International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-R : R23-WP5D : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R R23-WP5D  C 

ITU-R R23-WP5D

IMT Systems

Results:29 total items.
Contributions  [ Source: Director, BR ]   Documents / Contributions
 
Number 
Title Source Date
[ 791 ]  
 
Final list of participants - Working Party 5D (Kobe, Japan, 24 June - 3 July 2025)     Director, BR   2025-07-03
[ 785 ]  
(Rev.1) 
Assignment of documents for Working Party 5D #49     Director, BR   2025-06-18
[ 640 ]  
(Rev.1) 
Contribution to Working Party 5D - Minimum requirements related to technical performance for IMT-2030 radio interface(s)     Director, BR   2025-06-11
[ 616 ]  
 
Response to ITU-R Working Party 5D on minimum requirements related to technical performance for IMT-2030 radio interface(s)     Director, BR   2025-06-06
[ 606 ]  
 
Additional information on the summary of conclusions of the 32nd meeting of the Radiocommunication Advisory Group for the attention of all ITU-R Study Groups and Working Parties     Director, BR   2025-05-23
[ 573 ]  
 
Reply liaison statement on parameters for 14 800 to 15 350 MHz of terrestrial component of IMT for sharing and compatibility studies in preparation for WRC-27     Director, BR   2025-03-17
[ 562 ]  
 
Final list of participants - Working Party 5D (Geneva, 4-13 February 2025)     Director, BR   2025-02-13
[ 561 ]  
 
Contribution to Working Party 5D minimum requirements related to technical performance for IMT-2030 radio interface(s)     Director, BR   2025-02-03
[ 560 ]  
 
Additional information on the preparation of texts for the draft CPM Report to WRC-27     Director, BR   2025-01-30
[ 556 ]  
 
Correspondence received regarding Revision 3 of Recommendation ITU-R M.2150 - ("Form A")     Director, BR   2025-01-27
[ 555 ]  
 
Correspondence received regarding the updates of Recommendation ITU-R M.2012 to Revision 7 and Recommendation ITU-R M.2150 to Revision 3 - ("Certification B")     Director, BR   2025-01-27
[ 554 ]  
 
Final evaluation Report from 5GIF IEG on the candidate technology towards Revision-3 of IMT-2020     Director, BR   2025-01-27
[ 553 ]  
 
Contribution to ITU-R Working Party 5D liaison statement to external organizations minimum requirements related to technical performance for IMT-2030 radio interface(s)     Director, BR   2025-01-27
[ 552 ]  
 
Reply liaison statement to external organizations, minimum requirements related to technical performance for IMT-2030 radio interface(s)     Director, BR   2025-01-24
[ 457 ]  
 
Final evaluation Report from ARIB IMT-2020 evaluation group on the IMT-2020 proposal in Document IMT-2020/89 by "Nufront" in the IMT-2020 evaluation process     Director, BR   2025-01-22
[ 428 ]  
 
Reply liaison statement on parameters for 14 800 to 15 350 MHz of terrestrial component of IMT for sharing and compatibility studies in preparation for WRC-27     Director, BR   2024-12-05
[ 412 ]  
 
Final list of participants - Working Party 5D (Geneva, 3-11 October 2024)     Director, BR   2024-10-11
[ 391 ]  
 
Interim evaluation report from 5GIF IEG on the candidate technology towards Revision-3 of IMT-2020     Director, BR   2024-09-21
[ 352 ]  
 
Interim evaluation Report from ARIB IMT-2020 evaluation group on the IMT-2020 proposal in document IMT-2020/89 by "Nufront" in the IMT-2020 evaluation process     Director, BR   2024-09-20
[ 269 ]  
 
Reply liaison statement on Parameters for 7 125 to 8 400 MHz of terrestrial component of IMT for sharing and compatibility studies in preparation for WRC-27     Director, BR   2024-09-05
[ 254 ]  
(Rev.1) 
Information of frequency assignments in the 4 500-4 800 MHz frequency band in accordance with RR Appendix 30B     Director, BR   2024-08-16
[ 253 ]  
 
Preliminary draft new Recommendation ITU-R M.[IMT-2020.UNWANT.MS] and preliminary draft new Recommendation ITU-R M.[IMT-2020.UNWANT.BS]     Director, BR   2024-08-14
[ 241 ]  
 
Final list of participants - Working Party 5D (Geneva, 25 June - 2 July 2024))     Director, BR   2024-07-02
[ 192 ]  
 
Reply-liaison statement to ITU-R Working Party 5D, on their recent publication - ITU-R Framework and overall objectives of the future development of IMT for 2030 and beyond     Director, BR   2024-06-13
[ 136 ]  
 
Liaison statement on parameters for 4 400 to 4 800 MHz of terrestrial component of IMT for sharing and compatibility studies in preparation for WRC-27     Director, BR   2024-06-04
[ 79 ]  
 
Reply liaison statement to Working Party 5D, on their recent publication - ITU-R Framework and overall objectives of the future development of IMT for 2030 and beyond     Director, BR   2024-03-11
[ 76 ]  
 
Final list of participants - Working Party 5D (Geneva, 31 January - 7 February 2024))     Director, BR   2024-02-07
[ 75 ]  
 
Correspondence received from Nufront proponent - Relevant business matters and intellectual property rights (IPR)     Director, BR   2024-01-31
[ 74 ]  
 
Text from WRC-23 Plenary for the attention of the ITU-R Working Parties that are either responsible for or contributing to studies relevant to items of the WRC-27 agenda or the WRC-31 preliminary agenda     Director, BR   2024-01-30
Results:29 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2025-7-21