Contributions  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 102 ]
|
Note to the Chair of Working Party 1A - UWB abbreviation and definition for addition to the ITU Terms and Definitions database
|
Chair, WP 1B
|
|
2025-06-13 |
|
[ 101 ]
|
List of documents issued (Documents 1A/43 - 1A/101)
|
BR, Study Groups Department
|
|
2025-06-10 |
|
[ 100 ]
|
Liaison statement to ITU-T Study Group 15 Question 6/15 (copy to ITU-R Working Parties 1A, 5C) - Free-space optics systems related aspects for G.fso
|
WP 3M
|
|
2025-06-09 |
|
[ 99 ]
|
Report on CISPR activities from June 2024 to June 2025 on WPT issues
|
SG 1 Rapp. to CISPR on WPT issues
|
|
2025-06-09 |
|
[ 98 ]
|
Working document towards a preliminary draft revision of Recommendation ITU-R SM.2151-0 - Guidance on frequency ranges for operation of wireless power transmission via radio frequency beam for mobile/portable devices and sensor networks
|
India
|
|
2025-05-30 |
|
[ 97 ]
|
Preliminary draft revision of Recommendation ITU-R SM.1755-0 - Characteristics of ultra-wideband technology
|
Germany
|
|
2025-05-30 |
|
[ 96 ]
|
Working document towards a preliminary draft Report ITU-R SM.[UWB.EVOLUTION] - Evolution of devices using ultra-wideband (UWB) technologies
|
Germany
|
|
2025-05-30 |
|
[ 95 ]
|
Compiled preliminary revision of Recommendation ITU-R SM.2110-1 - Guidance on frequency ranges for operation of non-beam wireless power transmission for electric vehicles
|
ATDI
|
|
2025-05-28 |
|
[ 94 ]
|
Working document towards a preliminary draft revision of Report ITU-R SM.2451-1
|
ATDI
|
|
2025-05-28 |
|
[ 93 ]
|
Preliminary draft revision of Recommendation ITU-R SM.2110-1 - Guidance on frequency ranges for operation of non-beam wireless power transmission for electric vehicles
|
United Kingdom
|
|
2025-05-28 |
|
[ 92 ]
|
Proposed draft clarifications to "features of the necessary bandwidth", for Recommendation ITU-R SM.328-11 - Spectra and bandwidth of emissions
|
United Kingdom
|
|
2025-05-28 |
|
[ 91 ]
|
Proposal for development of new Report on the usage overview of Wireless Power Transmission (WPT)
|
Japan
|
Q210-4/1
|
2025-05-28 |
|
[ 90 ]
|
Proposal for a draft liaison statement to APT Wireless Group - AWG deliverables in the frequency above 252 GHz
|
Japan
|
|
2025-05-28 |
|
[ 89 ]
|
Proposal for a draft liaison statement to ETSI ISG THz - Publication of ETSI GRs THz 003 and 004
|
Japan
|
|
2025-05-28 |
|
[ 88 ]
|
Proposed modifications to working document towards a preliminary draft new Report ITU-R SM.[RADIOCOMMUNICATION SERVICES ABOVE 275 GHZ] - Technical and operational characteristics and spectrum use of radiocommunication services in the frequency ranges above 275 GHz
|
Japan
|
Q237/1
|
2025-05-28 |
|
[ 87 ]
|
Recent developments concerning, EMC limits and standards, broadband access and in-premises networking, RF noise in the environment, and ISM matters - (Question ITU-R 221-2/1)
|
Chair, CG on EMC
|
Q221-2/1
|
2025-05-28 |
|
[ 86 ]
(Rev.1) |
Liaison statement to Working Parties 1A and 1B - The On-Tune Rejection (OTR) in Recommendation ITU-R SM.337 and Recommendation ITU-R M.1461
|
WP 5B
|
|
2025-05-27 |
|
[ 85 ]
|
Working document towards a preliminary draft revision of Recommendation ITU-R SM.2110-1 - Guidance on frequency ranges for operation of non-beam wireless power transmission for electric vehicles
|
Korea (Rep. of)
|
|
2025-05-26 |
|
[ 84 ]
|
Working document towards a preliminary draft revision of Recommendation ITU-R SM.2151-0 - Guidance on frequency ranges for operation of wireless power transmission via radio frequency beam for mobile/portable devices and sensor networks
|
United States
|
|
2025-05-23 |
|
[ 83 ]
|
Working document towards a preliminary draft revision of Report ITU-R SM.2505-0 - Impact studies and human hazard issues for wireless power transmission via radio frequency beam
|
United States
|
|
2025-05-23 |
|
[ 82 ]
|
Proposed revisions to working document towards a preliminary draft new Report ITU-R SM.[UWB.EVOLUTION] - Evolution of devices using ultra-wideband (UWB) technologies
|
United States
|
|
2025-05-23 |
|
[ 81 ]
|
Preliminary draft revision of Recommendation ITU-R SM.2110-1 - US Proposal for Updates and Elevation
|
United States
|
|
2025-05-23 |
|
[ 80 ]
|
Working document towards a preliminary draft revision of Report ITU-R SM.2451-1 - US proposal for updates
|
United States
|
|
2025-05-23 |
|
[ 79 ]
|
Working document towards a preliminary draft revision of Report ITU-R SM.2392-1 - Applications of wireless power transmission via radio frequency beam
|
Brazil
|
|
2025-05-22 |
|
[ 78 ]
|
