Page 156 - ITU-T Focus Group IMT-2020 Deliverables
P. 156

3                                        ITU-T Focus Group IMT-2020 Deliverables



            7.2     The review of the gaps described in Phase 1 Report and usecases

            7.2.1      Review of the gaps described in Phase 1 Report and required functionalities on the Virtual
                       Resource interface.
            In the FG-IMT-2020 Phase 1 report [Ref.7.1-1], 21 gaps are pointed out. In these gaps, some of them are
            discussed in SG15 or other SDOs. In the Network Softwarization working group in the FG-IMT-2020, 11gaps
            should be discussed (That is agreed in the Seoul meeting on March 2016).
            In  this  subsection,  the  relation  between  the  gaps  described  in  the  Phase  1  report  [Ref.7.1-1]  and
            functionalities controlled by the information(s) are reviewed. Then, it is clarified whether the gaps can be
            resolved by the set of the described functionalities or not. The detailed descriptions are described as follows.

            7.2.1.1    Large capacity transmission (D.7.1-1)
            In the IMT2020 network, large capacity virtual link with the some order made functionalities are required.
            Therefore, to establish the large capacity transmission, the information(s) at the reference points should be
            able to include the section of the virtual link, bandwidth, signal format and some optional indexes. Section
            7.1 with Table 7.1-1 describes to include these functions.

            7.2.1.2    Power saving by sleep or rate control (D.7.4)
            For power saving by sleep or rate control, power consumption mode should be ordered from Network &
            Service Orchestrator to Control Functions. The following information(s) can be used for power saving such as
            service class, bandwidth and signal quality. Addition to them, the mechanism can be used for the more useful
            or detailed power saving which is described in the previous subsection. These information(s) will be ordered
            from network & Service Orchestrator to Physical Resource Controller Functions as described in Section 7.1
            with Table 7.1-1.

            7.2.1.3    PON as a virtual digital wireline service (D.7.5-1)
            When PON would like to be used for the system to provide the virtual digital wireline (VDW) service, the
            section for VDW, bandwidth, and signal format should be mandatory ordered. The reliability or the other
            options are also used.

            To establish slice for virtual digital wireline service using PON, the parameter of service classes such as pseud
            wire, VBR, ABR are required to share the virtual resource with other transport link. These information(s) will
            be ordered from network & Service Orchestrator to Physical Resource Controller Functions as described in
            Section 7.1 with Table 7.1-1.

            7.2.1.4    Reliability and resiliency (D.7.6)
            To provide the slices with reliability or resiliency, the reliability mode should be ordered from network &
            Service Orchestrator to Control Functions. In the document [Ref.7.1-4] describes the functions that can be
            associated to an connection, such as protection switching is referenced as secondary entities through the
            associated LTP (Logical Termination Point) instance in Section 4.6 of [Ref.7.1-4].

            7.2.1.5    Diversified types of terminals (D.7.7-1)
            In the IMT-2020 network, deferent slices will be able to be prepared for the different types of terminals. Each
            slice  will  have  the  suitable  virtual  link  with  the  suitable  sections,  bandwidth  and  signal  format.  These
            information(s) will be ordered from Orchestrator to Physical Resource Controller as described in Section 7.1
            with Table 7.1-1.















            150
   151   152   153   154   155   156   157   158   159   160   161