Number |
Date
|
Source
|
Title
|
Questions
|
|
Number |
Posted |
Size
|
|
|
|
[ 191 ]
|
2025-10-03 |
CCT
|
Liaison statement to ITU-R Working Parties 4B, 4C, 5A, 5D and 6A (copy to ITU-T Study Groups 5, 13 and 15 for information) - Request for feedback on the term "multiple-input and multiple-output (MIMO)" and its definition developed by ITU-R Working Party 5C and submitted to the CCT for validation
|
N/A
|
|
[ 191 ] - English - Word |
2025-10-03 [16:03]
|
40'720 bytes |
|
|
[ 189 ]
|
2025-09-11 |
Chair, WP 6A
|
Report of the meeting of Working Party 6A (Geneva, 2-10 September 2025)
|
N/A
|
|
[ 189 ] - English - Word |
2025-10-06 [11:04]
|
49'874 bytes |
Chair's Report of the meeting of Working Party 6A (2 - 10 September 2025)
|
|
[ 189 ] Chapter 5 - English - Word |
2025-09-30 [08:49]
|
51'350 bytes |
Meeting Report from Sub-Working Group 6A-5 (Other issues)
|
|
[ 189 ] Chapter 4 - English - Word |
2025-09-30 [08:44]
|
56'365 bytes |
Meeting Report from Sub-Working Group 6A-3 (Protection)
|
|
[ 189 ] Chapter 3 - English - Word |
2025-09-30 [08:34]
|
55'433 bytes |
Meeting Report from Sub-Working Group 6A-3 (WRC-27 agenda items and sharing)
|
|
[ 189 ] Chapter 2 - English - Word |
2025-09-30 [08:29]
|
52'579 bytes |
Meeting Report from Sub-Working Group 6A-2 (Sound and Multimedia)
|
|
[ 189 ] Chapter 1 - English - Word |
2025-09-30 [08:19]
|
75'538 bytes |
Meeting Report from Sub-Working Group 6A-1 (Television)
|
|
[ 189 ] Chapter 1 - Annex 3 - English - Word |
2025-09-24 [08:09]
|
30'119'794 bytes |
Preliminary draft revision of Report ITU-R BT.2140-14 - Transition from analogue to digital terrestrial television broadcasting
|
|
[ 189 ] Chapter 1 - Annex 2 - English - Word |
2025-09-23 [16:48]
|
876'888 bytes |
Preliminary draft revision of Report ITU-R BT.2485-3 - Advanced network planning and transmission methods for enhancements of digital terrestrial television broadcasting
|
|
[ 189 ] Chapter 3 - Annex 17 - English - Word |
2025-09-23 [16:35]
|
42'169 bytes |
Note to the Director, Radiocommunication Bureau - Information on the frequency assignments to stations of terrestrial services other than broadcasting, recorded in the MIFR or in the process of being recorded, in the frequency bands between 470 MHz and 960 MHz
|
|
[ 189 ] Chapter 5 Annex 18 Part 1 - English - Excel 2007 |
2025-09-23 [16:31]
|
102'113 bytes |
|
|
[ 189 ] Chapter 5 - Annex 18 - English - Word |
2025-09-23 [16:31]
|
142'612 bytes |
Note from Working Party 6A to Radiocommunication Bureau (BR) - ITU ENG/PMSE database
|
|
[ 189 ] Chapter 1 - Annex 7 - English - Word |
2025-09-23 [16:09]
|
53'269 bytes |
Working document towards a preliminary draft revision of Recommendation ITU-R BT.1306-8 - Error correction, data framing, modulation and emission methods for digital terrestrial television broadcasting
|
|
[ 189 ] Chapter 2 - Annex 14 - English - Word |
2025-09-23 [15:57]
|
21'301'796 bytes |
Preliminary draft revision of Report ITU-R BS.2384 - Implementation considerations for the introduction and transition to digital terrestrial sound and multimedia broadcasting
|
|
[ 189 ] Chapter 1 - Annex 4 - English - Word |
2025-09-23 [15:41]
|
47'525 bytes |
Working document towards a preliminary draft revision of Recommendation ITU-R BT.1368-13 - Planning criteria, including protection ratios, for digital terrestrial television
services in the VHF/UHF bands
|
|
[ 189 ] Chapter 3 - Annex 16 - English - Word |
2025-09-23 [15:32]
|
114'356 bytes |
WRC-23 Resolutions related to broadcasting services and other services - Updated information of Document 6A/181, from Radiocommunication Bureau
