Contributions  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 199 ]
|
Reply liaison statement on the latest updates of access network transport (ANT) and home network transport (HNT) standards overviews and work plans
|
ITU-T SG15
|
|
2025-11-19 |
|
[ 198 ]
|
Liaison statement on approval of draft new Recommendation ITU-T J.157 - Functional requirements for secondary distribution of digital television and audiovisual content to portable devices using the wireless local area network
|
ITU-T SG21
|
|
2025-11-19 |
|
[ 197 ]
|
Liaison statement on the start of the new work item on the draft new Recommendation ITU-T J.ibs-sa - System architecture for IP broadcast services in cable television by using multiple-input-multiple-output (MIMO) in IMT-2020 radio system
|
ITU-T SG21
|
|
2025-11-19 |
|
[ 196 ]
|
Liaison statement on proposed draft new ITU-T Recommendation on guidance for assessing the environmental impact of radio spectrum utilization
|
ITU-T SG5
|
|
2025-11-13 |
|
[ 195 ]
|
Reply liaison statement on developments with low frequency powerline communications 5
|
ITU-T SG5
|
|
2025-11-12 |
|
[ 194 ]
|
Reply liaison statement to the Coordination Committee for Terminology (copy to ITU-T Study Groups 5, 13 and 15 and ITU-R Working Parties 5A, 5D, and 6A for information)
|
SG 4 Vocabulary Rapporteur
|
|
2025-11-07 |
|
[ 193 ]
|
Reply liaison statement to CCT (copy for information to Working Parties 1A, 4C, 5C and 6A)
|
WP 5D
|
|
2025-10-17 |
|
[ 192 ]
|
Reply liaison statement to ITU-R Working Party 6A - Addition of the "DTSB" abbreviation to the ITU Terms and Definitions database and request to provide a definition for this term
|
CCT
|
|
2025-10-16 |
|
[ 191 ]
|
Liaison statement to ITU-R Working Parties 4B, 4C, 5A, 5D and 6A (copy to ITU-T Study Groups 5, 13 and 15 for information) - Request for feedback on the term "multiple-input and multiple-output (MIMO)" and its definition developed by ITU-R Working Party 5C and submitted to the CCT for validation
|
CCT
|
|
2025-10-03 |
|
[ 190 ]
|
Reply liaison statement to Working Party 6A - Review of DTB documentation within the remit of Working Party 6B
|
WP 6B
|
|
2025-09-25 |
|
[ 189 ]
+Ch.1-5 |
Report of the meeting of Working Party 6A (Geneva, 2-10 September 2025)
|
Chair, WP 6A
|
|
2025-09-11 |
|
[ 188 ]
|
Final list of participants - Working Party 6A (Geneva, 2-10 September 2025)
|
Director, BR
|
|
2025-09-11 |
|
[ 187 ]
|
List of documents issued (Documents 6A/140 - 6A/187)
|
BR, Study Groups Department
|
|
2025-09-01 |
|
[ 186 ]
|
Report for Working Party 6A block meeting of September 2025
|
RG on SAB/SAP Issues
|
|
2025-09-01 |
|
[ 185 ]
|
Compiled Reports of the Study Group 6 Liaison Rapporteurs
|
Interim Chair, SG 6
|
|
2025-08-29 |
|
[ 184 ]
|
Rapporteur Group - Future of Broadcasting Progress Report March to August 2025 (copy to Working Parties 6A, 6B and 6C)
|
RG-FOB
|
|
2025-08-25 |
|
[ 183 ]
|
Working document towards a preliminary draft revision of Report ITU-R BT.2140 - Transition from analogue to digital terrestrial television broadcasting
|
Co-Chair, RG on Report ITU-R BT.2140
|
|
2025-08-25 |
|
[ 182 ]
|
Proposed liaison statement to Working Party 5B
|
British Broadcasting Corporation (BBC)
|
|
2025-08-21 |
|
[ 181 ]
|
Information on the frequency assignments to stations of terrestrial services other than broadcasting, recorded in the MIFR or in the process of being recorded, in the frequency bands between 470 MHZ and 960 MHZ
|
Director, BR
|
|
2025-08-21 |
|
[ 180 ]
|
Report on activity between March and September 2025
|
RG on ATSC 3.0
|
|
2025-08-21 |
|
[ 179 ]
|
Update on EMC related interference issues
|
Chair, RG on EMC and RF Noise
|
|
2025-08-19 |
|
[ 178 ]
|
Proposed revisions to working document towards a preliminary draft revision of Report ITU-R BT.2526-1 - Field trials of terrestrial multimedia mobile broadcasting systems
|
European Broadcasting Union
,
Broadcast Networks Europe
|
|
2025-08-19 |
|
[ 177 ]
|
Proposed revisions to working document towards a preliminary draft revision of Report ITU-R BT.2526-1 - Field trials of terrestrial multimedia mobile broadcasting systems
|
Korea (Rep. of)
,
RG on ATSC 3.0
|
Q132/6
|
2025-08-18 |
|
[ 176 ]
|
Preliminary draft revision of Report ITU-R BT.2343-10 - Collection of field trials of ultra-high definition television over digital terrestrial television broadcasting networks
|
Korea (Rep. of)
,
RG on ATSC 3.0
|
Q133-2/6
|
2025-08-18 |
|
[ 175 ]
|
Report of activities in the Rapporteur Group
|
RG on RF Hazard issues
|
|
2025-08-19 |
|
[ 174 ]
|
Proposed reply liaison statement from Working Party 6A to CISPR/H
|
British Broadcasting Corporation (BBC)
|
|
2025-08-18 |
|
[ 173 ]
+Ann.1-11 |
Report from Rapporteur Group
|
RG on DTB Doc review
|
|
2025-08-18 |
|
[ 172 ]
|
Liaison statement from CISPR/H to ITU-R Working Party 6A - Maintenance of the radio services database
|
IEC CISPR
|
|
2025-08-18 |
|
[ 171 ]
|
Working document towards a preliminary draft revision of Report ITU-R BT.2485-3 - Advanced network planning and transmission methods for enhancements of digital terrestrial television broadcasting
|
China
|
|
2025-08-14 |
|
[ 170 ]
|
Working document towards a draft new Report ITU-R BT.2526-1 - The 5G NR MBS trial in Anhui
|
China
|
|
2025-08-14 |
|
[ 169 ]
|
CDR single frequency network field test
|
Tsinghua University
,
Academy of Broadcasting Science, NRTA
|
|
2025-08-14 |
|
[ 168 ]
|
ITU Handbook on Spectrum Monitoring: ongoing revision to Chapter 5 section 5.2 - Broadcast monitoring
|
Rai Way S.p.A.
