International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-R : R23-WP5C Recently posted -  Search Meeting Documents
   
ITU-R R23-WP5C Meeting Documents
  Max # of documents displayed/page:
Results: 61 total items.
Result Page:  1 - 2  - Next
Number  Date Source Title Questions 
  Number  Posted Size    
 
[ ADM 76 ]  2026-05-13 WP 5C   Draft schedule for the 34th meeting of Working Party 5C (18-29 May 2026)     N/A  
  [ ADM 76 ] Revision 7 - English -  Word 2026-05-27 [12:50]  51'747  bytes  
 
[ TD 155 ]  2026-05-27 Chair, WG 5C-3   Annex X to Working Party 5C Chair's Report - Meeting Report of Working Group 5C-3 - WG General Aspects and HF Systems     N/A  
  [ TD 155 ]  - English -  Word 2026-05-27 [12:25]  42'196  bytes  
 
[ TD 154 ]  2026-05-27 WG 5C-3   Annex XX to Working Party 5C Chair's report - List of texts assigned to Working Party 5C     N/A  
  [ TD 154 ]  - English -  Word 2026-05-27 [08:50]  156'947  bytes  
 
[ TD 153 ]  2026-05-27 WP 5C   Draft reply liaison statement to Working Party 7C on WRC-27 agenda item 1.18 (resolves 1)     AI1.18  
  [ TD 153 ]  - English -  Word 2026-05-27 [08:41]  35'876  bytes  
 
[ TD 152 ]  2026-05-27 WG 5C-2   Annex XX to Working Party 5C Chair's Report - Working document towards preliminary draft new Report ITU-R F.[SHARING_STUDY_FS_ARNS] - Coexistence study between airborne stations in the radionavigation service and stations in the fixed service in the band 31.8-33.4 GHz     N/A  
  [ TD 152 ]  - English -  Word 2026-05-27 [08:28]  7'325'512  bytes  
 
[ TD 151 ]  2026-05-27 WG 5C-3   Work plans for individual deliverables - Work plan for the revision of Recommendation ITU-R F.1245 - Mathematical model of average and related radiation patterns for point-to-point fixed wireless system antennas for use in interference assessment in the frequency range from 1 GHz to 86 GHz     N/A  
  [ TD 151 ]  - English -  Word 2026-05-27 [08:16]  46'909  bytes  
 
[ ADM 90 ]  2026-05-26 Chair, WG 5C-1   Draft agenda for the seventh meeting of Working Group 5C-1 Spectrum, applications and technology aspects - Wednesday, 27 May 2026 at 0900 hours (Geneva time) (Room C1, ITU Tower)     N/A  
  [ ADM 90 ]  - English -  Word 2026-05-26 [14:39]  62'678  bytes  
 
[ 319 ]  2026-05-13 BR, Study Groups Department   List of documents issued and assignments for Working Party 5C #34 - (Documents 5C/271 - 5C/320)     N/A  
  [ 319 ] Revision 2 - English -  Word 2026-05-25 [16:08]  50'976  bytes  
 
[ ADM 89 ]  2026-05-25 Chair, WG 5C-1   Draft agenda for the sixth meeting of Working Group 5C-1 Spectrum, applications and technology aspects - Tuesday, 26 May 2026 at 0900 hours (Geneva time) (Room C1, ITU Tower)     N/A  
  [ ADM 89 ]  - English -  Word 2026-05-25 [16:04]  63'446  bytes  
 
[ ADM 88 ]  2026-05-25 Chair, WG 5C-2   Draft agenda for the second meeting of Working Group 5C-2 - Sharing, Compatibility Aspects and WRCs Issues - Monday, 25 May 2026 at 1045 hours (Room C2, ITU Tower)     N/A  
  [ ADM 88 ]  - English -  Word 2026-05-25 [10:00]  68'089  bytes  
 
