|
544'615 bytes |
|
| |
|
[ 1520 ]
|
2026-09-16 |
IAFI
|
Proposed modifications to Recommendation ITU-R M.1036-8 - Frequency arrangements for implementation of the terrestrial component of International Mobile Telecommunications in the bands identified for IMT in the Radio Regulations
|
N/A
|
|
[ 1520 ] - English - Word |
2026-09-17 [14:58]
|
100'511 bytes |
|
| |
|
[ 1519 ]
|
2026-09-16 |
Nokia Corporation
, Qualcomm, Inc.
, Telefon AB - LM Ericsson
|
Updates to WRC-27 agenda item 1.7 summary of studies in the frequency band 7 125-8 400 MHz
|
AI1.7
|
|
[ 1519 ] - English - Word |
2026-09-17 [15:29]
|
157'154 bytes |
|
| |
|
[ 1518 ]
|
2026-09-16 |
Ministry of Digital Technologies of the Republic of Uzbekistan
|
Views of the communications administration of Uzbekistan on the working document towards a preliminary draft CPM text on WRC-27 agenda item 1.7
|
AI1.7
|
|
[ 1518 ] - English - Word |
2026-09-17 [14:47]
|
38'414 bytes |
|
| |
|
[ 1517 ]
|
2026-09-16 |
IAFI
, Wireless World Research Forum
|
Further updates to the working document towards a preliminary draft new Report ITU-R M.[IMT.ATG] - For non-safety air-ground communications (excluding UAS) using terrestrial IMT and other land mobile technologies
|
N/A
|
|
[ 1517 ] - English - Word |
2026-09-17 [15:04]
|
1'809'191 bytes |
|
| |
|
[ 1516 ]
|
2026-09-16 |
Indian Institute of Technology Madras
|
Text proposal for the working document towards a preliminary draft revision of Document IMT-2030/2 "Process"
|
N/A
|
|
[ 1516 ] - English - Word |
2026-09-17 [14:35]
|
180'642 bytes |
|
| |
|
[ 1515 ]
|
2026-09-16 |
Telecommunications Standards Development Society, India (TSDSI)
|
Working document towards a preliminary draft new Report ITU-R M.[IMT-FWA] - [Technical and operational aspects of providing broadband by fixed wireless access using IMT technology (IMT-FWA) in the frequency bands identified for IMT]
|
N/A
|
|
[ 1515 ] - English - Word |
2026-09-17 [14:34]
|
59'510 bytes |
|
| |
|
[ 1514 ]
|
2026-09-16 |
Telecommunications Standards Development Society, India (TSDSI)
|
Text proposal for the preliminary draft new Report ITU-R M.[IMT-2030.SUBMISSION] - Requirements, evaluation criteria and submission templates for the development of IMT-2030
|
N/A
|
|
[ 1514 ] - English - Word |
2026-09-17 [14:43]
|
188'925 bytes |
|
| |
|
[ 1513 ]
|
2026-09-16 |
Telecommunications Standards Development Society, India (TSDSI)
|
Working document towards a preliminary draft revision of document IMT-2030/2 "Process" - Submission, evaluation process and consensus building for IMT-2030
|
N/A
|
|
[ 1513 ] - English - Word |
2026-09-17 [12:45]
|
179'964 bytes |
|
| |
|
[ 1512 ]
|
2026-09-16 |
United States
|
Preliminary draft revision of Report ITU-R M.2480-1 - National approaches of some countries on the implementation of terrestrial IMT systems in bands identified for IMT
|
N/A
|
|
[ 1512 ] - English - Word |
2026-09-17 [11:55]
|
433'429 bytes |
|
| |
|
[ 1511 ]
|
2026-09-16 |
United States
|
Proposed edits for elements for future liaison statement from Working Party 5D to Working Party 4C on WRC-27 agenda item 1.13
|
AI1.13
|
|
[ 1511 ] Part 2 - English - Excel 2007 |
2026-09-17 [14:33]
|
80'236 bytes |
|
|
[ 1511 ] Part 1 - English - Excel 2007 |
2026-09-17 [14:32]
|
26'831 bytes |
|
|
[ 1511 ] - English - Word |
2026-09-17 [14:32]
|
161'139 bytes |
|
| |
|
[ 1510 ]
|
2026-09-16 |
United States
|
Information document on compatibility of IMT in the frequency band 4 400-4 800 MHz with aeronautical mobile telemetry in the band 4 400-4 940 MHz for WRC-27 agenda item 1.7
|
AI1.7
|
|
[ 1510 ] - English - Word |
2026-09-17 [11:41]
|
2'150'300 bytes |
|
| |
|
[ 1509 ]
|
2026-09-16 |
United States
|
Summary of sharing and compatibility studies under WRC-27 agenda item 1.7 for the frequency band 14.8-15.35 GHz
|
AI1.7
|
|
[ 1509 ] - English - Word |
2026-09-17 [11:41]
|
38'526 bytes |
|
| |
|
[ 1508 ]
|
2026-09-16 |
United States
|
Summary of sharing and compatibility studies under WRC-27 agenda item 1.7 for the frequency band 7 125-8 400 MHz
|
AI1.7
|
|
[ 1508 ] - English - Word |
2026-09-17 [11:38]
|
32'986 bytes |
|
| |
|
[ 1507 ]
|
2026-09-16 |
United States
|
Summary of sharing and compatibility studies under WRC-27 agenda item 1.7 for the frequency band 4 400-4 800 MHz
|
AI1.7
|
|
[ 1507 ] - English - Word |
2026-09-17 [13:57]
|
155'261 bytes |
|
| |
|
[ 1506 ]
|
2026-09-16 |
United States
|
Draft CPM text for WRC-27 agenda item 1.7
|
AI1.7
|
|
[ 1506 ] - English - Word |
2026-09-17 [11:05]
|
195'874 bytes |
|
Results: 49 total items.
|
Multiple Document Download: Formats and Languages to be included (when available):