Page 24 - U4SSC Compendium of survey results on integrated digital solutions for city platforms around the world
P. 24
• Component 6: Weather stations network
Deployment of meteorological stations, which help in the detection of alerts and prevention
of emergencies on the island, related mainly to the risk of fires.
• Component 7: Fire-prevention software
Software for determining the fire risk index, based on meteorological parameters and factors
which help to prevent them.
• Component 8: Management of water tanks for fire control
Sensorization of water tanks on the island, which provides information on the filling status of
the tanks for use in emergency situations due to fires.
• Component 9: Volcanic surveillance network
Deployment of volcanological stations of different types to get information about volcanic and
seismological activity on the island and to assess risks of this nature.
• Component 10: Integrated tunnel management (communication coverage improvement, SOS
poles, video cameras and information panels)
Improvement of communications and security equipment and surveillance of tunnels on the
island for the prevention, or action in emergencies.
• Component 11: Infrastructure improvement of wireless networks (TETRA and Transport Network)
(TETRA stations and radio links)
Improvement and expansion of the TETRA radio network for security and emergencies on the
island.
• Component 12: TETRA equipment for fleets (mobile and portable terminals)
• Component 13: Improvement of the network of access points: wind/EOLIC generator and
webcams
Deployment of webcams in the main tourist spots the island allow visual verification of their
status (e.g., meteorology, occupation).
• Component 14: Infrastructure improvement of telecommunication sites (security cameras)
• Component 15: Fibre-optic link (CECOPIN – CABILDO main building) (≈600 m)
Improvement of the internal network of the Cabildo for the transmission of information between
the central infrastructure and the headquarters of the Insular Incident Coordination Centre
(CECOPIN).
• Component 16: Videowalls in the insular coordination centre
• Component 17: Central infrastructure (CPD) (rack, servers, switches, cabinet, NVR recorder) to
house the smart platform, databases and software associated with all components.
• Component 18: Open-data Portal
12 Compendium of survey results on integrated digital solutions for city platforms around the world