Contribuciones
Número
Título
Origen
AI/Cuestión
Filtro...
AI1.1
AI1.10
AI1.11
AI1.12
AI1.13
AI1.14
AI1.15
AI1.16
AI1.17
AI1.18
AI1.19
AI1.2
AI1.3
AI1.4
AI1.6
AI1.7
AI1.8
Q250-1/5
Q261/5
Q263/5
Q264/5
Q37-6/5
Borrar filtro
Fecha
[ 302 ]
Liaison statement to ITU-R Working Parties 4B, 4C, 5A, 5D and 6A (copy to ITU-T Study Groups 5, 13 and 15 for information) - Request for feedback on the term "multiple-input and multiple-output (MIMO)" and its definition developed by ITU-R Working Party 5C and submitted to the CCT for validation
CCT
2025-10-03
[ 301 ]
Liaison statement to ITU-R working parties 4A, 5A and 5D - Request for feedback on the term "mesh network" and its definition developed by ITU-R Working Party 5C and submitted to the CCT for validation
CCT
2025-10-03
[ 300 ]
Contribution to the preliminary draft revision of Report ITU-R M.2533-0 - Utility radiocommunications operating in the land-mobile service
Spain
2025-09-26
[ 299 ]
Liaison statement to Working Parties 4A, 5A, 5C, 5D and 7B - EESS (passive) studies in the 6 425-7 250 MHz range
WP 7C
2025-09-26
[ 298 ]
Liaison statement to ITU-R Working Parties 3J, 4A, 4C, 5A, 5B, 5C, 5D, 7A, 7C and 7D - Progress of activities relating to WRC-27 agenda item 1.15
WP 7B
AI1.15
2025-09-26
[ 297 ]
Reply liaison statement to Working Party 5A (copy to Working Party 5C for information) - Working document towards a preliminary draft new Report ITU-R M.[AUDIO-PMSE_LMS]
WP 6A
2025-09-16
[ 296 ]
Note to the Chair of ITU-R Working Parties 5A, 5B, 5C and 5D copy to ITU-R Study Group 5 - Consideration of received liaison statement from TSAG on the activities and studies on sustainable digital transformation
Chair, SG 5
2025-09-12
[ 295 ]
Liaison statement on the consent of draft new Recommendation ITU-T M.3393 (M.rsmca) - Requirements for smart maintenance of cell antenna
ITU-T SG2
2025-09-11
[ 294 ]
Reply liaison statement to ITU-R Working Party 5A - Validation of the term "radiocommunication system between train and trackside (RSTT)" and its definition and inclusion in the ITU Terms and Definitions database
CCT
2025-08-19
[ 293 ]
Reply liaison statement to Working Party 7D (copy to Working Party 5A) - Determination of the coordination area around "existing" RAS stations from IMT stations in the frequency band 6 650-6 675.2 MHz
WP 5D
2025-07-07
[ 292 ]
Reply liaison statement to Working Party 5A - Working document towards a preliminary draft new Report ITU-R M.[AUDIO-PMSE_LMS]
WP 1B
2025-06-25
[ 291 ]
Reply liaison statement to Working Party 5B (copy for information to Working Parties 1B, 4A, 4C, 5A, 5C and 5D) - The On-Tune Rejection (OTR) in Recommendation ITU-R SM.337 and Recommendation ITU-R M.1461
WP 1A
2025-06-19
[ 290 ]
Reply liaison statement to Working Party 7D (copy to Working Parties 4C, 5A, 5D and 7C for information) - Beam Wireless Power Transmission (WPT)
WP 1A
2025-06-19
[ 289 ]
Liaison statement to Working Party 4A (copy to Working Parties 5A, 5C, 7C and 7D for information) - Update on propagation modelling for WRC-27 agenda item 1.3
WP 3M
AI1.3
2025-06-10
[ 288 ]
Liaison statement to Working Party 4A (copy to Working Parties 4B, 5A, 5B, 5C and 7C for information) - Update on propagation modelling for WRC-27 agenda item 1.4
WP 3M
AI1.4
2025-06-10
[ 287 ]
Liaison statement to Working Party 5D (copy to Working Parties 4A, 4C, 5A, 5B, 5C, 7B, 7C and 7D for information) - Update on propagation modelling for WRC-27 agenda item 1.7
