|
Number |
Date
|
Source
|
Title
|
| |
Number |
Posted |
Size
|
|
| |
|
[ 96 ]
|
2025-11-19 |
Saudi Arabia
, Algeria
, Bahrain
, Jordan
, Tunisia
|
Proposed elements to Study Group 5 Report to the 33rd rag meeting on challenges, overlaps, or opportunities for improvement in current Study Group 5 scope of work
|
|
[ 96 ] - English - Word |
2025-11-20 [10:30]
|
249'035 bytes |
|
| |
|
[ 94 ]
|
2025-11-19 |
ITU-T SG15
|
Reply liaison statement on the latest updates of Access Network Transport (ANT) and Home Network Transport (HNT) standards overviews and work plans
|
|
[ 94 ] - English - Word |
2025-11-19 [15:56]
|
36'221 bytes |
|
| |
|
[ 95 ]
|
2025-11-19 |
ITU-T SG 15
|
Liaison statement on the latest updates of Access Network Transport (ANT) and Home Network Transport (HNT) standards overviews and work plans
|
|
[ 95 ] - English - Word |
2025-11-19 [15:43]
|
35'789 bytes |
|
| |
|
[ 93 ]
|
2025-11-17 |
Chair, WP 5D
|
Executive Report from Working Party 5D
|
|
[ 93 ] - English - Word |
2025-11-18 [08:35]
|
271'239 bytes |
|
| |
|
[ INF 4 ]
|
2025-11-14 |
BR, Study Groups Department
|
Information for participants - Meetings of Working Parties 5A, 5B and 5C and Study Group 5 (Geneva, 17 November - 2 December 2025)
|
|
[ INF 4 ] Part 1 - English - PowerPoint 2007 |
2025-11-14 [16:39]
|
4'254'429 bytes |
|
|
[ INF 4 ] - English - Word |
2025-11-14 [16:39]
|
5'189'096 bytes |
|
| |
|
[ 92 ]
|
2025-11-14 |
Chair, WP 5A
|
Report on the activities of the consultation process
|
|
[ 92 ] - English - Word |
2025-11-14 [10:27]
|
36'359 bytes |
|
| |
|
[ 91 ]
|
2025-11-14 |
ITU-R SG 4
|
Reply liaison statement to ITU-T Study Group 17 (copy to ITU-R Study Group 5 for information) - Update to security contacts and information on security-related Recommendations or other texts under development
|
|
[ 91 ] - English - Word |
2025-11-14 [10:10]
|
50'908 bytes |
|
| |
|
[ 90 ]
|
2025-11-13 |
ITU-T SG5
|
Liaison statement on proposed draft new ITU-T Recommendation on guidance for assessing the environmental impact of radio spectrum utilization
|
|
[ 90 ] - English - Word |
2025-11-13 [11:31]
|
372'566 bytes |
|
| |
|
[ 89 ]
|
2025-10-21 |
WP 5D
|
Draft new Report ITU-R M.[SRS-IMT] - Coordination between space research service (deep space) stations operating in the band 7 145-7 190 MHz and IMT stations operating in the band 6 425-7 125 MHz
|
|
[ 89 ] - English - Word |
2025-10-21 [10:28]
|
12'029'388 bytes |
|
| |
|
[ 88 ]
|
2025-10-21 |
WP 5D
|
Draft new Report ITU-R M.[FS-IMT COORDINATION] - Guidance for national and bilateral coordination of stations in the fixed service with IMT stations in the frequency band 6 425-7 125 MHz
|
|
[ 88 ] - English - Word |
2025-10-21 [09:30]
|
5'023'699 bytes |
|
| |
|
[ 87 ]
|
2025-10-21 |
WP 5D
|
Draft new Report ITU-R M.[IMT-TROPO DUCT MITIGATION] - Mitigation of interference due to tropospheric ducting effect within an IMT network
|
|
[ 87 ] - English - Word |
2025-10-21 [11:27]
|
586'527 bytes |
|
| |
|
[ 86 ]
|
2025-10-21 |
WP 5D
|
Draft new Recommendation ITU-R M.[IMT-2020.UNWANT.MS] - Unwanted emission characteristics of mobile stations using the terrestrial radio interface of IMT-2020
|
|
[ 86 ] - English - Word |
2025-10-27 [13:50]
|
5'648'014 bytes |
|
| |
|
[ 85 ]
|
2025-10-21 |
WP 5D
|
Draft new Recommendation ITU-R M.[IMT-2020.UNWANT.BS] - Unwanted emission characteristics of base stations using the terrestrial radio interface of IMT-2020
|
|
[ 85 ] - English - Word |
2025-10-22 [09:07]
|
600'951 bytes |
|
| |
|
[ 84 ]
|
2025-10-21 |
WP 5D
|
Draft revision of Recommendation ITU-R M.2150-2 - Detailed specifications of the terrestrial radio interfaces of International Mobile Telecommunications-2020 (IMT-2020)
|
|
[ 84 ] - English - Word |
2025-10-22 [16:45]
|
8'074'983 bytes |
|
| |
|
[ 83 ]
|
2025-10-21 |
WP 5D
|
Draft revision of Recommendation ITU-R M.2012-6 - Detailed specifications of the terrestrial radio interfaces of International Mobile Telecommunications-Advanced (IMT-Advanced)
|
|
[ 83 ] - English - Word |
2025-10-22 [09:15]
|
2'411'674 bytes |
|
| |
|
[ 82 ]
|
2025-10-14 |
Chair, SG 5
|
Note to the Chair ITU-T Study Group 17 copy to ITU-R Study Groups 4, 5 and ITU-D Study Group 2 - Update of the security contact and information on security-related Recommendations or other documents
|
|
[ 82 ] - English - Word |
2025-10-14 [16:07]
|
53'475 bytes |
|
| |
|
[ INF 3 ]
|
2025-10-07 |
BR, Study Groups Department
|
Guidelines on the management of fully virtual meetings and physical meetings with remote participation
|
|
[ INF 3 ] - English - Word |
2025-10-07 [08:12]
|
43'630 bytes |
|
| |
|
[ 81 ]
|
2025-09-12 |
Chair, SG 5
|
Note to the Chair of ITU-R Working Parties 5A, 5B, 5C and 5D copy to ITU-R Study Group 5 - Consideration of received liaison statement from TSAG on the activities and studies on sustainable digital transformation
|
|
[ 81 ] - English - Word |
2025-09-12 [10:02]
|
31'953 bytes |
|
| |
|
[ 80 ]
|
2025-09-11 |
ITU-T SG2
|
Liaison statement on the consent of draft new Recommendation ITU-T M.3393 (M.rsmca) - Requirements for smart maintenance of cell antenna
|
|
[ 80 ] - English - Word |
2025-10-03 [15:33]
|
1'114'568 bytes |
|
|
[ 80 ] Part 1 - English - Word |
2025-09-11 [09:31]
|
2'020'064 bytes |
|
Results: 21 total items.
|
Multiple Document Download: Formats and Languages to be included (when available):