Additional information on the summary of conclusions of the 32nd meeting of the Radiocommunication Advisory Group for the attention of all ITU-R Study Groups and Working Parties
|
Director, BR
|
|
2025-05-23 |
|
[ 77 ]
|
Liaison statement to ITU-T Study Group 15 Question 6/15 (Copy to ITU-R Working Parties 1A, 3J, 3M and Study Group 5) - Free-space optics systems related aspects for G.fso
|
WP 5C
|
|
2025-05-22 |
|
[ 76 ]
(Rev.1) |
Unwanted electromagnetic radiation (UEMR) and Question ITU-R 243/1
|
Netherlands (Kingdom of the)
|
Q243/1
|
2025-05-22 |
|
[ 75 ]
|
Liaison statement to ITU-R Working Party 1A (copy to ITU-T Study Group 5) - Request of feedback on terms and definitions proposed by ITU-T Study Group 5 and submitted to the CCT for validation
|
CCT
|
|
2025-05-21 |
|
[ 74 ]
|
Working document towards preliminary draft revision of Report ITU-R SM.2422-2 - Visible light for broadband communications
|
China
|
|
2025-05-19 |
|
[ 73 ]
|
Proposed preliminary draft revision of Report ITU-R SM.2451-1 - Assessment of impact on radiocommunication services from wireless power transmission for electric vehicle operating below 30 MHz
|
China
|
|
2025-05-19 |
|
[ 72 ]
|
Report of activities
|
Chair, WP 1A CG on Report ITU-R SM.[UWB.EVOLUTION]
|
|
2025-05-14 |
|
[ 71 ]
(Rev.1) |
Liaison statement on free-space optics systems related aspects for G.fso
|
ITU-T SG15
|
|
2025-04-11 |
|
[ 70 ]
|
Liaison statement on satellite to satellite free space optical communication
|
ITU-T SG15
|
|
2025-04-15 |
|
[ 69 ]
|
Liaison statement to Working Party 1A - Beam wireless power transmission (WPT)
|
WP 7C
|
|
2025-04-08 |
|
[ 68 ]
|
Liaison statement on the latest updates of access network transport (ANT) and home network transport (HNT) standards overviews and work plans
|
ITU-T SG15
|
|
2025-04-08 |
|
[ 67 ]
|
Preliminary position on WRC-27 agenda - Preliminary WMO position on the World Radiocommunication Conference 2027 (WRC-27) agenda
|
World Meteorological Organization
|
|
2025-04-07 |
|
[ 66 ]
|
Liaison statement to ITU-T Study Groups 5 and 15, and to CENELEC on developments with low frequency powerline communications (copy to ITU-R Working Party 1A for information)
|
WP 6A
|
|
2025-03-17 |
|
[ 65 ]
|
Proposed modifications to the preliminary draft new section 5, "Features of the necessary bandwidth", for Recommendation ITU-R SM.328-11 - Spectra and bandwidth of emissions
|
Russian Federation
|
|
2025-03-03 |
|
[ 64 ]
(Rev.1) |
Liaison statement on request for input on Quality of Service (QoS) and Electromagnetic Fields (EMF) in the context of indoor coverage technologies
|
ITU-T SG2
|
|
2025-02-21 |
|
[ 63 ]
|
Reply liaison statement to Coordination Committee for Terminology (copy to ITU-T Study Group 12 and ITU-R Working Party 1A) - Clarifications on the term "conducted radio frequency connection" and its definition
|
WP 5D
|
|
2025-02-20 |
|
[ 62 ]
|
Liaison statement on the definitions of the terms from ITU-T Study Group 5
|
SCV
|
|
2025-02-14 |
|
[ 61 ]
|
Liaison statement on the definition of the term "spark-over voltage" from ITU-T Study Group 5
|
SCV
|
|
2025-02-14 |
|
[ 60 ]
|
Liaison statement on the definitions of the terms "Out of band (PLC)" and "PLC operating bandwidth" from ITU-T Study Group 5
|
SCV
|
|
2025-02-14 |
|
[ 59 ]
|
Liaison statement on revised title and Terms of Reference of Joint Coordination Activity on Internet of Things and Smart Cities and Communities (JCA-IoT and SC&C)
|
ITU-T SG20
|
|
2025-02-04 |
|
[ 58 ]
|
Liaison statement on vocabulary matters (radio frequency and network scenario)
|
ITU-T SG12
|
|
2025-01-29 |
|
[ 57 ]
|
Liaison statement to key SDOs on the publication of GR THz 003 and GR THz 004
|
ETSI ISG THz
|
|
2025-01-23 |
|
[ 56 ]
|
Liaison letter from CISPR/H to ITU-R on CISPR 12 to Ed7.0
|
International Special Committee on Radio Interference
|
|
2025-01-13 |
|
[ 55 ]
|
Reply liaison statement to ITU-R Working Party 1B and ITU-T Study Groups 11, 17 and 20 (copy to ITU-R Working Party 1A) - Addition of the UWB abbreviation to the ITU Terms and Definitions database and request to provide a definition for this term
|
CCT
|
|
2024-12-19 |
|
[ 54 ]
|
Liaison statement to ITU-T Study Group 12 and to ITU-R Working Parties 1A and 5D - Clarifications on the term "conducted radio frequency connection" and its definition
|
CCT
|
|
2024-12-19 |
|
[ 53 ]
|
Liaison statement to CISPR/H (copy for information to ITU-R Study Group 1 and Working Parties 1A, 5A and 7A) - Update to broadcasting services protection requirements in the CISPR radio services database
|
WP 6A
|
|
2024-11-18 |
Results:102 total items. Result page:
1 -
2 -
3
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):