Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-R : R23-WP5C Ajoutés récemment -  Recherche de documents de réunion
   
UIT-R R23-WP5C Documents de réunions
  Nb max de documents affichés/page:
Résultats: 54 documents
Result Page:  1 - 2  - Suivant
Numéro  Date Source Titre Questions 
  Numéro  Mise à disposition Taille    
 
[ ADM 95 ]  2026-11-11 WP 5C   Draft schedule for the 35th meeting of Working Party 5C (18-27 November 2026)     N/A  
  [ ADM 95 ] Revision 2 - English - Word 2026-11-18 [18:07]  48'399  octets  
 
[ INF 13 ]  2026-11-16 WPs 5A, 5B & 5C   Initial overall meeting schedule for WPs 5A, 5B and 5C (Geneva, 18-27 November 2026)     N/A  
  [ INF 13 ] Revision 1 - English - Word 2026-11-18 [18:04]  58'026  octets  
 
[ ADM 98 ]  2026-11-18 Chair, WG 5C-1   Draft agenda for the first meeting of Working Group 5C-1 - Thursday, 19 November 2026 at 0900 hours, Geneva Time (Room C, ITU Tower)     N/A  
  [ ADM 98 ]  - English - Word 2026-11-18 [16:53]  46'107  octets  
 
[ 370 ]  2026-11-11 BR, Study Groups Department   List of documents issued and assignments for Working Party 5C #35 - (Documents 5C/322 - 5C/370)     N/A  
  [ 370 ] Revision 1 - English - Word 2026-11-18 [16:07]  51'153  octets  
 
[ ADM 97 ]  2026-11-18 Chair, WG 5C-2   Draft agenda for the first and second meetings of Working Group 5C-2 Sharing, Compatibility Aspects and WRCs Issues - Wednesday, 18 November 2026 at 1545 hours (Room Popov, ITU Tower), Thursday, 19 November 2026 at 1045 hours (Room C, ITU Tower)     N/A  
  [ ADM 97 ]  - English - Word 2026-11-18 [14:27]  65'735  octets  
 
[ ADM 96 ]  2026-11-16 Chair, WG 5C-3   Draft agenda for Working Group 5C-3 "WG General Aspects and HF Systems" Opening Plenary - Thursday 19 November 2026, 1400-1515 hours (Geneva time) (Room C, ITU Tower)     N/A  
  [ ADM 96 ] Revision 1 - English - Word 2026-11-18 [12:15]  61'328  octets  
 
[ INF 12 ]  2026-11-09 BR, Study Groups Department   Information to participants - Meetings of Working Parties 5A, 5B and 5C (Geneva, 18-27 November 2026)     N/A  
  [ INF 12 ] Part 1 - English -  PowerPoint 2007 2026-11-11 [13:46]  4'099'575  octets  
  [ INF 12 ]  - English - Word 2026-11-11 [13:31]  4'955'107  octets  
 
[ 335 ]  2026-09-22 CCT   Reply liaison statement on the validated term "sky-wave" and comments on the term "ground-wave" developed by ITU-R Working Party 5C     N/A  
  [ 335 ] Redacted 1 - English - Word 2026-11-11 [14:41]  70'370  octets  
 
[ ADM 94 ]  2026-11-11 Chair, WP 5C   Working structure of the 35th meeting of Working Party 5C     N/A  
  [ ADM 94 ]  - English - Word 2026-11-11 [14:05]  40'577  octets  
 
[ ADM 93 ]  2026-11-11 Chair, WP 5C   Draft agenda for the Opening Plenary of the 35th meeting of Working Party 5C - Wednesday, 18 November 2026, at 14:00 hours (Geneva time) (Room Popov, ITU Tower)     N/A  
  [ ADM 93 ]  - English - Word 2026-11-11 [13:56]  35'930  octets  
 
[ 369 ]  2026-11-06 United States   Supporting material towards a potential revision of Recommendation ITU-R F.758     N/A  
  [ 369 ]  - English - Word 2026-11-11 [10:55]  73'857  octets  
 
[ 368 ]  2026-11-06 United States   Working document on sharing studies under WRC-27 agenda item 1.10     AI1.10  
  [ 368 ]  - English - Word 2026-11-11 [10:22]  2'852'097  octets  
 
[ 367 ]  2026-11-06 France   Working document towards preliminary draft new Report ITU-R F.[SHARING_STUDY_FS_ARNS] - Coexistence study between airborne stations in the radionavigation service and stations in the fixed service in the band 31.8-33.4 GHz     N/A  
  [ 367 ]  - English - Word 2026-11-11 [12:07]  12'097'658  octets  
 
[ 366 ]  2026-11-06 France   Characteristics of the fixed service for inclusion in Appendix 7 Tables 7C and 8D     AI1.10  
  [ 366 ]  - English - Word 2026-11-11 [09:55]  58'914  octets  
 
