|
Format |
Taille |
Mise à disposition |
|
|
|
English |
Word
|
63201 octets |
2025-05-27 |
[206] Annex 4- Detailed work plans for individual deliverables |
|
Word
|
48668 octets |
2025-06-05 |
[206] Annex 3- Meeting Report of Working Gourp 5C-3 - General aspects and HF-systems |
|
Word
|
48326 octets |
2025-05-27 |
[206] Annex 3.1- Working document towards ITU Handbook on fixed wireless systems |
|
Word
|
37961 octets |
2025-05-27 |
[206] Annex 3.2- Scope of ITU Handbook on fixed wireless systems |
|
Word
|
41769 octets |
2025-05-27 |
[206] Annex 3.3- Program for Working Party 5C Workshop on fixed wireless systems |
|
Word
|
38453 octets |
2025-05-27 |
[206] Annex 3.4- Terms of Reference of the Working Party 5C Correspondence Group on developing new draft ITU Handbook on fixed wireless systems |
|
Word
|
51133 octets |
2025-05-30 |
[206] Annex 2 Revision 1- Meeting Report of Working Group 5C-2 - Sharing, compatibility aspects and WRCs issues |
|
Word
|
23567 octets |
2025-05-27 |
[206] Annex 2.1 - Part 2
|
|
Word
|
95353 octets |
2025-05-27 |
[206] Annex 2.1 - Part 1
|
|
Word
|
4799360 octets |
2025-05-27 |
[206] Annex 2.1- Working document on sharing studies under WRC-27 agenda item 1.10 |
|
Word
|
6397969 octets |
2025-05-27 |
[206] Annex 2.2- Working document towards a preliminary draft new Report ITU-R F.[SHARING_STUDY_FS_ARNS] - Coexistence study between airborne stations in the radionavigation service and stations in the fixed service in the band 31.8-33.4 GHz |
|
Word
|
545501 octets |
2025-05-27 |
[206] Annex 2.3- Working document towards preliminary draft revision of Recommendation ITU-R F.1571 - Mitigation techniques for use in reducing the potential for interference between airborne stations in the radionavigation service and stations in the fixed service in the band 31.8-33.4 GHz |
|
Word
|
55136 octets |
2025-05-27 |
[206] Annex 1- Meeting Report of Working Group 5C-1 - Spectrum, applications and technology aspects |
|
Word
|
89898 octets |
2025-05-27 |
[206] Annex 1.1- Preliminary draft revision of Recommendation ITU-R F.2086-0 - Deployment scenarios for point-to-point systems in the fixed service |
|
Word
|
11417785 octets |
2025-05-27 |
[206] Annex 1.2- [Working document towards a] preliminary draft revision of Report ITU-R F.2323-2 - Fixed service use and future trends |
|
Word
|
887034 octets |
2025-05-27 |
[206] Annex 1.3- Working document towards a preliminary draft new Report ITU-R F.[FS.CHAR.450-1 000 GHZ] - Technical and operational characteristics of the fixed service applications operating in the frequency range 450-1 000 GHz |
|
Word
|
4061505 octets |
2025-05-27 |
[206] Annex 1.4- Working document towards a preliminary draft revision of Report ITU-R F.2416-1 - Technical and operational characteristics and applications of the point-to-point fixed service applications operating in the frequency band 275-450 GHz |
|
Word
|
38907 octets |
2025-05-27 |
[206] Annex 1.5- Working document towards preliminary draft new Recommendation ITU-R F.[OPPORTUNISTIC_WEATHER_MONITORING] - Microwave link performance data sharing and collection for opportunistic weather monitoring |
|
|