Page 146 - ITU-T Focus Group IMT-2020 Deliverables
P. 146

3                                        ITU-T Focus Group IMT-2020 Deliverables















































                        Figure 6.4.7-2 – An example of interfaces and network architecture for resource
                                  management in a multi-operator heterogeneous network


            5G3ALT intends to provide a solution that considers the QoS requirements of each application and responses
            accordingly.  To  be  more  specific,  during  the  long-term  control  phase,  BSs  and/or  APs  are  to  be
            selected/associated  considering  the  particular  requirements  of  each  service,  such  as  data  rate,  latency,
            mobility, or reliability. The idea that the operators run heterogeneous networks in general, complicates this
            issue. Network capabilities need to be shared among operators to some extent. Also, the requirements of
            the requested service should be considered. Various interfaces are needed to convey these requirements as
            well as networks’ capabilities and availabilities. A general example is shown in Figure 6.4.7-2.

            The goal of 5G3ALT can be summarized in two parts. The first part is to design the architecture and required
            interfaces to convey necessary information for management. The flow of the necessary control protocol is
            also developed in this part. The second part is to design the management algorithm that makes the long-
            term/short-term control decisions according to service requirements and networks’ capabilities.
            6.4.7.4    Related key issues in 3GPP standardization

            5G3ALT  project  follows  the  trend  in  3GPP  standardization  and  aligns  its  developed  system  to  standard
            specifications while actively participating in standardization process. Following the study item FS_SMARTER
            in 3GPP [Ref. 6.4.7-4], the work item (WI) “New Study on Architecture and Security for Next Generation
            System” has been approved in 3GPP TSG SA#71 (March 2016) [Ref. 6.4.7-5]. This WI consists of two work
            items:  FS_NextGen  (SA2)  and  FS_NSA  (SA3).  FS_NextGen  (SA2)  impacts  the  technical  report  TR  23.799
            [Ref. 6.4.7-6]. This technical report lists a number of key issues and several solutions for each issue. Among
            these key issues 5G3ALT project is mainly concerned with the followings:







            140
   141   142   143   144   145   146   147   148   149   150   151