Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-R : R23-WP6A : Contribuciones : 140 Nuevo -  Busque los documentos de la reunión
   
[140]  Report of the meeting of Working Party 6A (Geneva, 5-12 March 2025)

Formato

Tamaño

Puesta a disposición

English

Word  

50116 octetos 2025-03-31 [140] Chapter 5- Meeting Report from Sub-Working Group 6A-5 (Other issues)

Word  

1118492 octetos 2025-03-20 [140] Chapter 5 - Annex 12- Working document towards a preliminary draft revision of Report ITU-R BT.2299-3 - Broadcasting for public warning, disaster mitigation and relief

Word  

235210 octetos 2025-03-20 [140] Chapter 5 - Annex 13- Working document towards a preliminary draft revision of Report ITU-R BT.2385-1 - Reducing the environmental impact of terrestrial broadcasting systems

Word  

36128 octetos 2025-03-31 [140] Chapter 4- Meeting Report from Sub-Working Group 6A-4 (Protection)

Word  

44173 octetos 2025-03-31 [140] Chapter 3 Part 1

Word  

92482 octetos 2025-03-31 [140] Chapter 3- Meeting Report from Sub-Working Group 6A-3 (WRC-27 agenda items and sharing)

Word  

39187 octetos 2025-03-20 [140] Chapter 3 - Annex 11- Continuation of Rapporteur Group to undertake WRC-27 studies related to Working Party 6A

Word  

42652 octetos 2025-03-31 [140] Chapter 2- Meeting Report from Sub-Working Group 6A-2 (Sound and Multimedia)

Word  

3526946 octetos 2025-03-20 [140] Chapter 2 - Annex 7- Preliminary draft revision of Recommendation ITU-R BS.1114-12 - Systems for terrestrial digital sound broadcasting to vehicular, portable and fixed receivers in the frequency range 30-3 000 MHz

Word  

204970 octetos 2025-03-20 [140] Chapter 2 - Annex 8- Preliminary draft revision of Recommendation ITU-R BS.705-1 - HF transmitting and receiving antennas characteristics and diagrams

Word  

14070272 octetos 2025-03-20 [140] Chapter 2 - Annex 9 Part 1

Word  

12307798 octetos 2025-03-20 [140] Chapter 2 - Annex 9- Working document towards a preliminary draft revision of ITU-R Handbook - HF broadcasting system design

Word  

21087275 octetos 2025-03-21 [140] Chapter 2 - Annex 10- Preliminary draft revision of Report ITU-R BS.2384 - Implementation considerations for the introduction and transition to digital terrestrial sound and multimedia broadcasting

Word  

66622 octetos 2025-04-07 [140] Chapter 1- Meeting Report from Sub-Working Group 6A-1 - (Television) - (Geneva, 5-12 March 2025)

Word  

40963 octetos 2025-03-20 [140] Chapter 1 - Annex 1- Working document towards a preliminary draft revision of Report ITU-R BT.2386-5 - Digital terrestrial broadcasting: Design and implementation of single frequency networks (SFN)

Word  

233199 octetos 2025-03-20 [140] Chapter 1 - Annex 2- Preliminary draft revision of Report ITU-R BT.2485-3 - Advanced network planning and transmission methods for enhancements of digital terrestrial television broadcasting

Word  

4241459 octetos 2025-03-20 [140] Chapter 1 - Annex 3- Working document towards preliminary draft revision of Report ITU-R BT.2140 - Transition from analogue to digital terrestrial television broadcasting

Word  

94016 octetos 2025-03-20 [140] Chapter 1 - Annex 4- Working document towards preliminary draft revision of Recommendation ITU-R BT.1877-3 - Error-correction, data framing, modulation and emission methods and selection guidance for second generation digital terrestrial television broadcasting systems

Word  

9454540 octetos 2025-03-20 [140] Chapter 1 - Annex 5- Working document towards a preliminary draft revision of Report ITU-R BT.2526-1 - Field trials of terrestrial multimedia mobile broadcasting systems

Word  

148950 octetos 2025-03-20 [140] Chapter 1 - Annex 6- Preliminary draft revision of Report ITU-R BT.2295-4 - Digital terrestrial broadcasting systems

Word  

44166 octetos 2025-03-31 [140] Part 1

Word  

88230 octetos 2025-03-31 [140] - Report of the meeting of Working Party 6A (05 - 12 March 2025)
 

Documento :

UIT-R R23-WP6A  Contribución  140

Título :

Report of the meeting of Working Party 6A (Geneva, 5-12 March 2025)

Recibido en :

2025-03-12

Origen :

Chair, WP 6A

Reunión :

2025-03-10

Disponibilidad :

Restringido a usuarios de TIES [UIT-R]

Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  Coordenador de Web UIT-R
Actualizado el : 2025-04-07