WPs 3K and 3M
AI1.7
2025-06-10
[ 286 ]
Liaison statement to Working Party 7B (copy to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 7A, 7C and 7D for information) - Report on progress of activities relating to WRC-27 agenda item 1.15
WP 3J
AI1.15
2025-06-10
[ 285 ]
Liaison statement to Working Party 5C (copy to Working Parties 4A, 4B, 4C, 5A, 5B, 6A, 7C and 7D for information) - Update on propagation modelling for WRC-27 agenda item 1.10
WP 3M
AI1.10
2025-06-10
[ 284 ]
Liaison statement to Working Party 4C (copy to Working Parties 4A, 4B, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D for information) - Update on propagation modelling for WRC-27 agenda items 1.11, 1.12, 1.13 and 1.14
WP 3M
AI1.14 , AI1.13 , AI1.12 , AI1.11
2025-06-10
[ 283 ]
Liaison statement to Working Party 4A (copy to Working Parties 5A, 5B, 5C, 5D, 7C and 7D for information) - Update on propagation modelling for WRC-27 agenda item 1.1
WPs 3K and 3M
AI1.1
2025-06-09
[ 282 ]
Liaison statement to Working Parties 4A and 5B (copy to Working Parties 5A, 5C, 7A, 7B and 7C for information) - Update on propagation modelling for WRC-27 agenda item 1.2
WP 3M
AI1.2
2025-06-09
[ 281 ]
Liaison statement to Working Party 5B (copy to Working Parties 4A, 4C, 5A, 5C, 7C and 7D for information) - Guidance on usage of Recommendations ITU-R P.2108 and ITU-R P.2109 to support studies under WRC-27 agenda item 1.8
WPs 3J, 3K and 3M
AI1.8
2025-06-09
[ 280 ]
Liaison statement to Working Party 7D (copy to Working Parties 4A, 4C, 5A, 5B and 5D for information) - Update on propagation modelling for WRC-27 agenda item 1.16
WP 3M
AI1.16
2025-06-09
[ 279 ]
Liaison statement to Working Party 7C (copy to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B and 7D for information) - Update on propagation modelling for WRC-27 agenda item 1.17
WP 3M
AI1.17
2025-06-09
[ 278 ]
Liaison statement to Working Parties 7C and 7D (copy to Working Parties 4A, 4C, 5A, 5B and 5C for information) - Update on propagation modelling for WRC-27 agenda item 1.18
WP 3M
AI1.18
2025-06-09
[ 277 ]
Liaison statement to Working Party 7C (copy to Working Parties 4A, 5A, 5B, 5C, 5D and 7B for information) - Update on propagation modelling for WRC-27 agenda item 1.19
WP 3M
AI1.19
2025-06-09
[ 276 ]
Reply liaison statement to Working Party 7C on WRC-27 agenda item 1.19 (copy to Working Parties 5A and 5B for information) - Technical and operational characteristics of FSS systems for sharing and compatibility studies on WRC-27 agenda item 1.19
WP 4A
AI1.19
2025-06-02
[ 275 ]
Additional information on the summary of conclusions of the 32nd meeting of the Radiocommunication Advisory Group for the attention of all ITU-R Study Groups and Working Parties
Director, BR
2025-05-23
[ 274 ]
+Ann.06(Rev.1)
Report on the thirty-third meeting of Working Party 5A (Geneva, 12-22 May 2025)
Chair, WP 5A
2025-05-21
[ 273 ]
Final list of participants - Working Party 5A (Geneva, 12-22 May 2025)
Director, BR
2025-05-21
[ 272 ]
Reply liaison statement to Working Parties 4B, 4C and 5A (copy for information to Study Groups 1, 5 and 7)
WP 4A
2025-05-20
[ 271 ]
Reply liaison statement to Working Parties 5A, 5B, 5C and 7C - WRC-27 agenda item 1.4
WP 4A
AI1.4
2025-05-20
[ 270 ]
Liaison statement from ITU-D Study Group 2 Question 2/2 to ITU-T Study Groups, ITU-R Working Parties and related organizations on final Report of Question 2/2 - ITU-D Study Group 2 Question 2/2: Enabling technologies for e-services and applications, including e-health and e-education
