|
Number |
Date
|
Source
|
Title
|
| |
Number |
Posted |
Size
|
|
| |
|
[ 144 ]
|
2026-06-11 |
Director, BR
|
Final list of participants - Working Party 1A (Geneva, 3-10 June 2026)
|
|
[ 144 ] - English - PDF (acrobat) |
2026-06-11 [10:42]
|
148'208 bytes |
|
| |
|
[ ADM 64 ]
|
2026-06-10 |
Chair, WP 1A
|
Agenda for the third (final) Plenary session of the third 2023-2027 meeting of Working Party 1A - Wednesday, 10 June 2026, at 1430 hours (Geneva time) - (Room C, ITU Tower)
|
|
[ ADM 64 ] Revision 2 - English - Word |
2026-06-11 [08:00]
|
48'709 bytes |
|
| |
|
[ TD 70 ]
|
2026-06-10 |
WG 1A3
|
Working document towards a preliminary draft new Report ITU-R SM.[THZ.NB.APPLICATIONS] - Technical and operational feasibility of THz imaging and sensing systems [for industrial, scientific and medical applications]
|
|
[ TD 70 ] Revision 1 - English - Word |
2026-06-10 [16:41]
|
774'388 bytes |
|
| |
|
[ TD 72 ]
|
2026-06-10 |
WG 1A3
|
Working document towards a preliminary draft revision of Recommendation ITU-R SM.337-6 - Frequency and Distance Separations
|
|
[ TD 72 ] Revision 1 - English - Word |
2026-06-10 [16:12]
|
154'250 bytes |
|
| |
|
[ TD 73 ]
|
2026-06-10 |
WG 1A3
|
Working document towards a preliminary draft new Report ITU-R SM.[UWB.EVOLUTION] - Evolution of devices using ultra-wideband (UWB) technologies
|
|
[ TD 73 ] Revision 1 - English - Word |
2026-06-10 [14:35]
|
1'745'965 bytes |
|
|
[ TD 73 ] - English - Word |
2026-06-10 [09:20]
|
1'776'429 bytes |
|
| |
|
[ TD 75 ]
|
2026-06-10 |
WG 1A-3
|
Chair's Report of Working Group 1A-3 - (WRC-31 preliminary agenda item 2.1, WRC-27 agenda items, and other issues)
|
|
[ TD 75 ] - English - Word |
2026-06-10 [14:58]
|
59'485 bytes |
|
| |
|
[ TD 65 ]
|
2026-06-09 |
WG 1A2
|
Preliminary draft revision of Report ITU-R SM.2392-1 - Applications of wireless power transmission via radio frequency beam
|
|
[ TD 65 ] Revision 2 - English - Word |
2026-06-10 [14:05]
|
11'277'213 bytes |
|
| |
|
[ TD 67 ]
|
2026-06-09 |
WP 1A
|
Draft liaison statement to Working Parties 4C, 5D, 7C, and 7D - Beam wireless power transmission (WPT)
|
|
[ TD 67 ] Revision 1 - English - Word |
2026-06-10 [13:31]
|
40'440 bytes |
|
| |
|
[ TD 74 ]
|
2026-06-10 |
WG 1A2
|
Meeting Report of Working Group 1A2
|
|
[ TD 74 ] - English - Word |
2026-06-10 [14:41]
|
53'142 bytes |
|
| |
|
[ TD 54 ]
|
2026-06-04 |
WG 1A2
|
Preliminary draft revision of Report ITU-R SM.2451-1 - Assessment of impact on radiocommunication services from wireless power transmission for electric vehicle operating below 30 MHz
|
|
[ TD 54 ] Revision 2 - English - Word |
2026-06-10 [12:25]
|
41'554'153 bytes |
|
| |
|
[ TD 55 ]
|
2026-06-04 |
WG 1A2
|
[Preliminary] draft revision of Report ITU-R SM.2505-0 - Impact studies and human hazard issues for wireless power transmission
via radio frequency beam
|
|
