Contributions  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 269 ]
|
Liaisons statement on development of a new ITU-R Handbook on fixed wireless systems
|
ITU-T SG21
|
|
2025-11-19 |
|
[ 268 ]
|
Reply liaison statement on the latest updates of access network transport (ANT) and home network transport (HNT) standards overviews and work plans
|
ITU-T SG15
|
|
2025-11-19 |
|
[ 267 ]
|
Reply liaison statement on the development of a new ITU-R Handbook on fixed wireless systems
|
ITU-T SG15
|
|
2025-11-18 |
|
[ 266 ]
(Rev.3) |
List of documents issued and assignments for Working Party 5C #33 - (Documents 5C/206 - 5C/266)
|
BR, Study Groups Department
|
|
2025-11-12 |
|
[ 265 ]
|
Reply liaison statement to Working Parties 5A, 5B, 5C and 7C - WRC-27 agenda item 1.4
|
WP 4A
|
AI1.4
|
2025-11-12 |
|
[ 264 ]
|
Liaison statement on G.fso
|
ITU-T SG15
|
|
2025-11-07 |
|
[ 263 ]
|
Proposed FS elevation angle for non-GSO sharing studies under WRC-27 agenda item 1.10
|
Kenya
,
Nigeria
|
AI1.10
|
2025-11-05 |
|
[ 262 ]
|
Working document on sharing studies under WRC-27 agenda item 1.10
|
Tonga
|
AI1.10
|
2025-11-05 |
|
[ 261 ]
|
Working document on sharing studies under WRC-27 agenda item 1.10 - Report non-GSO-GSO
|
United States
|
AI1.10
|
2025-11-05 |
|
[ 260 ]
|
Working document on sharing studies under WRC-27 agenda item 1.10 - FS parameter
|
United States
|
AI1.10
|
2025-11-05 |
|
[ 259 ]
|
Calculation of fractional degradation of performance (FDP) over smooth earth and over random terrain
|
United States
|
|
2025-11-05 |
|
[ 258 ]
|
Working document towards draft CPM text for WRC-27 agenda item 1.10
|
United States
|
AI1.10
|
2025-11-05 |
|
[ 257 ]
|
Working document on sharing studies under WRC-27 agenda item 1.10 - Report GSO
|
United States
|
AI1.10
|
2025-11-05 |
|
[ 256 ]
|
Proposal to revision of Report ITU-R F.2323-2 - Fixed service use and future trends
|
China
|
|
2025-11-05 |
|
[ 255 ]
|
Sharing study between non-GSO space station and FS station in WRC-27 agenda item 1.10
|
China
|
AI1.10
|
2025-11-05 |
|
[ 254 ]
|
Sharing study between GSO space station and FS station in WRC-27 agenda item 1.10
|
China
|
AI1.10
|
2025-11-05 |
|
[ 253 ]
|
Sharing study between FSS/MSS earth station and FS station under WRC-27 agenda item 1.10
|
China
|
AI1.10
|
2025-11-05 |
|
[ 252 ]
|
Elevation angle of FS station for sharing study in WRC-27 agenda item 1.10
|
China
|
AI1.10
|
2025-11-05 |
|
[ 251 ]
|
Working document towards preliminary draft revision of Recommendation ITU-R F.1571 - Mitigation techniques for use in reducing the potential for interference between airborne stations in the radionavigation service and stations in the fixed service in the band 31.8-33.4 GHz
|
France
|
|
2025-11-04 |
|
[ 250 ]
|
Working document towards preliminary draft new Report ITU-R F.[SHARING_STUDY_FS_ARNS] - Coexistence study between airborne stations in the radionavigation service and stations in the fixed service in the band 31.8-33.4 GHz
|
France
|
|
2025-11-04 |
|
[ 249 ]
|
Revision of working document on sharing studies under WRC-27 agenda item 1.10
|
Russian Federation
|
AI1.10
|
2025-11-05 |
|
[ 248 ]
|
Considerations on some points in regard to WRC-27 agenda item 1.10
|
Russian Federation
|
AI1.10
|
2025-11-05 |
|
[ 247 ]
|
Proposed revision of Recommendation ITU-R F.746-11 - Radio-frequency arrangements for fixed service systems
|
Japan
|
|
2025-11-04 |
|
[ 246 ]
|
Proposed suppression of Recommendation ITU-R F.2004 - Radio-frequency channel arrangements for fixed service systems operating in the 92-95 GHz range
|
Japan
|
|
2025-11-04 |
|
[ 245 ]
|
Proposal for working document towards a preliminary draft revision of Report ITU-R F.2416-1 - Technical and operational characteristics and applications of the point-to-point fixed service applications operating in the frequency band 275-450 GHz
|
Japan
|
Q257-2/5
|
2025-11-04 |
|
[ 244 ]
|
Proposed modification to working document towards a preliminary draft new Report ITU-R F.[FS.CHAR.450-1 000 GHZ] - Technical and operational characteristics of the fixed service applications operating in the frequency range 450-1 000 GHz
|
Japan
|
Q257-2/5
|
2025-11-04 |
|
[ 243 ]
|
Working document towards preliminary draft new Recommendation ITU-R F.[OPPORTUNISTIC_WEATHER_MONITORING] - Fixed line-of-sight link performance data collection for opportunistic weather monitoring
