Temporary Documents  |
|
Number
|
Title
|
Source
|
Date
|
|
[ 317 ]
|
Meeting Report of Working Group Spectrum Aspects
|
WG Spectrum Aspects
|
2017-02-23 |
|
[ 316 ]
|
Meeting Report of Working Group Technology Aspects
|
WG Technology Aspects
|
2017-02-22 |
|
[ 315 ]
|
Chairman's Report of General Aspects Working Group
|
Chairman, WG General Aspects
|
2017-02-22 |
|
[ 314 ]
|
Meeting Report of SWG Sharing Studies
|
SWG Sharing Studies
|
2017-02-22 |
|
[ 313 ]
|
Meeting Report of SWG Work for TG 5/1
|
SWG Work for TG 5/1
|
2017-02-22 |
|
[ 312 ]
|
Detailed workplan for work related to WRC-19 agenda item 1.15
|
WG General Aspects
|
2017-02-21 |
|
[ 311 ]
|
ITU-R Structure and Workplan - Chapter 2
|
AH Workplan
|
2017-02-21 |
|
[ 310 ]
|
Meeting Report of Ad Hoc Workplan
|
Chairman, AH Workplan
|
2017-02-21 |
|
[ 309 ]
|
Meeting Report of SWG Radio Aspects
|
SWG RADIO ASPECTS
|
2017-02-21 |
|
[ 308 ]
|
[Draft] reply liaison statement to ITU-R Working Party 1B - (copy to Working Parties 1A, 1C, 4A, 4C, 5A, 5B, 5C, 6A, 7B, 7C, 7D and ITU-D/ITU-R Joint Group WTDC Resolution 9) - Working document towards a preliminary draft new Report ITU-R SM.[CRS SPECTRUM MANAGEMENT CHALLENGES] - Spectrum management principles, challenges and issues related to dynamic access to frequency bands
|
SWG RADIO ASPECTS
|
2017-02-21 |
|
[ 307 ]
|
Detailed Workplan for compatibility of IMT and broadcasting-satellite service (sound) in the frequency band 1 452-1 492 MHz in Regions 1 and 3
|
SWG Sharing Studies
|
2017-02-21 |
|
[ 306 ]
|
Workplans for SWG Sharing Studies activities that were not modified at the 26th meeting of WP 5D - Detailed workplan on the coexistence conditions between IMT and aeronautical mobile service in the band 4 800-4 990 MHz
|
SWG Sharing Studies
|
2017-02-21 |
|
[ 305 ]
(Rev.1) |
[Draft] Reply liaison statement to ITU-T Study Group 5 on seeking collaboration on draft Recommendation "Energy efficiency metrics and measurement methodology for 5G solutions"(copy to Working Parties 4A, 4C, 5A and 5C)
|
SWG RADIO ASPECTS
|
2017-02-21 |
|
[ 304 ]
(Rev.1) |
Working document towards a preliminary draft new Report ITU-R M.[IMT&BSS COMPATIBILITY] - Compatibility studies between IMT systems and BSS (sound) systems in the band 1 452-1 492 MHz in different countries in Regions 1 and 3
|
SWG Sharing Studies
|
2017-02-21 |
|
[ 303 ]
(Rev.1) |
Draft liaison statement to WP 4A - Sharing and compatibility study between IMT systems and BSS(sound) systems in the band 1 452-1 492 MHz in different countries
|
SWG Sharing Studies
|
2017-02-21 |
|
[ 302 ]
(Rev.1) |
Working document towards preliminary draft CPM text for WRC-19 agenda item 9.1, issue 9.1.2
|
SWG Sharing Studies
|
2017-02-21 |
|
[ 301 ]
|
[Draft] Reply liaison statement to Working Party 1B on the progress towards a preliminary draft new Report ITU-R SM.[REGULATORY TOOLS] (copy to WPs 4A, 4C, 5A and 5C) - Regulatory tools to support enhanced shared use of the spectrum
|
SWG RADIO ASPECTS
|
2017-02-21 |
|
[ 300 ]
(Rev.1) |
Draft new Report ITU-R M.[IMT-2020.TECH PERF REQ] - Minimum requirements related to technical performance for IMT-2020 radio interface(s)
|
SWG RADIO ASPECTS
|