[ TD 150 ]  2026-05-25 WG 5C-3   Working document towards a preliminary draft new ITU-R Handbook on Fixed Wireless Systems     N/A  
  [ TD 150 ] Annex 7 - English -  Word 2026-05-25 [09:22]  100'249  bytes Annex 7 to working document towards preliminary draft ITU-R Handbook on Fixed Wireless Systems - Chapter 7 - Advanced topics on Fixed Wireless Systems  
  [ TD 150 ] Annex 06 - English -  Word 2026-05-25 [09:19]  621'604  bytes  
  [ TD 150 ] Annex 5 - English -  Word 2026-05-25 [09:15]  1'079'204  bytes Annex 5 to working document towards preliminary draft ITU-R Handbook on Fixed Wireless Systems - Chapter 5 - Network planning and engineering  
  [ TD 150 ] Annex 4 - English -  Word 2026-05-25 [09:01]  3'470'159  bytes Annex 4 to working document towards preliminary draft ITU-R Handbook on Fixed Wireless Systems - Chapter 4 - Network design considerations  
  [ TD 150 ] Annex 3 - English -  Word 2026-05-25 [08:59]  574'299  bytes Annex 3 to working document towards preliminary draft ITU-R Handbook on Fixed Wireless Systems - Chapter 3 - Regulatory frameworks and standards  
  [ TD 150 ] Annex 2 - English -  Word 2026-05-25 [08:57]  3'596'416  bytes Annex 2 to working document towards preliminary draft ITU-R Handbook on Fixed Wireless Systems - Chapter 2 - Applications and systems architecture of Fixed Wireless Systems  
  [ TD 150 ] Annex 1 - English -  Word 2026-05-25 [08:53]  296'315  bytes Annex 1 to working document towards preliminary draft ITU-R Handbook on Fixed Wireless Systems - Front Matter and Chapter 1  
  [ TD 150 ]  - English -  Word 2026-05-25 [08:50]  79'940  bytes  
 
[ ADM 87 ]  2026-05-25 Chair, WG 5C-3   Draft agenda for WG 5C-3 "WG General Aspects and HF Systems" closing Plenary, 22 May 2026 at 1430 hours (Geneva time) (Room Popov 2, ITU Tower)     N/A  
  [ ADM 87 ]  - English -  Word 2026-05-25 [08:36]  48'371  bytes  
 
[ ADM 86 ]  2026-05-22 Chair, WP 5C   Agenda for the interim Plenary of the 34rh meeting of Working Party 5C - Friday, 22 May 2026, from 1615 to 1730 hours (Geneva time) (Tower, Popov Room 2)     N/A  
  [ ADM 86 ]  - English -  Word 2026-05-22 [15:45]  45'989  bytes  
 
[ ADM 85 ]  2026-05-22 Chair, WG 5C-1   Draft agenda for the fifth meeting of Working Group 5C-1 Spectrum, applications and technology aspects - Monday, 25 May 2026 at 0900 hours (Geneva time) (Room Popov 2, ITU Tower)     N/A  
  [ ADM 85 ]  - English -  Word 2026-05-22 [14:30]  62'670  bytes  
 
[ TD 149 ]  2026-05-22 WG 5C-1   [Preliminary] draft revision of Report ITU-R F.2416-1 - Technical and operational characteristics and applications of the point-to-point fixed service applications operating in the frequency band 275-450 GHz     N/A  
  [ TD 149 ]  - English -  Word 2026-05-22 [10:59]  4'066'396  bytes  
 
[ 320 ]  2026-05-22 WP 4A   Reply liaison statement to Working Parties 5A, 5B, 5C and 7C - WRC-27 agenda item 1.4     AI1.4  
  [ 320 ]  - English -  Word 2026-05-22 [08:21]  41'997  bytes  
 
[ ADM 84 ]  2026-05-21 Chair, WG 5C-3   Draft agenda for WG 5C-3 "WG General Aspects and HF Systems" Friday, 22 May 2026 at 1430 hours (Geneva time) (Room Popov 2, ITU Tower)     N/A  
  [ ADM 84 ]  - English -  Word 2026-05-21 [16:22]  47'495  bytes  
 
[ ADM 83 ]  2026-05-21 Chair, WG 5C-1   Draft agenda for the fourth meeting of Working Group 5C-1 Spectrum, applications and technology aspects - Friday, 22 May 2026 at 0900 hours (Geneva time) (Room Popov 2, ITU Tower)     N/A  
  [ ADM 83 ]  - English -  Word 2026-05-21 [16:07]  62'231  bytes  
 
