Page 136 - Kaleidoscope Academic Conference Proceedings 2020
P. 136
2020 ITU Kaleidoscope Academic Conference
machines. This additional data can then also be visualized twin: Directions for future research. Automation in
and analyzed in the process platform and used to derive Construction, 114:103179, 2020.
further insights for improving construction processes, as well
[7] Roy Woodhead, Paul Stephenson, and Denise Morrey.
as machines.
Digital construction: From point solutions to iot
In addition, we plan to integrate the digital process platform
ecosystem. Automation in Construction, 93:35–46,
into a reference construction site that will mainly be used to
2018.
test innovative road construction technologies and automation
solutions in a realistic construction environment. Through the
[8] Tobias Gädeke, Frank Hartmann, Lukasz Niestoruk,
application and testing of real-world construction scenarios
Markus Reinhardt, and Wilhelm Stork. Real-time
with different construction machines, we plan to further
environmental emission monitoring on construction
evaluate our proposed digital process platform. Depending on
sites. In J. J. Soraghan, editor, 2014 6th
future construction scenarios, new use cases will be integrated
European Embedded Design in Education and Research
and realized within our platform, e.g. the usage of 5G mobile
Conference (EDERC), pages 292–296, Piscataway, NJ,
communication technology for an automated construction
2014. IEEE.
machine control.
[9] Chiu-Ming Lee, Wei-Liang Kuo, Tzu-Jan Tung, Bo-Kai
ACKNOWLEDGEMENTS Huang, Shu-Hsiang Hsu, and Shang-Hsien Hsieh.
Government open data and sensing data integration
The authors would like to thank the European Regional framework for smart construction site management.
Development Fund (ERDF) and the federal state of In Mohamed Al-Hussein, editor, Proceedings of the
North-Rhine Westphalia (NRW) in Germany for the 36th International Symposium on Automation and
funding of the project FutureSite under the project code Robotics in Construction (ISARC), Proceedings of the
EFRE-0500050. International Symposium on Automation and Robotics
in Construction (IAARC). International Association for
REFERENCES Automation and Robotics in Construction (IAARC),
2019.
[1] Bundesministerium für Wirtschaft und
Energie. Schlaglichter der wirtschaftspolitik [10] Clyde Zhengdao Li, Fan Xue, Xiao Li, Jingke
– monatsbericht oktober 2017, 2017. Hong, and Geoffrey Qiping Shen. An internet
Available : https://www.bmwi.de/Redaktion/DE/ of things-enabled bim platform for on-site assembly
Downloads/Monatsbericht/Monatsbericht-Themen/ services in prefabricated construction. Automation in
2017-10-4-produktivitaet-in-deutschland.pdf?__blob= Construction, 89:146–161, 2018.
publicationFile&v=6, Last access: 18.06.2020.
[11] Ming Zhao, Arun Kumar, Tapani Ristaniemi, and Peter
[2] Rajat Agarwal, Mukund Sridhar, and Shankar Han Joo Chong. Machine-to-machine communication
Chandrasekaran. Imagining construction’s digital future and research challenges: A survey. Wireless Personal
| mckinsey, 2016. Available : https://www.mckinsey. Communications, 97(3):3569–3585, 2017.
com/industries/capital-projects-and-infrastructure/
our-insights/imagining-constructions-digital-future, [12] Jianyu Zhao, Jinyue Zhang, and Olli Seppänen.
Last access: 21.06.2020. Real-time tracking for intelligent construction site
platform in finland and china: Implementation, data
[3] Kai-Stefan Schober, Philipp Hoff, and Konstantin analysis and use cases. ISARC Proceedings, pages
Sold. Digitization in the construction industry, 62–68, 2019.
2016. Available : https://www.rolandberger.
com/publications/publication_pdf/tab_digitization_ [13] Alice Schweigkofler, Gabriele Pasetti Monizza,
construction_industry_e_final.pdf, Last access: Erdal Domi, Andrei Popescu, Julia Ratajczak,
21.06.2020. Carmen Marcher, Michael Riedl, and Dominik Matt.
Development of a digital platform based on the
[4] Raihan Maskuriy, Ali Selamat, Kherun Nita Ali, Petra
integration of augmented reality and bim for the
Maresova, and Ondrej Krejcar. Industry 4.0 for
management of information in construction processes.
the construction industry—how ready is the industry?
In Paolo Chiabert, Abdelaziz Bouras, Frédéric Noël,
Applied Sciences, 9(14):2819, 2019.
and José Ríos, editors, Product Lifecycle Management
[5] Kai Ding, He Shi, Jizhuang Hui, Yongjian Liu, Bin to Support Industry 4.0, volume 540 of IFIP Advances
Zhu, Fuqiang Zhang, and Wei Cao. Smart steel bridge in Information and Communication Technology, pages
construction enabled by bim and internet of things in 46–55. Springer International Publishing, Cham, 2018.
industry 4.0: A framework. In ICNSC 2018, pages 1–5,
[14] Robin Kuenzel, Marcus Mueller, Jochen Teizer,
Piscataway, NJ, 2018. IEEE.
and Alexander Blickle. Smartsite: Intelligent and
[6] Calin Boje, Annie Guerriero, Sylvain Kubicki, and autonomous environments, machinery, and processes
Yacine Rezgui. Towards a semantic construction digital to realize smart road construction projects. ISARC
Proceedings, pages 1–9, 2015.
– 78 –