|
Politecnico di Milano Dipartimento di Elettronica, Informazion e Biongegneria
|
|
2025-11-04 |
|
[ 242 ]
|
Typical FS link values in E-band for inclusion in the preliminary draft revision of Recommendation ITU-R F.2086-0
|
Switzerland
|
|
2025-11-03 |
|
[ 241 ]
|
Working document on sharing studies under WRC-27 agenda item 1.10
|
India
|
AI1.10
|
2025-11-03 |
|
[ 240 ]
|
Working document towards draft CPM text for WRC-27 agenda item 1.10
|
Canada
|
AI1.10
|
2025-10-28 |
|
[ 239 ]
|
Proposed modifications to working document on sharing studies under WRC-27 agenda item 1.10
|
Canada
|
AI1.10
|
2025-10-28 |
|
[ 238 ]
|
Proposed modifications to the working document on sharing studies under WRC-27 agenda item 1.10
|
United Kingdom
|
AI1.10
|
2025-10-27 |
|
[ 237 ]
|
Reply liaison statement to Working Party 5C - Interference assessment, including coordination, of stations in the fixed service with IMT stations in the frequency band 6 425-7 125 MHz
|
WP 5D
|
|
2025-10-21 |
|
[ 236 ]
|
Reply liaison statement to CCT (copy for information to Working Parties 1A, 4C, 5C and 6A)
|
WP 5D
|
|
2025-10-17 |
|
[ 235 ]
|
Liaison statement to ITU-R Working Parties 5A and 5C - Editorial comments on terms and definitions submitted by ITU-R Working Party 5A and included in preliminary draft new Report ITU-R M.[Audio-PMSE_LMS]
|
CCT
|
|
2025-10-16 |
|
[ 234 ]
|
Liaison statement to Working Parties 4A and 5C regarding progress of work on WRC-27 agenda item 1.18
|
WP 7C
|
AI1.18
|
2025-09-29 |
|
[ 233 ]
|
Liaison statement to Working Parties 4A, 5A, 5C, 5D and 7B - EESS (passive) studies in the 6 425-7 250 MHz range
|
WP 7C
|
|
2025-09-26 |
|
[ 232 ]
|
Liaison statement to ITU-R Working Parties 3J, 4A, 4C, 5A, 5B, 5C, 5D, 7A, 7C and 7D - Progress of activities relating to WRC-27 agenda item 1.15
|
WP 7B
|
AI1.15
|
2025-09-26 |
|
[ 231 ]
|
Liaison statement to ITU-R Working Parties 4A, 4C, 5B and 5C - Relevant technical information to support studies under WRC-27 agenda item 1.15
|
WP 7B
|
AI1.15
|
2025-09-26 |
|
[ 230 ]
|
Elevation angles of fixed services for studies under WRC-27 agenda item 1.10
|
United Kingdom
|
AI1.10
|
2025-09-25 |
|
[ 229 ]
|
Considerations on short term protection criteria
|
Netherlands (Kingdom of the)
,
Slovenia
|
|
2025-09-16 |
|
[ 228 ]
|
Liaison statement to Working Party 5B (copy to Working Parties 3L, 5C, and 7A) - Clarification of parameters for the protection of the HF Broadcasting service relative to WRC-27 agenda item 1.9
|
WP 6A
|
AI1.9
|
2025-09-16 |
|
[ 227 ]
|
Reply liaison statement to Working Party 5A (copy to Working Party 5C for information) - Working document towards a preliminary draft new Report ITU-R M.[AUDIO-PMSE_LMS]
|
WP 6A
|
|
2025-09-16 |
|
[ 226 ]
|
Note to the Chair of ITU-R Working Parties 5A, 5B, 5C and 5D copy to ITU-R Study Group 5 - Consideration of received liaison statement from TSAG on the activities and studies on sustainable digital transformation
|
Chair, SG 5
|
|
2025-09-12 |
|
[ 225 ]
|
Reply liaison statement on free-space optics systems related aspects for G.fso
|
ITU-T SG15
|
|
2025-07-23 |
|
[ 224 ]
|
Reply liaison statement to ITU-T Study Group 15 Question 6/15 (copy to ITU-R Working Parties 3M and 5C) - Free-space optics systems related aspects for G.fso
|
WP 1A
|
|
2025-06-25 |
|
[ 223 ]
|
Reply liaison statement to Working Party 5B (copy for information to Working Parties 1B, 4A, 4C, 5A, 5C and 5D) - The On-Tune Rejection (OTR) in Recommendation ITU-R SM.337 and Recommendation ITU-R M.1461
|
WP 1A
|
|
2025-06-19 |
|
[ 222 ]
|
Liaison statement to Working Party 4A (copy to Working Parties 5A, 5C, 7C and 7D for information) - Update on propagation modelling for WRC-27 agenda item 1.3
|
WP 3M
|
AI1.3
|
2025-06-10 |
|
[ 221 ]
|
Liaison statement to Working Party 4A (copy to Working Parties 4B, 5A, 5B, 5C and 7C for information) - Update on propagation modelling for WRC-27 agenda item 1.4
|
WP 3M
|
AI1.4
|
2025-06-10 |
|
[ 220 ]
|
Liaison statement to Working Party 5D (copy to Working Parties 4A, 4C, 5A, 5B, 5C, 7B, 7C and 7D for information) - Update on propagation modelling for WRC-27 agenda item 1.7
|
WPs 3K and 3M
|
AI1.7
|
2025-06-10 |
Results:269 total items. Result page:
1 -
2 -
3 -
4 -
5 -
6
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):