[ TD 148 ]  2026-05-21 WG 5C-1   Detailed work plan for the new Report ITU-R F.[FS.CHAR.450-700 GHZ] - Technical and operational characteristics of the fixed service applications operating in the frequency range 450-700 GHz     N/A  
  [ TD 148 ]  - English -  Word 2026-05-21 [14:55]  36'404  bytes  
 
[ TD 147 ]  2026-05-21 WG 5C-1   Draft liaison statement to Working Party 3M (copy to Working Party 3K for information) - Working document towards a preliminary draft new Report ITU-R F.[FS.CHAR.450-700 GHZ]     N/A  
  [ TD 147 ]  - English -  Word 2026-05-21 [14:52]  33'416  bytes  
 
[ TD 146 ]  2026-05-21 WG 5C-1   Working document towards a preliminary draft new Report ITU-R F.[FS.CHAR.450-700 GHZ] - Technical and operational characteristics of the fixed service applications operating in the frequency range 450-700 GHz     N/A  
  [ TD 146 ]  - English -  Word 2026-05-21 [14:47]  1'701'512  bytes  
 
[ TD 145 ]  2026-05-21 WG 5C-3   Working document towards a preliminary draft revision of Recommendation ITU-R F.1245-3 - Mathematical model of average and related radiation patterns for point-to-point fixed wireless system antennas for use in interference assessment in the frequency range from 1 GHz to 86     N/A  
  [ TD 145 ]  - English -  Word 2026-05-21 [08:50]  789'223  bytes  
 
[ ADM 82 ]  2026-05-20 Chair, WG 5C-1   Draft agenda for the third meeting of Working Group 5C-1 - Spectrum, applications and technology aspects - Thursday, 21 May 2026 at 0900 hours (Geneva time) (Room Popov 2, ITU Tower)     N/A  
  [ ADM 82 ]  - English -  Word 2026-05-20 [16:02]  62'028  bytes  
 
[ ADM 81 ]  2026-05-20 Chair, WG 5C-3   Draft agenda for WG 5C-3 "WG General Aspects and HF Systems" Wednesday, 20 May 2026 at 1400 hours (Geneva time) (Room Popov 2, ITU Tower)     N/A  
  [ ADM 81 ]  - English -  Word 2026-05-20 [08:20]  50'202  bytes  
 
[ ADM 80 ]  2026-05-19 Chair, WG 5C-1   Draft agenda for the second meeting of Working Group 5C-1 - Spectrum, applications and technology aspects - Wednesday, 20 May 2026 at 0900 hours (Geneva time) (Popov 2, ITU Tower)     N/A  
  [ ADM 80 ]  - English -  Word 2026-05-19 [16:02]  63'789  bytes  
 
[ ADM 79 ]  2026-05-18 Chair, WG 5C-2   Draft agenda for the first and second meetings of Working Group 5C-2 Sharing, Compatibility Aspects and WRCs Issues - Monday, 18 May 2026 at 1545 hours (Room Popov, Tower) - Tuesday, 19 May 2026 at 1045 hours (Room K, Montbrillant)     N/A  
  [ ADM 79 ]  - English -  Word 2026-05-18 [14:37]  67'761  bytes  
 
[ ADM 78 ]  2026-05-18 Chair, WG 5C-1   Draft agenda for the first meeting of Working Group 5C-1 - Tuesday, 19 May 2026 at 0900 hours, Geneva Time (Room K, ITU Montbrillant)     N/A  
  [ ADM 78 ]  - English -  Word 2026-05-18 [14:16]  63'390  bytes  
 
[ ADM 74 ]  2026-05-13 Chair, WP 5C   Draft agenda for the Opening Plenary of the 34th meeting of Working Party 5C - Monday, 18 May 2026, at 1115 hours (Geneva time) (Tower, Room Popov)     N/A  
  [ ADM 74 ]  - English -  Word 2026-05-15 [09:04]  35'353  bytes  
 
[ 304 ]  2026-05-01 ATDI   Working document towards preliminary draft new Report ITU-R F.[WEATHER_MONITORING] - Fixed wireless link performance data collection for weather monitoring     N/A  
  [ 304 ]  - English -  Word 2026-05-04 [10:41]  167'037  bytes  
 
[ INF 11 ]  2026-05-13 WPs 5A, 5B & 5C   Initial meetings schedule for Working Parties 5A, 5B and 5C (18 - 29 May 2026)     N/A  
  [ INF 11 ]  - English -  Word 2026-05-14 [11:24]  60'381  bytes  
 