|
|
[ 189 ] Chapter 3 - Annex 15 - English - Word |
2025-09-23 [14:34]
|
47'138 bytes |
Annex to the Chair's Report - Continuation of Rapporteur Group to undertake WRC-27 studies related to Working Party 6A
|
|
[ 189 ] Chapter 2 - Annex 11 - Part 1 - English - Word |
2025-09-23 [14:18]
|
14'401'536 bytes |
|
|
[ 189 ] Chapter 1 - Annex 9 - English - Word |
2025-09-23 [14:17]
|
43'563 bytes |
Proposed revision to the Terms of Reference for the Working Party 6A Rapporteur Group to review Study Group 6 documentation on digital terrestrial broadcasting systems
|
|
[ 189 ] Chapter 1 - Annex 8 - English - Word |
2025-09-23 [14:16]
|
47'928 bytes |
Working document towards a preliminary draft revision of Recommendation ITU-R BT.2016-4 - Error-correction, data framing, modulation and emission methods for terrestrial multimedia broadcasting for mobile reception using handheld receivers in VHF/UHF bands
|
|
[ 189 ] Chapter 2 - Annex 11 - English - Word |
2025-09-23 [14:16]
|
12'533'805 bytes |
Working document towards a preliminary draft revision of ITU-R Handbook - HF broadcasting system design
|
|
[ 189 ] Chapter 1 - Annex 10 - English - Word |
2025-09-23 [14:14]
|
43'324 bytes |
Proposed continuation of the "Rapporteur Group on revision of ITU-R texts to include ATSC 3.0"
|
|
[ 189 ] Chapter 2 - Annex 13 - English - Word |
2025-09-23 [14:13]
|
61'246 bytes |
Working document towards a preliminary revision of Recommendation ITU-R BS.774-4 - Service requirements for digital sound broadcasting to vehicular, portable and fixed receivers using terrestrial transmitters in the VHF/UHF bands
|
|
[ 189 ] Chapter 2 - Annex 12 - English - Word |
2025-09-23 [13:46]
|
42'519 bytes |
Terms of Reference for Rapporteur Group on the revision of the Handbook "HF Broadcasting System Design"
|
|
[ 189 ] Chapter 1 - Annex 6 - English - Word |
2025-09-23 [13:22]
|
103'679 bytes |
Preliminary draft revision of Recommendation ITU-R BT.1877-3 - Error-correction, data framing, modulation and emission methods and selection guidance for second generation digital terrestrial television broadcasting systems
|
|
[ 189 ] Chapter 1 - Annex 5 - English - Word |
2025-09-23 [11:57]
|
1'855'643 bytes |
Preliminary draft revision of Report ITU-R BT.2343-10 - Collection of field trials of ultra high definition television over digital terrestrial television broadcasting networks
|
|
[ 189 ] Chapter 1 - Annex 1 - English - Word |
2025-09-23 [10:41]
|
47'782 bytes |
Preliminary draft revision of Report ITU-R BT.2386-5 - Digital terrestrial broadcasting: Design and implementation of single frequency networks (SFN)
|
|
[ INF 2 ]
|
2024-07-05 |
Interim Chair, SG 6
|
Functions of the Study Group 6 Vice-Chairs and Working Parties Chairs
|
N/A
|
|
[ INF 2 ] Revision 4 - English - Word |
2025-09-26 [11:22]
|
60'164 bytes |
|
|
[ 190 ]
|
2025-09-25 |
WP 6B
|
Reply liaison statement to Working Party 6A - Review of DTB documentation within the remit of Working Party 6B
|
N/A
|
|
[ 190 ] - English - Word |
2025-09-26 [11:26]
|
46'383 bytes |
|
|
[ ADM 29 ]
|
2025-09-10 |
SG 6 & Wps 6A, 6B & 6C
|
Provisional schedules of 2026/2027 meetings of
Study Group 6 and its Working Parties
|
N/A
|
|
[ ADM 29 ] Revision 1 - English - Word |
2025-09-11 [10:55]
|
34'364 bytes |
|
|
[ 188 ]
|
2025-09-11 |
Director, BR
|
Final list of participants - Working Party 6A (Geneva, 2-10 September 2025)
|
N/A
|
|
[ 188 ] - English - PDF (acrobat) |
2025-09-11 [08:16]
|
150'648 bytes |
|
|
[ ADM 30 ]
|
2025-09-10 |
Chair, WP 6A
|
