Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-R : WP5D.AR : Contribuciones  Nuevo -  Busque los documentos de la reunión
   
UIT-R WP5D.AR  C 

UIT-R WP5D.AR

Sistemas IMT

Resultados :112 documentos
Resultados :  1 - 2 - 3  - Siguiente Next
Contribuciones  [ Origen: Japan ]   Documents / Contributions
 
Número 
Título Origen AI/Cuestión
Fecha
[ 1289 ]  
 
Development of frequency arrangements for IMT based on the outcome of WRC-23     Japan     2024-01-19
[ 1288 ]  
 
Proposals on working document towards a preliminary draft new Report ITU-R M.[HIBS-CHARACTERISTICS]     Japan     2024-01-19
[ 1287 ]  
 
Proposed table of contents and detailed workplan for preliminary draft new report ITU-R M.[IMT-2030.TECH PERF REQ]     Japan     2024-01-19
[ 1286 ]  
 
Proposal on working structure of Working Party 5D for new study cycle     Japan     2024-01-19
[ 1275 ]  
 
Proposal on IMT-2030/001 (IMT-2030 background)     China (People's Republic of) , Japan , Korea (Republic of)     2024-01-18
[ 1213 ]  
 
Proposal on IMT-2030/001 (IMT-2030 Background)     China (People's Republic of) , Japan , Korea (Republic of)     2023-06-02
[ 1205 ]  
 
Proposal for draft summary of the status of the studies     Korea (Republic of) , China (People's Republic of) , Japan     2023-06-02
[ 1203 ]  
 
Proposal for a draft liaison statement to external organizations to inform the completion of a draft new Recommendation ITU-R M.[IMT.FRAMEWORK FOR 2030 AND BEYOND]     China (People's Republic of) , Japan , Korea (Republic of)     2023-06-02
[ 1202 ]  
 
Proposed modifications to preliminary draft revision of Recommendation ITU-R M.2070-1 and M.2071-1     Japan , China (People's Republic of) , Korea (Republic of)     2023-06-01
[ 1201 ]  
 
Proposed modification of a preliminary draft new Recommendation ITU-R M.[IMT. FRAMEWORK FOR 2030 AND BEYOND]     Japan     2023-06-01
[ 1200 ]  
 
Finalisation of final Note to the Director of the BR for the studies on RR NO. 21.5     Japan     2023-06-01
[ 1199 ]  
 
Finalization of draft revision of Recommendation ITU-R M.1036-6     Japan     2023-06-01
[ 1134 ]  
 
Proposed modification of working documents towards a preliminary draft new Recommendation ITU-R M.[IMT.VISION 2030 AND BEYOND]     Japan     2023-01-23
[ 1133 ]  
 
Study of path loss and cross polarization characteristics in indoor scenario towards a PDN Report ITU-R M.[IMT.ABOVE 100 GHZ]     Japan     2023-01-23
[ 1132 ]  
 
Transmission loss study in indoor scenario towards a PDN Report ITU-R M.[IMT.ABOVE 100 GHz]     Japan     2023-01-23
[ 1131 ]  
 
Proposed revision of a preliminary draft new Report ITU-R M.[IMT.ABOVE 100 GHZ]     Japan     2023-01-23
[ 1130 ]  
 
Building penetration loss study AT 2, 26, 97, and 158 GHz towards PDN Report ITU-R M.[IMT.ABOVE 100 GHZ]     Japan     2023-01-23
[ 1129 ]  
 
Proposed summary of Report ITU-R M.[IMT.ABOVE 100GHz] for Sub-Working Group Vision     Japan , Korea (Republic of)     2023-01-23
[ 1128 ]  
 
Proposed modifications to working documents towards preliminary draft revision of Recommendation ITU-R M.2071-1     Japan , China (People's Republic of) , Korea (Republic of)     2023-01-23
[ 1124 ]  
 
Finalization of draft revision of Recommendation ITU-R M.1036-6 - Frequency arrangements for implementation of the terrestrial component of International Mobile Telecommunications in the bands identified for IMT in the Radio Regulations     Japan     2023-01-23
[ 1014 ]  
 
Updated Annex 9 of the draft working document towards a PDN Report ITU-R M.[IMT.ABOVE 100 GHZ]     Japan     2022-09-30
[ 1013 ]  
 
Proposed modification of working document towards a preliminary draft new Recommendation ITU-R M.[IMT.VISION 2030 AND BEYOND] - IMT Vision - Framework and overall objectives of the future development of IMT for 2030 and beyond     Japan     2022-09-30
[ 1012 ]  
 
Proposed modifications to working documents towards preliminary draft revision of Recommendations ITU-R M.2070-1 and M.2071-1     Japan , China (People's Republic of) , Korea (Republic of)     2022-09-30
[ 1011 ]  
 
Proposals on working document towards draft CPM text on WRC-23 agenda item 1.4     Japan   AI1.4   2022-09-30
[ 1009 ]  
 
Proposed new technical analysis for studies on RR No.21.5     Japan     2022-09-30
[ 1008 ]  
 