2017-02-21 |
|
[ 299 ]
|
Meeting Report of Sub-Working Group Evaluation
|
SWG Evaluation
|
2017-02-21 |
|
[ 298 ]
|
Detailed Workplan for development of the draft new Report ITU-R M.[IMT-2020.EVAL]
|
SWG Evaluation
|
2017-02-21 |
|
[ 297 ]
|
Preliminary draft new Report ITU-R M.[IMT-2020.EVAL] - Guidelines for evaluation of radio interface technologies for IMT-2020
|
SWG Evaluation
|
2017-02-21 |
|
[ 296 ]
|
Detailed work plan for the development of the draft new Report ITU-R M[IMT.MTC/NB.BB.IOT/SPECTRUM]
|
SWG USAGE
|
2017-02-21 |
|
[ 295 ]
|
Workplans for studies related to the 3 300 MHz frequency band - Detailed Workplan for studies on operational measures to enable in-band and adjacent band coexistence between IMT-Advanced systems in 3 300-3 400 MHz and Radiolocation systems in 3 100-3 400 MHz
|
SWG Sharing Studies
|
2017-02-21 |
|
[ 294 ]
|
Update to detailed Workplan for studies on technical and operational measures to ensure coexistence and compatibility between the terrestrial and satellite components of IMT in the frequency bands 1 980-2 010 MHz and 2 170-2 200 MHz in different countries, in response to
WRC-19 agenda item 9.1, issue 9.1.1
|
SWG Sharing Studies
|
2017-02-21 |
|
[ 293 ]
(Rev.1) |
Working document towards a preliminary draft new [Recommendation or Report] ITU-R M.[MSS&IMT-ADVANCED SHARING] - Coexistence and compatibility study between mobile satellite systems and terrestrial IMT-Advanced systems in the IMT-2 GHz bands in different countries
|
SWG Sharing Studies
|
2017-02-21 |
|
[ 292 ]
|
Example implementation of the methodology in Recommendation ITU-R M.2101
|
SWG Sharing Studies
|
2017-02-21 |
|
[ 291 ]
(Rev.1) |
Working document towards a preliminary draft new Report ITU-R M.[RADAR&IMT-ADVANCED SHARING] - In band and adjacent band coexistence and compatibility studies between IMT-Advanced systems in 3 300-3 400 MHz and Radiolocation systems in 3 100-3 400 MHz
|
SWG Sharing Studies
|
2017-02-21 |
|
[ 290 ]
(Rev.1) |
Draft reply liaison statement to Working Party 4C - Co-existence and compatibility study between the satellite and terrestrial components of IMT-Advanced in the 2 GHz band in different countries
|
SWG Sharing Studies
|
2017-02-21 |
|
[ 289 ]
|
Meeting report of Sub-Working Group Public Protection and Disaster Relief (PPDR)
|
SWG PPDR
|
2017-02-21 |
|
[ 288 ]
|
Meeting Report of SWG Frequency Arrangements
|
SWG Frequency Arrangements
|
2017-02-21 |
|
[ 287 ]
|
[Draft] liaison statement to external organizations - ITU-R Working Party 5D Workshop on IMT-2020
|
SWG Coordination
|
2017-02-21 |
|
[ 286 ]
(Rev.1) |
Preliminary Information on ITU-R Working Party 5D Workshop on IMT-2020
|
SWG Coordination
|
2017-02-21 |
|
[ 285 ]
|
Meeting Report of Sub-Working Group Coordination
|
SWG Coordination
|
2017-02-21 |
|
[ 284 ]
|
Preliminary draft new Report ITU-R M.[IMT-2020.SUBMISSION] - Requirements, evaluation criteria and submission templates for the development of IMT-2020
|
SWG Coordination
|
2017-02-21 |
|
[ 283 ]
(Rev.1) |
Draft revision of Document IMT-2020/2 - Submission, evaluation process and consensus building for IMT-2020
|
SWG Coordination
|
2017-02-21 |
|
[ 282 ]
|
