Contributions  |
|
Number
|
Title
|
Source
|
Date
|
|
[ 77 ]
|
Liaison statement on request to update security contacts and to provide information on security-related recommendations or other texts under development
|
ITU-T SG17
|
2025-05-29 |
|
[ 76 ]
|
Draft new Recommendation ITU-R F.[W-BAND] - Radio-frequency channel and block arrangements for fixed service systems operating in the 92-94 GHz, 94.1-100 GHz, 102-109.5 GHz and 111.8 114.25 GHz ranges
|
WP 5C
|
2025-05-28 |
|
[ 75 ]
|
Draft new Recommendation ITU-R F.[D-BAND] - Radio-frequency channel and block arrangements for fixed service systems operating in the 130-134 GHz, 141-148.5 GHz, 151.5-164 GHz and 167-174.8 GHz ranges
|
WP 5C
|
2025-05-28 |
|
[ 74 ]
|
Draft revision to Recommendation ITU-R F.699-8 - Reference radiation patterns for fixed wireless system antennas for use in coordination studies and interference assessment in the frequency range from 100 MHz to 86 GHz
|
WP 5C
|
2025-05-28 |
|
[ 73 ]
|
Draft revision to Recommendation ITU-R F.1762 - Characteristics of enhanced applications for high frequency (HF) radiocommunication systems
|
WP 5C
|
2025-05-28 |
|
[ 72 ]
|
Draft revision of Recommendation ITU-R F.1821 - Characteristics of advanced digital high frequency (HF) radiocommunication systems
|
WP 5C
|
2025-05-28 |
|
[ 71 ]
|
Draft new Report ITU-R F.[EESS-PROTECTION] - Studies on unwanted emission levels outside the allocated bands for FS systems operating in frequency bands from 94.1 GHz to 174.8 GHz for the protection of EESS (passive) operating in adjacent bands where footnote RR No. 5.340 applies
|
WP 5C
|
2025-05-28 |
|
[ 70 ]
|
Draft revision of Question ITU-R 37-6/5 - Digital land mobile systems for specific applications
|
WP 5A
|
2025-05-28 |
|
[ 69 ]
|
Draft new Recommendation ITU-R M.[RSTT_FRQ] - Harmonization of spectrum for existing and future Railway radiocommunication Systems between Train and Trackside (RSTT) within the frequency bands allocated to the mobile service
|
WP 5A
|
2025-05-28 |
|
[ 68 ]
|
Draft revision of Recommendation ITU-R F.1763-1 - Radio interface standards for broadband wireless access systems in the fixed service operating below 66 GHz
|
WP 5A
|
2025-05-28 |
|
[ 67 ]
|
Draft revision of Recommendation ITU-R M.1801-2 - Radio interface standards for broadband wireless access systems, including mobile and nomadic applications, in the mobile service operating below 6 GHz
|
WP 5A
|
2025-05-28 |
|
[ 66 ]
|
Draft revision of Recommendation ITU-R M.1450-5 - Characteristics of broadband radio local area networks
|
WP 5A
|
2025-05-28 |
|
[ 65 ]
|
Additional information on the summary of conclusions of the 32nd meeting of the Radiocommunication Advisory Group for the attention of all ITU-R Study Groups and Working Parties
|
Director, BR
|
2025-05-23 |
|
[ 64 ]
|
Liaison statement to ITU-T Study Group 15 Question 6/15 (Copy to ITU-R Working Parties 1A, 3J, 3M and Study Group 5) - Free-space optics systems related aspects for G.fso
|
WP 5C
|
2025-05-22 |
|
[ 63 ]
|
Reply liaison statement to Working Parties 4B, 4C and 5A (copy for information to Study Groups 1, 5 and 7)
|
WP 4A
|
2025-05-20 |
|
[ 62 ]
(Rev.1) |
Liaison statement on free-space optics systems related aspects for G.fso
|
ITU-T SG15
|
2025-04-11 |
|
[ 61 ]
|
Draft revision of Recommendation ITU-R M.1036-7 - Frequency arrangements for implementation of the terrestrial component of International Mobile Telecommunications in the bands identified for IMT in the Radio Regulations
|
WP 5D
|
2025-02-20 |
|
[ 60 ]
|
Liaison statement to key SDOs on the publication of GR THz 003 and GR THz 004
|
ETSI ISG THz
|
2025-01-23 |
|
[ 59 ]
|
Summary record of the twenty second meeting of Study Group 5 (Geneva, 2-3 December 2024)
|
Chair, SG 5
|
2024-12-03 |
|
[ 58 ]
|
Final list of participants Study Group 5 (Geneva, 2-3 December 2024)
|
Director, BR
|
2024-12-03 |
|
[ 57 ]
|
List of documents issued (Documents 5/26 - 5/57)
|
BR, Study Groups Department
|
2024-12-02 |
|
[ 56 ]
(Rev.1) |
Executive Report from Working Party 5C
|
Acting Chair, WP 5C
|
2024-11-29 |
|
[ 55 ]
(Rev.1) |
Executive Report from Working Party 5B
|
Acting Chair, WP 5B
|
2024-11-29 |
|
[ 54 ]
(Rev.1) |
