Page 75 - U4SSC KPIs Verification Manual - A guide for verifiers
P. 75

Dimension          Economy
              Sub-Dimension      Infrastructure

              Category           Electricity Supply
              KPI Name           Electricity System Outage Frequency
              KPI No.            EC: I: ES: 1C    Type:          Core           Type:          Structural

              Definition /       Average number of electrical interruptions per customer per year
              Description

              Rationale /        The reliability of the electricity network is vital for long-term economic sustainability
              Interpretation /   of a city.
              Benchmarking
                                 System  Average Interruption Frequency Index (SAIFI) is used as a standard
                                 reliability indicator by electric power utilities globally. SAIFI is the average number
                                 of interruptions that a customer would experience over a specific time period, and
                                 is calculated as:





                                 λ is the failure rate
                                  i
                                 N is the number of customers
                                  i
                                 Data should be reported for a 12-month period.
              Methodology        Calculate as:
                                 Numerator: Sum of customer interruptions.
                                 Denominator: Total number of customers served.

              Unit               Number
              Data Sources       NOTE – Data can be provided by the local electrical utility.
              / Relevant         IEEE Standard 1366-1998. Retrieved from <https:// www .ieee .org/ standards/ index
              Databases
                                 .html>
              SDG Reference(s)   SDG Target 7.1: By 2030, ensure universal access to affordable, reliable and modern
                                 energy services.
             Verification       Check data source – should be from electrical utility.
             Guidance
























                                                                    U4SSC KPIs Verification Manual-A guide for verifiers  65
   70   71   72   73   74   75   76   77   78   79   80