|
Número |
Fecha
|
Origen
|
Título
|
Cuestiones
|
| |
Número |
Puesta a disposición |
Tamaño
|
|
|
| |
|
[ 1546 ]
|
2026-10-08 |
Chair, WP 5D
|
Report on the 53rd meeting of Working Party 5D (Geneva, 28 September- 8 October 2026)
|
N/A (no se aplica)
|
|
[ 1546 ] Chapter 4 - Annex 4.30 - English - Word |
2026-10-15 [09:53]
|
1'954'082 octetos |
Annex 4 - Sharing and compatibility studies under WRC-27 agenda item 1.7
|
|
[ 1546 ] Chapter 4 - Annex 4.33 - English - Word |
2026-10-14 [15:59]
|
42'765 octetos |
Meeting Report of Sub-Working Group IMT-MSS
|
|
[ 1546 ] Chapter 4 - Annex 4.10 - English - Word |
2026-10-14 [15:51]
|
1'667'102 octetos |
Annex 2 - Sharing and compatibility studies between services to which the band is currently allocated and IMT systems in the frequency band 7 125-8 400 MHz under WRC-27 agenda item 1.7
|
|
[ 1546 ] Chapter 4 - Annex 4.11 - English - Word |
2026-10-14 [15:34]
|
27'019'941 octetos |
Annex 2 - Attachment 1- Sharing between the fixed service and IMT operating in the frequency band 7 125-8 400 MHz
|
|
[ 1546 ] Chapter 4 - Annex 4.25 - English - Word |
2026-10-14 [14:36]
|
42'325 octetos |
Annex 3 - Sharing and compatibility studies between services to which the band is currently allocated and IMT systems in the frequency band 14.8-15.35 GHz under WRC-27 agenda item 1.7
|
|
[ 1546 ] Chapter 4 - Annex 4.8 - English - Word |
2026-10-14 [14:20]
|
46'863 octetos |
Annex 1 - Attachment 5 - Compatibility of the aeronautical mobile (R) service (RR No. 5.436) operating in the frequency band 4 200-4 400 MHz and IMT operating in the frequency band 4 400-4 800 MHz
|
|
[ 1546 ] Chapter 4 - Annex 4.6 - English - Word |
2026-10-14 [12:15]
|
248'477 octetos |
Annex 1 - Attachment 3 - Sharing between the maritime mobile service and IMT operating in the frequency band 4 400-4 800 MHz
|
|
[ 1546 ] Chapter 4 - Annex 4.7 - English - Word |
2026-10-14 [12:13]
|
9'991'753 octetos |
Annex 1 - Attachment 4 - Sharing between the fixed satellite service (space-to-Earth) (RR No. 5.441) in allotments in the RR Appendix 30B Plan, assignments in the RR Appendix 30B List, conversions of an allotment into an assignment, Article 7 requests transferred to Article 6 of RR Appendix 30B, submissions in accordance with Resolution 170 (Rev.WRC-23) ...
|
|
[ 1546 ] Chapter 4 - Annex 4.3 - English - Word |
2026-10-14 [12:08]
|
100'108 octetos |
Annex 1 - Sharing and compatibility studies between services to which the band is currently allocated and IMT systems in the frequency band 4 400-4 800 MHz unde WRC-27 agenda item 1.7
|
|
[ 1546 ] Chapter 4 - Annex 4.4 - English - Word |
2026-10-14 [11:53]
|
12'504'086 octetos |
Annex 1 - Attachment 1 - Sharing between the fixed service and IMT operating in the frequency band 4 400-4 800 MHz
|
|
[ 1546 ] Chapter 4 - Annex 4.5 - English - Word |
2026-10-14 [11:42]
|
14'762'404 octetos |
Annex 1 - Attachment 2 - Sharing between the aeronautical mobile service and IMT operating in the frequency band 4 400-4 800 MHz
|
|
[ 1546 ] Chapter 4 - Annex 4.2 - English - Word |
2026-10-14 [09:38]
|
40'897 octetos |
Sharing and compatibility studies under WRC-27 agenda item 1.7 - Main part
|
|
[ 1546 ] Chapter 4 - Annex 4.1 - English - Word |
2026-10-14 [09:37]
|
42'909 octetos |
Meeting Report of Sub-working Group WRC-27 agenda item 1.7
|
|
[ 1546 ] Chapter 2 - English - Word |
2026-10-14 [09:05]
|
469'871 octetos |
Working Party 5D structure and work plan
|
|
[ 1546 ] Chapter 6 - English - Word |
2026-10-13 [17:07]
|
37'451 octetos |
Meeting Report of Ad-Hoc workplan Working Party 5D #53
|
|
[ 1546 ] Chapter 5 - English - Word |
2026-10-13 [17:05]
|
102'158 octetos |
Meeting Report of Working Group Technology Aspects
|
|
[ 1546 ] Chapter 3 - English - Word |