Update of detailed workplan for development of the draft new Report ITU-R M.[IMT-2020.SUBMISSION]
|
SWG Coordination
|
2017-02-21 |
|
[ 281 ]
|
Meeting Report of Sub-Working Group Circular
|
SWG Circular
|
2017-02-21 |
|
[ 280 ]
|
Detailed workplan for Circular Letter and its addenda
|
SWG Circular
|
2017-02-21 |
|
[ 279 ]
|
Draft liaison statement to external organizations - Further information on the invitation for submission of proposals for candidate radio interface technologies for the terrestrial components of the radio interface(s) for IMT-2020 and invitation to participate in their subsequent evaluation
|
SWG Circular
|
2017-02-21 |
|
[ 278 ]
(Rev.1) |
Addendum 2 to Circular Letter 5/LCCE/59
|
SWG Circular
|
2017-02-21 |
|
[ 277 ]
(Rev.1) |
Revisions to Working document towards a preliminary draft new [Recommendation/Report] ITU-R M.[MSS & IMT L-BAND COMPATIBILITY] - Adjacent band compatibility studies of IMT-Advanced systems in the mobile service in the band below 1 518 MHz with respect to systems in the mobile-satellite service in the frequency band 1 518-1 525 MHz
|
SWG Sharing Studies
|
2017-02-21 |
|
[ 276 ]
|
Working document towards PDNR Recommendation/Report on the coexistence conditions between IMT and aeronautical mobile service in the band 4 800-4 990 MHz
|
SWG Sharing Studies
|
2017-02-21 |
|
[ 275 ]
(Rev.1) |
Liaison statement to Working Party 4C (Copy for information only to Working Party 4A) - Protection of radionavigation-satellite service receiving earth stations operating in the frequency bands 1 164-1 215 MHz, 1 215-1 300 MHz and 1 559-1 610 MHz from unwanted emissions of IMT stations in the frequency bands below 3 GHz
|
SWG Sharing Studies
|
2017-02-21 |
|
[ 274 ]
(Rev.1) |
Liaison statement to Working Party 4C - Adjacent band compatibility studies of IMT-Advanced systems in the mobile service in the band below 1 518 MHz with respect to systems in the
mobile-satellite service in the frequency band 1 518-1 525 MHz
|
SWG Sharing Studies
|
2017-02-21 |
|
[ 273 ]
|
Draft liaison statement to Working Party 5B - AMS parameters and work progress on the coexistence conditions between IMT and aeronautical mobile service in the band 4 800-4 990 MHz
|
SWG Sharing Studies
|
2017-02-21 |
|
[ 272 ]
(Rev.1) |
Draft liaison statement to Working Party 7B (Copied for information to Working Party 5A) - Technical characteristics for WRC-19 AI 1.3
|
SWG Sharing Studies
|
2017-02-21 |
|
[ 271 ]
(Rev.1) |
Detailed workplan on the technical measures to ensure coexistence between the MSS in the frequency band 1 518-1 525 MHz and IMT in the frequency band 1 495-1 518 MHz
|
SWG Sharing Studies
|
2017-02-21 |
|
[ 270 ]
(Rev.1) |
Reply liaison statement to ITU-D Study Group 2 (Rapporteur for Question 9/2) - Ongoing collaboration
|
WG General Aspects
|
2017-02-21 |
|
[ 269 ]
|
[Draft] liaison statement to external organizations - Antenna side-lobe suppression to Active Antenna System (AAS) for bands between 24.25 GHz and 86 GHz
|
SWG work for TG 5/1
|
2017-02-21 |
|
[ 268 ]
|
Meeting Report of Sub-Working Group IMT-AV
|
SWG IMT-AV
|
2017-02-20 |
Results:79 total items. Result page:
1 -
2
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):