Page 796 - Shaping smarter and more sustainable cities - Striving for sustainable development goals
P. 796

6.2.6   Physical infrastructure

            This clause lists the core indicators defined for the physical infrastructure.
            There  are  13  indicators  in  this  dimension,  covering  the  infrastructures  including  piped  water,
            sewage, electricity, road infrastructure and building.


                 Sub‐dimension                 Indicator                           Description

             D6.1 Infrastructure/   I6.1.1 Water supply system       Proportion of the water supply systems
             connection to         management using ICT              under automatic monitoring using ICT so
             services – piped                                        as to ensure water quality and reduce
             water                                                   leakage.
                                   I6.1.2 City fresh water sources   Proportion of the city fresh water sources
                                   monitored using ICT               monitored using ICT with respect to
                                                                     availability.
                                   I6.1.3 Availability of smart water   Proportion of the water consumers
                                   meters                            (including households, companies, etc.)
                                                                     with ICT based water meters.
             D6.2 Infrastructure/   I6.2.1 Sewage system management  Proportion of the sewage system
             connection to         using ICT                         monitored using ICT
             services ‐ sewage                                       NOTE – Monitoring includes both
                                                                     inspection and controlling.

                                   I6.2.2 Drainage system            Proportion of the drainage systems
                                   management using ICT              monitored in real‐time using ICT.
                                                                     NOTE – Monitoring includes both
                                                                     inspection and controlling.
             D6.3 Infrastructure/   I6.3.1 Availability of smart     Proportion of the electricity consumers
             connection to         electricity meters                (including households, companies, etc.)
             services – electricity                                  with ICT based electricity meters.

             D6.8 Infrastructure/   I6.8.1 Availability of traffic   Proportion of streets with traffic
             connection to         monitoring using ICT              monitoring using ICT (e.g., using sensors to
             services – road                                         produce traffic volume maps etc.)
             infrastructure
                                   I6.8.2 Availability of parking    Proportion of parking lots and street
                                   guidance systems                  parking spaces with ICT based parking
                                                                     guidance systems.
                                   I6.8.3 Availability of real‐time   Proportion of public transport stops and
                                   traffic information               stations with real‐time traffic information
                                                                     available (via electronic bus bulletin
                                                                     boards, smartphone apps etc.)
                                                                     NOTE – Public transportation includes e.g.,
                                                                     metro, bus, tram, train and ferry.
                                   I6.8.4 Street lighting management   Proportion of street lamps under
                                   using ICT                         automatic management using ICT (e.g.,
                                                                     light/sound control and solar power
                                                                     charging).
                                                                     NOTE – Management covers both
                                                                     inspection and regulation.




            786                                                      ITU‐T's Technical Reports and Specifications
   791   792   793   794   795   796   797   798   799   800   801