[ TD 55 ] Revision 2 - English - Word |
2026-06-10 [11:52]
|
4'770'427 bytes |
|
| |
|
[ TD 56 ]
|
2026-06-04 |
WG 1A2
|
[Preliminary] draft revision of Recommendation ITU-R SM.2151-0 - Guidance on frequency ranges for operation of wireless power transmission via radio frequency beam for mobile/portable devices and sensor networks
|
|
[ TD 56 ] Revision 2 - English - Word |
2026-06-10 [11:23]
|
44'723 bytes |
|
| |
|
[ TD 60 ]
|
2026-06-08 |
DG THz
|
For information only: Working document towards a preliminary draft new Report ITU-R SM.[ACTIVE SERVICES BETWEEN 275 AND 450 GHZ] Technical and operational characteristics of active services in the frequency range between 275 and 450 GHz
|
|
[ TD 60 ] Revision 1 - English - Word |
2026-06-10 [09:13]
|
261'164 bytes |
|
| |
|
[ ADM 59 ]
|
2026-06-08 |
Chair, WG 1A-3
|
Draft agenda for the fifth session of Working Group 1A-3 (WRC-31 item 2.1, WRC-27 agenda items, and other issues) Wednesday, 10 June 2026, P2 at 1040-1200 hours (Geneva time) (Room A, ITU Tower)
|
|
[ ADM 59 ] Revision 1 - English - Word |
2026-06-10 [09:12]
|
36'808 bytes |
|
| |
|
[ TD 59 ]
|
2026-06-08 |
WG 1A3
|
Draft liaison statement to the IEC ACEC, TC 77 and CISPR - On consistent use of the term high frequency (HF)
|
|
[ TD 59 ] Revision 1 - English - Word |
2026-06-10 [08:50]
|
42'090 bytes |
|
| |
|
[ TD 71 ]
|
2026-06-10 |
WG 1A3
|
[Draft] liaison statement to external organizations (copy for information to Working Parties 5A and 5C)
|
|
[ TD 71 ] - English - Word |
2026-06-10 [09:13]
|
36'995 bytes |
|
| |
|
[ TD 61 ]
|
2026-06-08 |
WG 1A3
|
Working document towards a preliminary draft revision of Report ITU-R SM.2352-1 - Technology trends of active services in the frequency range 275-3 000 GHz
|
|
[ TD 61 ] Revision 1 - English - Word |
2026-06-10 [08:45]
|
8'448'145 bytes |
|
| |
|
[ TD 69 ]
|
2026-06-10 |
Acting Chair, WG 1A-1
|
Chair's Report of Working Group 1A-1
|
|
[ TD 69 ] - English - Word |
2026-06-10 [09:04]
|
56'513 bytes |
|
| |
|
[ ADM 42 ]
|
2026-05-29 |
Chairs, WPs 1A, 1B & 1C
|
Provisional schedule for the sessions of the Third 2023-2027 Meetings of Working Parties 1A and 1C and Fourth Meeting of Working Party 1B (Geneva, 3-10 June 2026)
|
|
[ ADM 42 ] Revision 5 - English - Word |
2026-06-09 [17:42]
|
55'016 bytes |
|
| |
|
[ TD 68 ]
|
2026-06-09 |
WP 1A
|
Draft reply liaison statement to CCT
(copy for information to ITU-R Working Party 5D and to ITU-T Study Group 12) - Clarifications on the term "conducted radio frequency connection"
and its definition
|
|
[ TD 68 ] - English - Word |
2026-06-10 [08:32]
|
41'686 bytes |
|
| |
|
[ ADM 63 ]
|
2026-06-09 |
WG 1A-2
|
Draft agenda for the eight meeting of Working Group 1A-2 - Wireless power transmission (WPT) and related issues - Wednesday, 10 June 2025 at 0900 hours (Geneva time) (Room A, Tower)
|
|
[ ADM 63 ] - English - Word |