[ 365 ]  2026-11-06 France   Comparison of pfd masks considered in studies under WRC-27 agenda item 1.10     AI1.10  
  [ 365 ]  - English - Word 2026-11-11 [08:59]  3'864'179  octets  
 
[ 364 ]  2026-11-05 United States   Preliminary draft revision of Report ITU-R F.2588-0 - Studies on unwanted emission levels outside the allocated bands for fixed service systems operating in frequency bands from 94.1 GHz to 174.8 GHz for the protection of Earth exploration satellite service (passive) operating in adjacent bands where footnote No. 5.340 of the Radio Regulations applies     N/A  
  [ 364 ]  - English - Word 2026-11-09 [11:29]  2'204'914  octets  
 
[ 363 ]  2026-11-05 Russian Federation   Revision of Annex 4 to working document towards preliminary draft ITU-R Handbook on fixed wireless systems Section 4.2 propagation related issues     N/A  
  [ 363 ] Part 1 - English - Word 2026-11-06 [15:45]  1'707'759  octets  
  [ 363 ]  - English - Word 2026-11-06 [15:44]  1'669'214  octets  
 
[ 362 ]  2026-11-05 Russian Federation   Proposals on working document toward preliminary draft new report on sharing studies in the band 71-76 GHz and 81-86 GHz     AI1.10  
  [ 362 ]  - English - Word 2026-11-06 [15:42]  289'951  octets  
 
[ 352 ]  2026-11-05 China   Proposal to working document toward preliminary draft new report on sharing studies in the band 71-76 GHz and 81-86 GHz - Sharing studies on protection of FS from interference of satellite in the band 71-76 GHz and 81-86 GHz     N/A  
  [ 352 ]  - English - Word 2026-11-05 [16:39]  48'290  octets  
 
[ 361 ]  2026-11-05 World Meteorological Organization   [Working document towards] preliminary draft new Report ITU-R F.[WEATHER_MONITORING] - Fixed wireless link performance data collection for weather monitoring     N/A  
  [ 361 ]  - English - Word 2026-11-06 [15:36]  39'170  octets  
 
[ 360 ]  2026-11-05 ATDI   Revisions of the definition of terms in Recommendations ITU-R F.1762-1 and ITU-R F.1821 - High Frequency radiocommunication systems in the fixed and mobile: characteristics of enhanced applications (ITU-R F.1762) and advanced digital (ITU-R F.1821)     N/A  
  [ 360 ]  - English - Word 2026-11-06 [12:13]  63'438  octets  
 
[ 359 ]  2026-11-05 Politecnico di Milano Dipartimento di Elettronica, Informazion e Biongegneria   [Working document towards] preliminary draft new Report ITU-R F.[WEATHER_MONITORING] - Fixed wireless link performance data collection for weather monitoring     N/A  
  [ 359 ]  - English - Word 2026-11-06 [10:18]  1'312'005  octets  
 
[ 357 ]  2026-11-05 China   Proposed modifications to the working document towards a preliminary draft new Report ITU-R F.[FS.CHAR.450-700 GHZ] - Clarification of antenna aperture and gain parameters     N/A  
  [ 357 ]  - English - Word 2026-11-06 [09:43]  41'709  octets  
 
[ 358 ]  2026-11-05 China   Proposed modifications to the working document towards a preliminary draft revision of Recommendation ITU-R F.1245-3 - Questions concerning application of the average radiation pattern above 86 GHz     N/A  
  [ 358 ]  - English - Word 2026-11-06 [09:59]  180'611  octets  
 
[ 356 ]  2026-11-05 China   About the extension of the research cycle of Question 258/5 to 2031     Q258/5  
  [ 356 ]  - English - Word 2026-11-06 [09:25]  43'305  octets  
 
[ 355 ]  2026-11-05 China   Proposal of a working document towards a preliminary draft new Report ITU-R F.[HF ENVIRONMENT]     Q258/5  
  [ 355 ]  - English - Word 2026-11-06 [09:02]  2'981'235  octets  
 
[ 354 ]  2026-11-05 China   Considerations on new ITU-R Handbook on fixed wireless systems     N/A  
  [ 354 ]  - English - Word 2026-11-05 [16:51]  6'676'141  octets  
 
[ 353 ]  2026-11-05 China   Proposal to update Recommendation ITU-R F.2006 - Radio-frequency channel and block arrangements for fixed wireless systems operating in the 71-76 and 81-86 GHz bands     N/A  
  [ 353 ]  - English - Word 2026-11-06 [10:26]  826'204  octets  
 
[ 351 ]  2026-11-05 China   Proposal to upgrade preliminary draft revision of Report ITU-R F.2323-2 - Fixed service use and future trends     N/A  
  [ 351 ]  - English - Word 2026-11-05 [16:33]  44'607  octets  
 