[ INF 10 ]  2026-05-13 BR, Study Groups Department   Information for participants - Meetings of Working Parties 5A, 5B and 5C (Geneva, 18 - 29 May 2026)     N/A  
  [ INF 10 ] Part 1 - English -  PowerPoint 2007 2026-05-14 [11:23]  4'099'578  bytes  
  [ INF 10 ]  - English -  Word 2026-05-14 [11:23]  9'436'593  bytes  
 
[ ADM 77 ]  2026-05-13 Chair, WG 5C-3   Draft agenda for the Opening Plenary of the 34th meeting of Working Party 5C-3 'WG General Aspects and HF Systems' - Monday, 18 May 2026, Period 3 (1400-1515) (Geneva time) (Room Popov, ITU Tower)     N/A  
  [ ADM 77 ]  - English -  Word 2026-05-13 [09:25]  49'494  bytes  
 
[ ADM 75 ]  2026-05-13 Chair, WP 5C   Working structure of the 34th meeting of Working Party 5C     N/A  
  [ ADM 75 ]  - English -  Word 2026-05-14 [13:57]  37'584  bytes  
 
[ 283 ]  2026-04-09 WP 6A   Liaison statement to Working Parties 5A and 5C - Updates to the ENG/PMSE database     N/A  
  [ 283 ]  - English -  Word 2026-04-09 [16:38]  32'779  bytes  
 
[ 311 ]  2026-05-05 Canada   Proposed liaison statement to Working Parties 4A, 4C, 5A, and 5B on progress of studies for WRC-27 agenda item 1.10     AI1.10  
  [ 311 ]  - English -  Word 2026-05-06 [10:56]  47'777  bytes  
 
[ 318 ]  2026-05-06 Huawei Technologies Sweden AB , Telefon AB - LM Ericsson   WRC-2027 agenda item 1.10 sharing study between GSO and non-GSO earth stations and fixed service (FS)     AI1.10  
  [ 318 ]  - English -  Word 2026-05-07 [11:25]  51'599  bytes  
 
[ 317 ]  2026-05-06 Cameroon   Proposals for the working document towards a preliminary draft new ITU-R Handbook on fixed wireless systems and the draft work plan for its development     N/A  
  [ 317 ]  - English -  Word 2026-05-07 [11:22]  6'373'469  bytes  
 
[ 316 ]  2026-05-06 British Telecommunications Plc. (BT Plc) , Deutsche Telekom AG , Huawei Technologies Sweden AB , Nokia Corporation , Orange , Telefon AB - LM Ericsson , Vodafone Group Services Ltd   WRC-27 agenda item 1.10 sharing study between non-GSO fixed satellite service (FSS) and fixed service (FS)     AI1.10  
  [ 316 ]  - English -  Word 2026-05-07 [10:30]  1'061'651  bytes  
 
[ 315 ]  2026-05-06 British Telecommunications Plc. (BT Plc) , Deutsche Telekom AG , Huawei Technologies Sweden AB , Nokia Corporation , Orange , Telefon AB - LM Ericsson , Vodafone Group Services Ltd   WRC-27 agenda item 1.10 sharing study between GSO fixed satellite service (FSS) and fixed service (FS)     AI1.10  
  [ 315 ]  - English -  Word 2026-05-07 [10:31]  278'407  bytes  
 
[ 314 ]  2026-05-06 Tonga   Working document on sharing studies under WRC-27 agenda item 1.10     AI1.10  
  [ 314 ]  - English -  Word 2026-05-07 [09:02]  123'933  bytes  
 
[ 282 ]  2026-03-26 WP 7C   Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B and 7D regarding progress of work - WRC-27 agenda item 1.17     AI1.17  
  [ 282 ]  - English -  Word 2026-03-26 [15:06]  34'289  bytes  
 
[ 313 ]  2026-05-05 France   Updates on working documents related to 31.8-33.4 GHz band sharing between ARNS and FS     N/A  
  [ 313 ]  - English -  Word 2026-05-06 [11:28]  320'078  bytes  
Results: 61 total items.
Result Page:  1 - 2  - Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages Yes  
Formats doc pdf zip  + Other formats
Languages (maximum 2) E F S A C R  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2026-05-27