Finalization of draft revision of Recommendation ITU-R M.1036-6 - Frequency arrangements for implementation of the terrestrial component of International Mobile Telecommunications in the bands identified for IMT in the Radio Regulations     Japan     2022-09-30
[ 1003 ]  
 
Proposal for the liaison statement to ITU-R Woking Parties 5A, 5C, 6A, 6B, 6C, and ITU-T Study Group 16     China (People's Republic of) , Japan , Korea (Republic of)     2022-09-30
[ 999 ]  
 
Proposals on draft summary of Report ITU-R M.[IMT.FUTURE TECHNOLOGY TRENDS OF TERRESTRIAL IMT SYSTEMS TOWARDS 2030 AND BEYOND] for SWG Vision     China (People's Republic of) , Japan , Korea (Republic of)     2022-09-30
[ 970 ]  
 
Proposal for updated timeline figure to a working document towards preliminary draft new Recommendation ITU-R M.[IMT.VISION 2030 AND BEYOND]     China (People's Republic of) , Japan , Korea (Republic of)     2022-09-29
[ 969 ]  
 
Proposal to the working document towards a preliminary draft new Report ITU-R M.[IMT.ABOVE 100 GHZ]     Japan , Korea (Republic of)     2022-09-29
[ 937 ]  
 
Proposed revision of Resolution ITU-R 56-2     China (People's Republic of) , Japan , Korea (Republic of)     2022-06-06
[ 932 ]  
 
Proposal to adopt option B as the overview timeline for IMT towards 2030 and beyond     China (People's Republic of) , Japan , Korea (Republic of)     2022-06-06
[ 927 ]  
 
Considerations on Resolution ITU-R 65     China (People's Republic of) , Japan , Korea (Republic of)     2022-06-06
[ 909 ]  
 
Proposed modification of working document towards a preliminary draft new Recommendation ITU-R M.[IMT.VISION 2030 AND BEYOND]     Japan     2022-06-06
[ 908 ]  
 
Path loss study in indoor scenario towards a PDN Report ITU-R M.[IMT.ABOVE 100 GHZ]     Japan     2022-06-06
[ 907 ]  
 
Updated Annex 5 of the draft working document towards a PDN Report ITU-R M.[IMT.ABOVE 100 GHZ]     Japan     2022-06-06
[ 906 ]  
 
Proposals on working document towards draft CPM text on WRC-23 agenda item 1.4     Japan   AI1.4   2022-06-06
[ 905 ]  
 
Proposals on Annex 4 of the working document towards sharing and compatibility studies of HIBS under WRC-23 agenda item 1.4     Japan   AI1.4   2022-06-06
[ 904 ]  
 
Proposals on Annex 3 of the working document towards sharing and compatibility studies of HIBS under WRC-23 agenda item 1.4     Japan   AI1.4   2022-06-06
[ 903 ]  
 
Proposals on Annex 2 of the working document towards sharing and compatibility studies of HIBS under WRC-23 agenda item 1.4     Japan   AI1.4   2022-06-06
[ 902 ]  
 
Proposals on Annex 1 of the working document towards sharing and compatibility studies of HIBS under WRC-23 agenda item 1.4     Japan   AI1.4   2022-06-06
[ 901 ]  
 
Proposals on Section 5 of the working document towards sharing and compatibility studies of HIBS under WRC-23 agenda item 1.4     Japan   AI1.4   2022-06-06
[ 900 ]  
 
Proposal on working document towards a preliminary draft new Report ITU-R M.[HIBS-CHARACTERISTICS]/Working document related to WRC-23 agenda item 1.4     Japan   AI1.4   2022-06-06
[ 899 ]  
 
Sharing study of the fixed satellite service (Earth-to-space) and IMT systems operating in the 7 025-7 125 MHz frequency band     Japan     2022-06-06
[ 898 ]  
 
Proposed modifications to Section 2.1.1 of the working document for the studies on RR No. 21.5     Japan     2022-06-06
[ 897 ]  
 
Proposed ways forward for the issues regarding the working document on RR No. 21.5 studies     Japan     2022-06-06
[ 810 ]  
 
Proposal for the works in preparation for RA-23     Korea (Republic of) , Japan     2022-06-03
[ 712 ]  
 
Proposed working method for the studies on RR No. 21.5 at Spectrum Aspects and WRC-23 Preparation WG meeting     Japan     2022-03-22
[ 711 ]  
 
Sharing study of the fixed-satellite service (Earth-to-space) and IMT systems operating in the 7 025-7 125 MHz frequency band     Japan     2022-03-22
[ 656 ]  
 
Proposed modification of working document towards a preliminary draft new Recommendation ITU-R M.[IMT.VISION 2030 AND BEYOND]     Japan     2022-01-31
Resultados :112 documentos
Resultados :  1 - 2 - 3  - Siguiente Next
 
Telecarga de múltiples documentos: Marcar las casillas correspondientes a los documentos seleccionados, a continuación pulsar "Telecargar"
   
 
Preferencias del usuario: 
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):
Páginas de navegación HTML  
Formatos  + Otros formatos
Idiomas (máximo 2)  + Multilingüe  
(E: inglés - F: francés - S: español - A: árabe - C: chino - R: ruso)

Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  Coordenador de Web UIT-R
Actualizado el : 2024-5-22