[ 350 ]  2026-11-04 Japan   Proposed detailed structure and source mapping for the working document towards a new ITU-R Handbook on fixed wireless systems - New ITU-R Handbook on fixed wireless systems     N/A  
  [ 350 ] Part 5 - English - Word 2026-11-05 [16:16]  945'902  octets  
  [ 350 ] Part 4 - English - Word 2026-11-05 [16:16]  2'753'095  octets  
  [ 350 ] Part 3 - English - Word 2026-11-05 [16:16]  8'191'329  octets  
  [ 350 ] Part 2 - English - Word 2026-11-05 [16:16]  1'550'790  octets  
  [ 350 ] Part 1 - English - Word 2026-11-05 [16:15]  19'969'203  octets  
  [ 350 ]  - English - Word 2026-11-05 [16:14]  32'238'292  octets  
 
[ 349 ]  2026-11-04 Japan   Proposal for the structure of a new ITU-R Handbook on fixed wireless systems new ITU-R Handbook on fixed wireless systems     N/A  
  [ 349 ]  - English - Word 2026-11-05 [16:25]  45'927  octets  
 
[ 348 ]  2026-11-04 Japan   Preliminary review of the questions assigned to Working Party 5C     N/A  
  [ 348 ]  - English - Word 2026-11-05 [15:03]  58'635  octets  
 
[ 347 ]  2026-11-04 Japan   Proposal to complete the revision of Report ITU-R F.2323-2 - Fixed service use and future trends     N/A  
  [ 347 ]  - English - Word 2026-11-05 [14:50]  33'865  octets  
 
[ 346 ]  2026-11-04 Japan   Proposed modifications to preliminary draft revision of Recommendation ITU-R F.746-11 - Radio-frequency arrangements for fixed service systems     N/A  
  [ 346 ]  - English - Word 2026-11-10 [08:35]  332'035  octets  
 
[ 345 ]  2026-11-04 Japan   Proposed modification to working document towards a preliminary draft new Report ITU-R F.[FS.CHAR.450-700 GHZ] - Technical and operational characteristics of the fixed service applications operating in the frequency range 450-700 GHz     Q257/5  
  [ 345 ]  - English - Word 2026-11-05 [11:38]  1'717'707  octets  
 
[ 344 ]  2026-11-04 Canada   Proposed modifications to working document toward preliminary draft new report on sharing studies in the band 71-76 GHZ and 81-86 GHz     AI1.10  
  [ 344 ]  - English - Word 2026-11-04 [11:26]  1'237'890  octets  
 
[ 343 ]  2026-11-03 India   Working document on sharing studies under WRC-27 agenda item 1.10     AI1.10  
  [ 343 ]  - English - Word 2026-11-04 [10:49]  6'225'507  octets  
 
[ 342 ]  2026-10-05 WP 6A   Liaison statement to Working Parties 5A and 5C regarding updates to the ENG/PMSE database spreadsheet     N/A  
  [ 342 ]  - English - Word 2026-10-05 [15:59]  47'594  octets  
 
[ 341 ]  2026-10-02 WP 7C   Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 3J and 3M on WRC-27 agenda item 1.18 - WRC-27 agenda item 1.18, resolves 1     AI1.18  
  [ 341 ]  - English - Word 2026-10-02 [11:33]  35'644  octets  
 
[ 340 ]  2026-10-01 WP 7C   Liaison statement to Working Parties 4A, 5A, 5B, 5C, 5D and 7B regarding progress of the work on WRC-27 agenda item 1.19     AI1.19  
  [ 340 ]  - English - Word 2026-10-01 [15:07]  108'356  octets  
 
[ 339 ]  2026-10-01 WP 7B   Liaison statement to Working Parties 4A, 5A, 5C, 7C and 7D - Activities related to WRC-31 preliminary agenda item 2.10     AI2.10  
  [ 339 ]  - English - Word 2026-10-01 [15:11]  37'815  octets  
 
[ 338 ]  2026-10-01 WP 7B   Liaison statement to ITU-R Working Parties 3J, 4A, 4C, 5A, 5B, 5C, 5D, 7A, 7C and 7D - Progress of activities relating to WRC-27 agenda item 1.15     AI1.15  
  [ 338 ]  - English - Word 2026-10-01 [16:26]  110'759  octets  
 
[ 337 ]  2026-10-01 WP 7B   Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7C and 7D - Activities related to WRC-31 preliminary agenda item 2.11     AI2.11  
  [ 337 ]  - English - Word 2026-10-01 [14:52]  37'689  octets  
Résultats: 54 documents
Result Page:  1 - 2  - Suivant
 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML Oui  
Formats doc pdf zip  + Autres formats
Langues (maximum 2) E F S A C R  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  Coordinateur du Web UIT-R
Mis à jour le : 2026-11-18