2026-06-09 [14:44]
|
46'911 bytes |
|
| |
|
[ TD 64 ]
|
2026-06-09 |
WG 1A2
|
Working document towards a preliminary draft revision of Recommendation ITU-R SM.2129-1 - Guidance on frequency ranges for the operation of non-beam wireless power transmission for mobile and portable devices
|
|
[ TD 64 ] Revision 1 - English - Word |
2026-06-09 [11:12]
|
50'797 bytes |
|
| |
|
[ TD 66 ]
|
2026-06-09 |
WG 1A2
|
Working document towards a preliminary draft revision of Report ITU-R SM.2449-1 - Impact analyses of non-beam magnetic inductive and magnetic resonant wireless power transmission for mobile and portable devices on radiocommunication services
|
|
[ TD 66 ] Revision 1 - English - Word |
2026-06-09 [11:07]
|
19'799'870 bytes |
|
| |
|
[ TD 63 ]
|
2026-06-09 |
WP 1A
|
Draft reply liaison statement to IEC CISPR/H (copy to ITU-R Study Group 3) - Radio Noise Types and Methods of Measurement
|
|
[ TD 63 ] - English - Word |
2026-06-09 [09:52]
|
41'798 bytes |
|
| |
|
[ TD 57 ]
|
2026-06-05 |
WG 1A1
|
Draft liaison statement to IEC CISPR/H (copy to ITU-R Working Party 7D for information) - CISPR work relating to 'Unintentional Radio Frequency Energy (URFE)'
|
|
[ TD 57 ] - English - Word |
2026-06-08 [08:05]
|
35'378 bytes |
|
| |
|
[ TD 58 ]
|
2026-06-05 |
WG 1A1
|
Draft reply liaison statement to Working Party 7D (copy to IEC CISPR/H for information) - Unintentional electromagnetic radiation from space stations
|
|
[ TD 58 ] - English - Word |
2026-06-05 [17:38]
|
38'612 bytes |
|
| |
|
[ ADM 62 ]
|
2026-06-09 |
Acting Chair, WG 1A-1
|
Draft agenda for the fifth meeting of Working Group 1A-1 (EMC related interference and coexistence of wired telecommunications systems with radiocommunication systems, including Power Line Telecommunication (PLT) systems and related issues) - Tuesday, 9 June 2026, at 1400 hours (Geneva time) (Room A, Tower)
|
|
[ ADM 62 ] - English - Word |
2026-06-09 [08:14]
|
33'678 bytes |
|
| |
|
[ TD 62 ]
|
2026-06-09 |
WG 1A1
|
[Preliminary] draft revision of Report ITU-R SM.2422-2 - Visible light for broadband communications
|
|
[ TD 62 ] - English - Word |
2026-06-09 [08:21]
|
17'696'173 bytes |
|
| |
|
[ ADM 57 ]
|
2026-06-08 |
Chair, WG 1A-3
|
Draft agenda for the third session of Working Group 1A-3 (WRC-31 item 2.1, WRC-27 agenda items, and other issues) Monday, 8 June 2026, during P2 at 1040 hours (Geneva time) (Room C, ITU Tower)
|
|
[ ADM 57 ] Revision 1 - English - Word |
2026-06-08 [13:55]
|
39'625 bytes |
|
| |
|
[ ADM 61 ]
|
2026-06-08 |
Chair, WG 1A-2
|
Draft agenda for the seventh meeting of Working Group 1A-2 - Wireless power transmission (WPT) and related issues - Tuesday, 9 June 2025 at 0900 hours (Geneva time) (Room A, Tower)
|
|
[ ADM 61 ] - English - Word |
2026-06-08 [13:49]
|
46'339 bytes |
|
| |
|
[ TD 53 ]
|
2026-06-04 |
WG 1A2
|