ITU-D SG2
2025-05-16
[ 269 ]
Liaison statement from ITU-D Study Group 1 Question 3/1 to ITU-T Study Groups, ITU-R Working Parties, APT ASTAP and ETSI on use of telecommunications/ICTs for disaster risk reduction and management - ITU-D Study Group 1 Question 3/1: The use of telecommunications/ICTs for disaster risk reduction and management
ITU-D SG1
2025-05-16
[ 268 ]
Liaison statement from ITU-D Study Group 2 Question 7/2 to ITU-T Study Group 5 and ITU-R Working Parties 1C, 4A, 5A 5B, 5C, 5D and 6A on the Question 7/2 2025 final Report - ITU-D Study Group 2 Question 7/2: Strategies and policies concerning human exposure to electromagnetic fields
ITU-D SG2
2025-05-16
[ 267 ]
Liaison statement to Working Parties 3L, 3M, 4A, 4B, 5A, 5B, 5C, 5D, 7B, 7C, and 7D regarding progress of work on WRC-27 agenda item 1.11
WP 4C
AI1.11
2025-05-12
[ 266 ]
Reply liaison statement on WRC-27 agenda item 1.18 to Working Party 7C (copy for information to Working Parties 4A, 5A and 5B)
WP 4C
AI1.18
2025-05-12
[ 265 ]
Reply liaison statement to Working Party 7D - (copy to Working Parties 3J, 3M, 4A, 5A, 5B and 5D for information) - Technical information to support studies under WRC-27 agenda item 1.16
WP 4C
AI1.16
2025-05-12
[ 264 ]
Utility radiocommunications Rapporteur Report
Utility Radiocommunications Liaison Rapporteur
2025-05-12
[ 263 ]
(Rev.3)
List of documents issued (Documents 5A/208 - 5A/263)
BR, Study Groups Department
2025-05-09
[ 262 ]
Inclusion of technical characteristics of broadband RLANS to the work within Working Party 5A
Mexico
2025-04-29
[ 261 ]
Additional technical and operational information on land mobile radio in UHF bands relevant to WRC-27 agenda item 1.13
Motorola Solutions Inc.
AI1.13
2025-04-30
[ 260 ]
Contribution to the preliminary draft revision of Report ITU-R M.2533-0 - Utility radiocommunications operating in the land-mobile service
Brazil
2025-04-30
[ 259 ]
Proposal to preliminary draft revision of the Recommendation ITU-R M.1042-3 - Disaster communications in the amateur and amateur-satellite services
Brazil
2025-04-30
[ 258 ]
Working document towards a preliminary draft revision of Recommendation ITU-R M.2057-1 - Systems characteristics of automotive radars operating in the frequency bands 76-81 GHz for intelligent transport systems applications
Netherlands (Kingdom of the)
2025-04-30
[ 257 ]
Revisions on working document towards a preliminary draft new Recommendation ITU-R M.[RSTT_FRQ]
Algeria
,
Bahrain
,
Jordan
,
Kuwait
,
Oman
,
Qatar
,
Tunisia
,
United Arab Emirates
2025-04-30
[ 256 ]
Preliminary draft modification of Report ITU-R M.2442-1 - Current and future usage of railway radiocommunication systems between train and trackside
Italy
Q263/5
2025-04-30
[ 255 ]
Liaison statement to ITU-R Working Parties 5A and 5C - Technical and operational characteristics in the frequency range 275 GHz to 450 GHz
Institute of Electrical and Electronics Engineers, Inc. (IEEE)
2025-04-29
[ 254 ]
Report on amateur and amateur satellite services
Liaison Rapporteur
2025-04-29
[ 253 ]
Public protection and disaster relief Rapporteur Report
PP Disaster Relief Liaison Rapporteur
2025-04-30
Resultados :302 documentos Resultados :
1 -
2 -
3 -
4 -
5 -
6 -
7
- Siguiente
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):