2026-10-13 [16:56]
|
110'271 octetos |
Meeting Report of Working Group General Aspects
|
|
[ 1546 ] Chapter 3 - Annex 3.8 - English - Word |
2026-10-13 [16:47]
|
39'821 octetos |
Meeting Report of Sub-Working Group RA-27 preparation
|
|
[ 1546 ] Chapter 3 - Annex 3.7 - English - Word |
2026-10-13 [16:46]
|
43'092 octetos |
Meeting Report of Sub-Working Group Circular
|
|
[ 1546 ] Chapter 3 - Annex 3.5 - English - Word |
2026-10-13 [16:46]
|
39'021 octetos |
Meeting Report of Sub-Working Group National Experiences
|
|
[ 1546 ] Chapter 3 - Annex 3.1 - English - Word |
2026-10-13 [16:45]
|
155'477 octetos |
Meeting Report of Sub-Working Group Specific Applications
|
|
[ 1546 ] Chapter 5 - Annex 5.1 - English - Word |
2026-10-13 [16:43]
|
39'492 octetos |
Meeting Report of Sub-Working Group Coordination
|
|
[ 1546 ] Chapter 3 - Annex 3.9 - Part 2 - English - Zip (Document) |
2026-10-13 [16:24]
|
48'744 octetos |
|
|
[ 1546 ] Chapter 3 - Annex 3.9 - Part 1 - English - Zip (Document) |
2026-10-13 [16:24]
|
192'740 octetos |
|
|
[ 1546 ] Chapter 3 - Annex 3.9 - English - Word |
2026-10-13 [16:23]
|
288'704 octetos |
Working document to review existing ITU-R Resolutions, Questions and Opinions related to IMT
|
|
[ 1546 ] Chapter 3 - Annex 3.6 - English - Word |
2026-10-13 [16:17]
|
123'138 octetos |
Working document towards a preliminary draft new Report ITU-R M.[IMT-FWA] - Technical and operational aspects of fixed wireless broadband access using IMT technology (IMT-FWA) in the frequency bands identified for IMT
|
|
[ 1546 ] Chapter 3 - Annex 3.3 - English - Word |
2026-10-13 [16:14]
|
1'821'165 octetos |
Working document towards a preliminary draft new Report ITU-R M.[IMT.ATG] - Systems for non-safety air-ground communications (excluding UAS) using terrestrial mobile technologies, including IMT systems
|
|
[ 1546 ] Chapter 3 - Annex 3.4 - English - Word |
2026-10-13 [16:10]
|
2'788'613 octetos |
Working document towards a preliminary draft revision of Report ITU-R M.2291-2 - The use of International Mobile Telecommunications (IMT) for broadband Public Protection and Disaster Relief (PPDR) applications
|
|
[ 1546 ] Chapter 3 - Annex 3.2 - English - Word |
2026-10-13 [14:46]
|
5'353'871 octetos |
Working document towards a preliminary draft revision of Report ITU-R M.2528-0 - Capabilities of the terrestrial component of IMT-2020 for multimedia communications
|
| |
|
[ 1551 ]
|
2026-10-01 |
Alliance for Telecommunications Industry Solutions (ATIS)
|
Updated material on "3GPP 5G-NTN SRIT" for updating Recommendation ITU-R M.2177 to Revision 1
|
N/A (no se aplica)
|
|
[ 1551 ] Part 3 - English - Zip (Document) |
2026-10-13 [10:57]
|
849'636 octetos |
|
|
[ 1551 ] Part 2 - English - Zip (Document) |
2026-10-13 [10:57]
|
101'945 octetos |
|
|
[ 1551 ] Part 1 - English - Zip (Document) |
2026-10-13 [10:57]
|
118'322 octetos |
|
|
[ 1551 ] - English - Word |
2026-10-13 [10:56]
|
1'118'723 octetos |
|
| |
|
[ 1550 ]
|
2026-10-01 |
Alliance for Telecommunications Industry Solutions (ATIS)
|
Updated material on "3GPP 5G-NTN RIT" for updating Recommendation ITU-R M.2177 to Revision 1
|
N/A (no se aplica)
|
|
[ 1550 ] Part 3 - English - Zip (Document) |
2026-10-13 [10:55]
|
107'586 octetos |
|
|
[ 1550 ] Part 2 - English - Zip (Document) |
2026-10-13 [10:55]
|
528'169 octetos |
|
|
[ 1550 ] Part 1 - English - Zip (Document) |
2026-10-13 [10:54]
|
99'380 octetos |
|
|
[ 1550 ] - English - Word |
2026-10-13 [10:54]
|
785'839 octetos |
|
| |
|
[ 1549 ]
|
2026-10-09 |
WP 6A
|
Reply liaison statement to ITU-D Study Group 1 Question 3/1 (and copy for information to ITU-R Working Party 5A and Working Party 5D) - ITU-D Study Group 1 Question 3/1: The use of telecommunications/ICTs for disaster risk reduction and management