Draft CPM text on item 2.2 of the WRC-31 preliminary agenda, for section A1/2.2 of the draft CPM Report to WRC-27
|
|
[ TD 53 ] Revision 1 - English - Word |
2026-06-08 [10:24]
|
156'136 bytes |
|
| |
|
[ ADM 56 ]
|
2026-06-05 |
Chair, WP 1A
|
Agenda for the second (interim) Plenary session of the third 2023-2027 meeting of Working Party 1A - Monday, 8 June 2026, at 1040 hours (Geneva time) - (Room C, ITU Tower)
|
|
[ ADM 56 ] Revision 1 - English - Word |
2026-06-08 [10:18]
|
37'625 bytes |
|
| |
|
[ ADM 60 ]
|
2026-06-08 |
Acting Chair, WG 1A-1
|
Draft agenda for the fourth meeting of Working Group 1A-1
(EMC related interference and coexistence of wired telecommunications systems with radiocommunication systems, including Power Line Telecommunication (PLT) systems and related issues) - Monday, 8 June 2026, at 1540 hours (Geneva time) (Room L, Montbrillant)
|
|
[ ADM 60 ] - English - Word |
2026-06-08 [08:51]
|
43'181 bytes |
|
| |
|
[ ADM 58 ]
|
2026-06-08 |
Chair, WG 1A-3
|
Draft agenda for the fourth session of Working Group 1A-3 (WRC-31 item 2.1, WRC-27 agenda items, and other issues) Monday, 8 June 2026, P3 at 1400 hours (Geneva time) (Room A, ITU Tower)
|
|
[ ADM 58 ] - English - Word |
2026-06-08 [08:41]
|
38'608 bytes |
|
| |
|
[ ADM 55 ]
|
2026-06-05 |
Chair, WG 1A-2
|
Draft agenda for the sixth meeting of Working Group 1A-2 - Wireless power transmission (WPT) and related issues - Monday, 8 June 2025 at 0900 hours (Geneva time) (Room A, Tower)
|
|
[ ADM 55 ] Revision 1 - English - Word |
2026-06-08 [08:32]
|
43'937 bytes |
|
| |
|
[ ADM 54 ]
|
2026-06-05 |
Acting Chair, WG 1A-1
|
Draft agenda for the third meeting of Working Group 1A-1 (EMC related interference and coexistence of wired telecommunications systems with radiocommunication systems, including Power Line Telecommunication (PLT) systems and related issues) Friday, 5 June 2026, at 1430 hours (Geneva time) (Room A, ITU Tower)
|
|
[ ADM 54 ] - English - Word |
2026-06-05 [13:26]
|
45'139 bytes |
|
| |
|
[ ADM 53 ]
|
2026-06-04 |
Acting Chair, WG 1A-1
|
Draft agenda for the second meeting of Working Group 1A-1 (EMC related interference and coexistence of wired telecommunications systems with radiocommunication systems, including Power Line Telecommunication (PLT) systems and related issues) - Thursday, 4 June 2026, at 1400 hours (Geneva time) (Room A, ITU Tower)
-
|
|
[ ADM 53 ] - English - Word |
2026-06-05 [14:01]
|
42'156 bytes |
|
| |
|
[ ADM 52 ]
|
2026-06-04 |
Chair, WG 1A-2
|
Draft agenda for the fifth meeting of Working Group 1A-2 - Wireless power transmission (WPT) and related issues - Friday, 5 June 2025 at 1610 hours (Geneva time) (Room A, Tower)
|
|
[ ADM 52 ] - English - Word |
2026-06-04 [09:44]
|
36'118 bytes |
|
| |
|
[ ADM 51 ]
|
2026-06-04 |
Chair, WG 1A-2
|
Draft agenda for the fourth meeting of Working Group 1A-2 - Wireless power transmission (WPT) and related issues - Friday, 5 June 2025 at 0900 hours (Geneva time) (Room A, Tower)
