Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-R : R23-WP5D : Contribuciones : 1546 Nuevo -  Busque los documentos de la reunión
   
[1546]  Report on the 53rd meeting of Working Party 5D (Geneva, 28 September- 8 October 2026)

Formato

Tamaño

Puesta a disposición

English

Word  

37451 octetos 2026-10-13 [1546] Chapter 6- Meeting Report of Ad-Hoc workplan Working Party 5D #53

Word  

102158 octetos 2026-10-13 [1546] Chapter 5- Meeting Report of Working Group Technology Aspects

Word  

39492 octetos 2026-10-13 [1546] Chapter 5 - Annex 5.1- Meeting Report of Sub-Working Group Coordination

Word  

42909 octetos 2026-10-14 [1546] Chapter 4 - Annex 4.1- Meeting Report of Sub-working Group WRC-27 agenda item 1.7

Word  

40897 octetos 2026-10-14 [1546] Chapter 4 - Annex 4.2- Sharing and compatibility studies under WRC-27 agenda item 1.7 - Main part

Word  

100108 octetos 2026-10-14 [1546] Chapter 4 - Annex 4.3- Annex 1 - Sharing and compatibility studies between services to which the band is currently allocated and IMT systems in the frequency band 4 400-4 800 MHz unde WRC-27 agenda item 1.7

Word  

12504086 octetos 2026-10-14 [1546] Chapter 4 - Annex 4.4- Annex 1 - Attachment 1 - Sharing between the fixed service and IMT operating in the frequency band 4 400-4 800 MHz

Word  

14762404 octetos 2026-10-14 [1546] Chapter 4 - Annex 4.5- Annex 1 - Attachment 2 - Sharing between the aeronautical mobile service and IMT operating in the frequency band 4 400-4 800 MHz

Word  

248477 octetos 2026-10-14 [1546] Chapter 4 - Annex 4.6- Annex 1 - Attachment 3 - Sharing between the maritime mobile service and IMT operating in the frequency band 4 400-4 800 MHz

Word  

9991753 octetos 2026-10-14 [1546] Chapter 4 - Annex 4.7- Annex 1 - Attachment 4 - Sharing between the fixed satellite service (space-to-Earth) (RR No. 5.441) in allotments in the RR Appendix 30B Plan, assignments in the RR Appendix 30B List, conversions of an allotment into an assignment, Article 7 requests transferred to Article 6 of RR Appendix 30B, submissions in accordance with Resolution 170 (Rev.WRC-23) ...

Word  

110271 octetos 2026-10-13 [1546] Chapter 3- Meeting Report of Working Group General Aspects

Word  

155477 octetos 2026-10-13 [1546] Chapter 3 - Annex 3.1- Meeting Report of Sub-Working Group Specific Applications

Word  

5353871 octetos 2026-10-13 [1546] Chapter 3 - Annex 3.2- Working document towards a preliminary draft revision of Report ITU-R M.2528-0 - Capabilities of the terrestrial component of IMT-2020 for multimedia communications

Word  

1821165 octetos 2026-10-13 [1546] Chapter 3 - Annex 3.3- Working document towards a preliminary draft new Report ITU-R M.[IMT.ATG] - Systems for non-safety air-ground communications (excluding UAS) using terrestrial mobile technologies, including IMT systems

Word  

2788613 octetos 2026-10-13 [1546] Chapter 3 - Annex 3.4- Working document towards a preliminary draft revision of Report ITU-R M.2291-2 - The use of International Mobile Telecommunications (IMT) for broadband Public Protection and Disaster Relief (PPDR) applications

Word  

39021 octetos 2026-10-13 [1546] Chapter 3 - Annex 3.5- Meeting Report of Sub-Working Group National Experiences

Word  

123138 octetos 2026-10-13 [1546] Chapter 3 - Annex 3.6- Working document towards a preliminary draft new Report ITU-R M.[IMT-FWA] - Technical and operational aspects of fixed wireless broadband access using IMT technology (IMT-FWA) in the frequency bands identified for IMT

Word  

43092 octetos 2026-10-13 [1546] Chapter 3 - Annex 3.7- Meeting Report of Sub-Working Group Circular

Word  

39821 octetos 2026-10-13 [1546] Chapter 3 - Annex 3.8- Meeting Report of Sub-Working Group RA-27 preparation

Zip (Document)  

48744 octetos 2026-10-13 [1546] Chapter 3 - Annex 3.9 - Part 2

Zip (Document)  

192740 octetos 2026-10-13 [1546] Chapter 3 - Annex 3.9 - Part 1

Word  

288704 octetos 2026-10-13 [1546] Chapter 3 - Annex 3.9- Working document to review existing ITU-R Resolutions, Questions and Opinions related to IMT

Word  

469871 octetos 2026-10-14 [1546] Chapter 2- Working Party 5D structure and work plan
 

Documento :

UIT-R R23-WP5D  Contribución  1546

Título :

Report on the 53rd meeting of Working Party 5D (Geneva, 28 September- 8 October 2026)

Recibido en :

2026-10-08

Origen :

Chair, WP 5D

Disponibilidad :

Restringido a usuarios de TIES [UIT-R]

Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  Coordenador de Web UIT-R
Actualizado el : 2026-10-14