Executive Report from Working Party 5A
|
Acting Chair, WP 5A
|
2024-11-29 |
|
[ 53 ]
(Rev.1) |
Draft revision of Recommendation ITU-R M.1041-2 - Future amateur radio systems
|
WP 5A
|
2024-11-29 |
|
[ 52 ]
|
Draft revision of Report ITU-R M.2442-0 - Current and future usage of railway radiocommunication systems between train and trackside
|
WP 5A
|
2024-11-29 |
|
[ 51 ]
|
Draft new Report ITU-R M.[LMS.BANDWIDTH.275-450GHZ] - Bandwidth considerations for land mobile service applications in the frequency range 275-450 GHz
|
WP 5A
|
2024-11-29 |
|
[ 50 ]
|
Structure and activities of Study Group 5
|
Canada
|
2024-11-20 |
|
[ 49 ]
|
Executive Report from Working Party 5D
|
Acting Chair, WP 5D
|
2024-11-14 |
|
[ 48 ]
|
Study Group 5 Vice-Chair function
|
Chair, SG 5
|
2024-11-12 |
|
[ 47 ]
|
Structure of Study Group 5, Terms of Reference of the Working Parties, and approval of revision to Recommendation ITU-R M.1036-7
|
Brazil
|
2024-11-09 |
|
[ 46 ]
|
Proposal with regard to the Annex 2 of Document 5/26 - Structure of ITU-R Study Group 5
|
Russian Federation
|
2024-11-05 |
|
[ 45 ]
(Rev.2) |
Draft new Recommendation ITU-R M.[IMT-2020.UNWANT.MS] - Unwanted emission characteristics of mobile stations using the terrestrial radio interface of IMT-2020
|
WP 5D
|
2024-10-29 |
|
[ 44 ]
(Rev.3) |
Draft new Recommendation ITU-R M.[IMT-2020.UNWANT.BS] - Unwanted emission characteristics of base stations using the terrestrial radio interface of IMT-2020
|
WP 5D
|
2024-10-29 |
|
[ 43 ]
|
Reply liaison statement to Working Party 4A (copied for information to Study Groups 4, 5 and 7) - Activities in response to Resolution 219 (Bucharest, 2022) and Resolution ITU-R 74 (RA-23)
|
WP 7B
|
2024-10-09 |
|
[ 42 ]
|
Liaison statement on the establishment of the Working Group 2 on vehicular communications for advanced emergency braking, including to protect VRUs
|
CITS
EG-ComAD
|
2024-09-18 |
|
[ 41 ]
|
Liaison statement on the new version of the home network transport (HNT) standards overview and work plan
|
ITU-T SG15
|
2024-07-19 |
|
[ 40 ]
|
Liaison statement on the new version of the access network transport (ANT) standards overview and work plan
|
ITU-T SG15
|
2024-07-19 |
|
[ 39 ]
|
Information on the preparation of texts for the draft CPM Report to WRC-27
|
Chair, CPM-27
|
2024-07-09 |
|
[ 38 ]
|
Draft revision of Recommendation ITU-R M.1036-7 - Frequency arrangements for implementation of the terrestrial component of International Mobile Telecommunications in the bands identified for IMT in the Radio Regulations
|
WP 5D
|
2024-07-05 |
|
[ 37 ]
|
Liaison statement on overview of work of FG-AI4A
|
FG-AI4A
|
2024-07-03 |
|
[ 36 ]
|
Liaison statement on completion of FG-AI4A deliverables
|
FG-AI4A
|
2024-07-03 |
|
[ 35 ]
|
Liaison statement on results of the seventh and final meeting of the FG-MV
|
ITU-T FG-MV
|
2024-06-24 |
|
[ 34 ]
|
Liaison statement on the establishment of the working group on requirements for merging automatically into congested lanes
|
CITS EG-ComAD
|
2024-06-10 |
|
[ 33 ]
(Rev.1) |
Draft revision of Report ITU-R F.2416-0 - Technical and operational characteristics and applications of the point-to-point fixed service applications operating in the frequency band 275-450 GHz
|
WP 5C
|
|
|
[ 32 ]
(Rev.1) |
Draft revision of Recommendation ITU-R F.758-7 - System parameters and considerations in the development of criteria for sharing or compatibility between digital fixed wireless systems in the fixed service and systems in other services and other sources of interference
|
WP 5C
|
2024-05-29 |
|
[ 31 ]
|
Draft new Report ITU-R M.[NON-SAFETY AM(OR)S CHARACTERISTICS AND SHARING STUDIES]
|
WP 5B
|
2024-05-23 |
|
[ 30 ]
|
Draft new Question ITU-R [DIGITAL VOICE]/5 - Introduction of Digital Voice Communications in the VHF maritime frequency channels
|
WP 5B
|
2024-05-23 |
|
[ 29 ]
|
Reply liaison statement on the consent of draft Recommendation ITU-T Q.5032 (ex. Q.NCRP) - Network coding protocol for network repeaters
|
ITU-T SG11
|
2024-05-22 |
|
[ 28 ]
|
Note from Working Party 5B to Study Group 5
|
WP 5B
|
2024-05-20 |
Results:77 total items. Result page:
1 -
2
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):