|
|
2025-08-13 |
|
[ 167 ]
|
Report of the Rapporteur Group on the revision of the Handbook - HF broadcasting system design
|
RG on Handbook
|
|
2025-08-14 |
|
[ 166 ]
|
Proposal for modifications to the working document towards preliminary draft revision of Recommendation ITU-R BT.1877-3 - Error-correction, data framing, modulation and emission methods and selection guidance for second generation digital terrestrial television broadcasting systems
|
India
|
|
2025-08-13 |
|
[ 165 ]
|
Progress Report - WRC-27 agenda items 1.6, 1.9, 1.10, 1.13 and 1.17
|
RG on WRC-27 related AIs
|
AI1.9, AI1.6, AI1.17, AI1.13, AI1.10
|
2025-08-12 |
|
[ 164 ]
|
Preliminary draft revision of Recommendation ITU-R BS.705-1 - HF transmitting and receiving antennas characteristics and diagrams
|
British Broadcasting Corporation (BBC)
|
|
2025-08-06 |
|
[ 163 ]
|
Report of the Correspondence Group on the CISPR Radio Services Database
|
CG on CISPR Radio Services Database
|
|
2025-08-08 |
|
[ 162 ]
|
Proposed revision of Recommendation ITU-R BT.1877-3 - Error-correction, data framing, modulation and emission methods and selection guidance for second generation digital terrestrial television broadcasting systems
|
Japan
|
Q133-1/6
|
2025-08-08 |
|
[ 161 ]
|
Answer of CENELEC TC219 to the request of ITU-R Working Party 6A on the developments with low frequency powerline communications
|
Director, BR
|
|
2025-08-08 |
|
[ 160 ]
|
Proposed preliminary draft revision of Report ITU-R BT.2299-3 - Broadcasting for public warning, disaster mitigation and relief
|
Brazil
|
Q118-1/6
|
2025-08-04 |
|
[ 159 ]
|
Proposed preliminary draft revision of Report ITU-R BT.2386-5 - Digital terrestrial broadcasting: Design and implementation of single frequency networks (SFN)
|
Brazil
|
|
2025-08-04 |
|
[ 158 ]
|
Proposed preliminary draft revision of Report ITU-R BT.2385-1 - Reducing the environmental impact of terrestrial broadcasting systems
|
Brazil
|
|
2025-08-04 |
|
[ 157 ]
|
Brazilian next-generation digital terrestrial television - (Information document)
|
Brazil
|
|
2025-08-04 |
|
[ 156 ]
|
Reply liaison statement on developments with low frequency powerline communications
|
SG 5
|
|
2025-06-30 |
|
[ 155 ]
|
Liaison statement to Working Party 6A - Monitoring of broadcast emissions
|
WP 1C
|
|
2025-06-25 |
|
[ 154 ]
|
Liaison statement to Working Party 6A - Revision of the Handbook - HF broadcasting system design
|
WP 3L
|
|
2025-06-10 |
|
[ 153 ]
|
Liaison statement to Working Party 5C (copy to Working Parties 4A, 4B, 4C, 5A, 5B, 6A, 7C and 7D for information) - Update on propagation modelling for WRC-27 agenda item 1.10
|
WP 3M
|
AI1.10
|
2025-06-10 |
|
[ 152 ]
|
Liaison statement to Working Party 4C (copy to Working Parties 4A, 4B, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D for information) - Update on propagation modelling for WRC-27 agenda items 1.11, 1.12, 1.13 and 1.14
|
WP 3M
|
AI1.14, AI1.13, AI1.12, AI1.11
|
2025-06-10 |
|
[ 151 ]
|
Liaison statement to Working Party 7C (copy to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B and 7D for information) - Update on propagation modelling for WRC-27 agenda item 1.17
|
WP 3M
|
AI1.17
|
2025-06-09 |
|
[ 150 ]
|
Liaison statement to CCT (copy to Working Parties 5C and 6A) regarding terms and definitions developed within PDN Report ITU-R M.[AUDIO-PMSE_LMS]
|
WP 5A
|
|
2025-06-05 |
Results:199 total items. Result page:
1 -
2 -
3 -
4
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):