|
|
[ ADM 51 ] - English - Word |
2026-06-04 [09:41]
|
36'300 bytes |
|
| |
|
[ ADM 50 ]
|
2026-06-04 |
Chair, WG 1A-3
|
Draft agenda for the second session of Working Group 1A-3
(WRC-31 item 2.1, WRC-27 agenda items, and other issues) - Thursday, 4 June 2026, at 0900 hours (Geneva time) (Room A, ITU Tower)
|
|
[ ADM 50 ] - English - Word |
2026-06-04 [08:20]
|
41'455 bytes |
|
| |
|
[ ADM 44 ]
|
2026-05-29 |
Chair, WP 1A
|
Structure of Sub-Groups and assignment of input documents for the third 2023-2027 Meeting of Working Party 1A (Geneva, 3-10 June 2026)
|
|
[ ADM 44 ] Revision 1 - English - Word |
2026-06-03 [11:42]
|
60'004 bytes |
|
| |
|
[ ADM 41 ]
|
2026-05-29 |
Chairs, WPs 1A, 1B & 1C
|
Agenda for the joint meeting of Working Parties 1A, 1B and 1C - Wednesday, 3 June 2026, at 0930 hours (Geneva time) - (ITU Room C)
|
|
[ ADM 41 ] Revision 1 - English - Word |
2026-06-03 [11:37]
|
54'475 bytes |
|
| |
|
[ ADM 48 ]
|
2026-06-03 |
Chair, WG 1A-2
|
Draft agenda for the second meeting of Working Group 1A-2
Wireless power transmission (WPT) and related issues - Thursday, 4 June 2026 at 1040 hours (Geneva time) (Room A, ITU Tower)
|
|
[ ADM 48 ] - English - Word |
2026-06-03 [10:21]
|
35'259 bytes |
|
| |
|
[ ADM 49 ]
|
2026-06-03 |
Chair, WG 1A-2
|
Draft agenda for the third meeting of Working Group 1A-2
Wireless power transmission (WPT) and related issues - Thursday, 4 June 2025 at 1540 hours (Geneva time) (Room A, Tower)
|
|
[ ADM 49 ] - English - Word |
2026-06-03 [10:38]
|
36'002 bytes |
|
| |
|
[ 143 ]
|
2026-06-03 |
WP 5A
|
Reply liaison statement to ETSI ISG THz (copy for information to ITU-R Working Party 1A) - THz use cases
|
|
[ 143 ] - English - Word |
2026-06-03 [08:25]
|
42'729 bytes |
|
| |
|
[ ADM 47 ]
|
2026-06-03 |
Chair, WG 1A-3
|
Draft agenda for the first session of Working Group 1A-3
(WRC-31 item 2.1, WRC-27 agenda items, and other issues) - Wednesday, 3 June, 2026 P2 (1040-1200 hours) (Geneva time) (Room C, ITU Tower)
|
|
[ ADM 47 ] - English - Word |
2026-06-03 [08:27]
|
42'043 bytes |
|
| |
|
[ ADM 46 ]
|
2026-06-02 |
Acting Chair, WG 1A-1
|
Draft agenda for the first meeting of Working Group 1A-1 (EMC related interference and coexistence of wired telecommunications systems with radiocommunication systems, including Power Line Telecommunication (PLT) systems and related issues) - Wednesday, 3 June 2026, at 1540 hours (Geneva time) (Room L, Montbrillant)
|
|
[ ADM 46 ] - English - Word |
2026-06-02 [17:55]
|
41'911 bytes |
|
| |
|
[ 142 ]
|
2026-06-02 |
BR, Study Groups Department
|
List of documents issued (Documents 1A/104 - 1A/142)
|
|
[ 142 ] - English - Word |
2026-06-02 [11:57]
|
42'122 bytes |
|
Results: 49 total items.
|
Multiple Document Download: Formats and Languages to be included (when available):