Draft agenda for the closing Plenary meeting of Working Party 6A - Wednesday, 10 September 2025, from 1400 to 1515 and from 1545 to1700 hours (Geneva time) (Physical meeting with remote participation)
(Room Popov, Tower)
|
N/A
|
|
[ ADM 30 ] Revision 1 - English - Word |
2025-09-10 [13:23]
|
42'042 bytes |
|
|
[ ADM 28 ]
|
2025-09-09 |
Chair, WP 6A
|
Draft Agenda for the Third Plenary Meeting of Working Party 6A - Tuesday, 9 September 2025, from 1545 to1700 hours (Geneva time) (Physical meeting with remote participation)
(Room Popov, Tower)
|
N/A
|
|
[ ADM 28 ] - English - Word |
2025-09-09 [13:43]
|
39'542 bytes |
|
|
[ ADM 23 ]
|
2025-08-28 |
SG 6, WPs 6A, 6B & 6C
|
Tentative schedule for Working Parties 6A, 6B and 6C, and Study Group 6
|
N/A
|
|
[ ADM 23 ] Revision 4 - English - Word |
2025-09-08 [10:36]
|
47'499 bytes |
|
|
[ ADM 25 ]
|
2025-08-29 |
Chair, WP 6A
|
Work structure and assignment of documents
|
N/A
|
|
[ ADM 25 ] Revision 3 - English - Word |
2025-09-05 [12:00]
|
37'064 bytes |
|
|
[ ADM 27 ]
|
2025-09-05 |
Chair, WP 6A
|
Draft agenda for the second Plenary meeting of Working Party 6A Friday, 5 September 2025, 1045-1110 hours (Geneva time)
(Room H, Montbrillant)
|
N/A
|
|
[ ADM 27 ] - English - Word |
2025-09-05 [10:00]
|
33'765 bytes |
|
|
[ 187 ]
|
2025-09-01 |
BR, Study Groups Department
|
List of documents issued (Documents 6A/140 - 6A/187)
|
N/A
|
|
[ 187 ] - English - Word |
2025-09-01 [09:04]
|
43'691 bytes |
|
|
[ 186 ]
|
2025-09-01 |
RG on SAB/SAP Issues
|
Report for Working Party 6A block meeting of September 2025
|
N/A
|
|
[ 186 ] Part 1 - English - Excel 2007 |
2025-09-01 [09:08]
|
102'076 bytes |
|
|
[ 186 ] - English - Word |
2025-09-01 [09:08]
|
139'734 bytes |
|
|
[ ADM 26 ]
|
2025-08-29 |
Chair, WP 6A
|
Draft agenda for the first Plenary meeting of Working Party 6A - Tuesday, 2 September 2025, 0930 to 1045 hours (Geneva time) (Physical meeting with remote participation) (Room H, Montbrillant)
|
N/A
|
|
[ ADM 26 ] Revision 1 - English - Word |
2025-09-01 [08:52]
|
40'766 bytes |
|
|
[ ADM 24 ]
|
2025-08-29 |
Interim Chair, SG 6
|
Proposed treatment of contributions submitted to multiple Working Parties
|
N/A
|
|
[ ADM 24 ] - English - Word |
2025-08-29 [15:41]
|
37'664 bytes |
|
|
[ 185 ]
|
2025-08-29 |
Interim Chair, SG 6
|
Compiled Reports of the Study Group 6 Liaison Rapporteurs
|
N/A
|
|
[ 185 ] Part 4 - English - Word |
2025-08-29 [10:49]
|
58'418 bytes |
|
|
[ 185 ] Part 3 - English - Word |
2025-08-29 [10:49]
|
48'600 bytes |
|
|
[ 185 ] Part 2 - English - Word |
2025-08-29 [10:48]
|
45'075 bytes |
|
|
[ 185 ] Part 1 - English - Word |
2025-08-29 [10:48]
|
469'977 bytes |
|
|
[ 185 ] - English - Word |
2025-08-29 [10:48]
|
655'615 bytes |
|
|
[ INF 6 ]
|
2025-08-26 |
BR, Study Groups Department
|
Guidelines on the management of fully virtual meetings and
physical meetings with remote participation
|
N/A
|
|
[ INF 6 ] - English - Word |
2025-08-27 [09:36]
|
43'683 bytes |
|
|
[ INF 5 ]
|
2025-08-26 |
BR Study Groups Department
|
Meetings of Working Parties 6A, 6B and 6C, and Study Group 6 (Geneva, 1-12 September 2025)
|
N/A
|
|
[ INF 5 ] Part 1 - English - PowerPoint 2007 |
2025-08-26 [16:05]
|
4'450'148 bytes |
|
|
[ INF 5 ] - English - Word |
2025-08-26 [16:05]
|
5'178'714 bytes |
|
|
[ 184 ]
|
2025-08-25 |
RG-FOB
|
Rapporteur Group - Future of Broadcasting Progress Report March to August 2025 (copy to Working Parties 6A, 6B and 6C)
|
N/A
|
|
[ 184 ] - English - Word |
2025-08-25 [17:07]
|
39'582 bytes |
|
Results: 91 total items.
Result Page:
1 -
2
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):