|
N/A (no se aplica)
|
|
[ 1549 ] - English - Word |
2026-10-09 [17:36]
|
45'263 octetos |
|
| |
|
[ 1548 ]
|
2026-10-09 |
WP 6A
|
Liaison statement to ITU-R Working Party 1C (copy for information to Working Party 5D)
|
N/A (no se aplica)
|
|
[ 1548 ] - English - Word |
2026-10-09 [17:27]
|
44'792 octetos |
|
| |
|
[ 1547 ]
|
2026-09-18 |
Asia-Pacific Telecommunity
|
Liaison statement to ITU-R Working Parties 4B and 5D and ITU-T Study Group 13 on APT report on applications and technologies for interoperability of multiple NTN and TN operating systems
|
N/A (no se aplica)
|
|
[ 1547 ] Part 1 - English - Word |
2026-10-09 [16:44]
|
3'156'755 octetos |
|
|
[ 1547 ] - English - Word |
2026-10-09 [16:44]
|
3'070'625 octetos |
|
| |
|
[ ADM 151 ]
|
2026-10-08 |
Chair, WP 5D
|
Agenda for the Closing Plenary of the 53rd meeting of Working Party 5D Thursday, 8 October 2026, 1330-1445 hours, 1515-1630 hours, 1645-1800 hours (Geneva time) (Room Popov, ITU Tower)
|
N/A (no se aplica)
|
|
[ ADM 151 ] Revision 1 - English - Word |
2026-10-09 [08:55]
|
43'737 octetos |
|
| |
|
[ TD 628 ]
|
2026-10-05 |
SWG Specific Applications
|
[Draft] liaison statement to Working Party 5A (copy to Working Party 5B for information) - Development of a draft new Report ITU-R M. [IMT.ATG] - Systems for non-safety air-ground communications (excluding UAS) using terrestrial mobile technologies, including IMT systems
|
N/A (no se aplica)
|
|
[ TD 628 ] Revision 2 - English - Word |
2026-10-08 [13:35]
|
39'457 octetos |
|
| |
|
[ TD 671 ]
|
2026-10-07 |
SWG Specific Applications
|
Meeting Report of Sub-Working Group Specific Applications
|
N/A (no se aplica)
|
|
[ TD 671 ] Revision 1 - English - Word |
2026-10-08 [13:01]
|
154'372 octetos |
|
| |
|
[ TD 669 ]
|
2026-10-07 |
SWG Specific Applications
|
Annex XX to Working Party 5D Chair's Report - Preliminary draft revision of Report ITU-R M.2527-0 - Applications of the terrestrial component of International Mobile Telecommunications for specific societal, industrial and other usages
|
N/A (no se aplica)
|
|
[ TD 669 ] Revision 1 - English - Word |
2026-10-08 [12:59]
|
17'195'545 octetos |
|
| |
|
[ TD 640 ]
|
2026-10-06 |
SWG National Experiences
|
[Draft] Revision of Report ITU-R M.2480-1 - National approaches of some countries on the implementation
of terrestrial IMT systems in bands identified for IMT
|
N/A (no se aplica)
|
|
[ TD 640 ] Revision 1 - English - Word |
2026-10-08 [12:55]
|
4'379'641 octetos |
|
| |
|
[ TD 635 ]
|
2026-10-06 |
SWG Circular
|
[Draft] liaison statement to external organizations - Availability of Addendum 3 to Circular Letter 5/LCCE/115 related to proposals for submission of candidate radio interface technologies for the terrestrial components of the radio interface(s) for IMT-2030 and their subsequent evaluation
|
N/A (no se aplica)
|
|
[ TD 635 ] Revision 1 - English - Word |
2026-10-08 [12:49]
|
41'552 octetos |
|
| |
|
[ TD 656 ]
|
2026-10-07 |
SWG IMT Specifications
|
[Draft] liaison statement to external organizations on the schedule for updating Recommendation ITU-R M.2150 to revision 4
|
N/A (no se aplica)
|
|
[ TD 656 ] Revision 1 Part 1 - English - Word |
2026-10-08 [12:23]
|
71'739 octetos |
|
|
[ TD 656 ] Revision 1 - English - Word |
2026-10-08 [12:23]
|
116'087 octetos |
|
| |
|
[ TD 655 ]
|
2026-10-07 |
SWG IMT Specifications
|
[Draft] liaison statement to external organizations on
the schedule for updating Recommendation
ITU-R M.2012 to revision 8
|
N/A (no se aplica)
|
|
[ TD 655 ] Revision 1 Part 1 - English - Word |
2026-10-08 [12:12]
|
55'779 octetos |
|
Resultados: 88 documentos
Result Page:
1 -
2
- Siguiente

|
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):