International Telecommunication Union ITU
FranÁaisEspaŮol
Site map Contact Us Print version
Home : ITU-R : WP5D Recently posted†-† Search Meeting Documents
ITU-R†WP5D†Meeting Documents
Max # of documents displayed/page:
Results: 59 total items.
Result Page:† 1 - 2 †-†Next
Number Date Source Title
Number† Posted Size
[ 1297 ] 2019-07-22 Chairman, WP 5D † Report on the thirty-second meeting of Working Party 5D (Bķzios, Brazil, 9-17 July 2019) †
[ 1297 ]†Chapter 01†-†English†-† Word 2010 2019-08-16 [10:50]† 179'747† bytes Report on the thirty-second meeting of Working Party 5D (9-17 July 2019, Bķzios, Brazil) †
[ 1297 ]†Chapter 07†-†English†-† Word 2010 2019-07-25 [10:59]† 2'238'630† bytes General Matters †
[ 1297 ]†Chapter 06†-†English†-† Word 2010 2019-07-24 [16:30]† 116'283† bytes Meeting Report of Ad Hoc Workplan †
[ 1297 ]†Chapter 05†-†English†-† Word 2010 2019-07-24 [16:27]† 253'741† bytes Meeting Report of Working Group Technology Aspects †
[ 1297 ]†Chapter 04†-†English†-† Word 2010 2019-07-24 [16:12]† 8'702'094† bytes Meeting Report of Working Group Spectrum Aspects †
[ 1297 ]†Chapter 03†-†English†-† Word 2010 2019-07-24 [14:48]† 103'632† bytes Meeting Report of Working Group General Aspects †
[ 1297 ]†Chapter 02†-†English†-† Word 2010 2019-07-24 [14:42]† 638'968† bytes ITU-R Working Party 5D Structure and Workplan †
[ TD†766 ] 2019-07-16 Chairman, SWG Radio Aspects † Meeting Report of SWG Radio Aspects †
[ TD†766 ]†Revision 1†-†English†-† Word 2010 2019-07-17 [15:19]† 56'299† bytes
[ TD†766 ]††-†English†-† Word 2010 2019-07-16 [10:20]† 55'274† bytes
[ 1266 ] 2019-07-02 WP 4C † Liaison statement to Working Party 5D (copy to Working Parties 5A and 5C for information) - Sharing and coexistence studies between the mobile-satellite service and terrestrial IMT systems in the 2 655-2 690 MHz frequency band †
[ 1266 ]††-†English†-† Word 2010 2019-07-02 [15:56]† 46'852† bytes
[ TD†743 ] 2019-07-16 SWG RA preparation for SG 5 † [PRELIMINARY] draft revision of Question ITU-R 77-7/5** - Consideration of the needs of developing countries in the development and implementation of IMT †
[ TD†743 ]††-†English†-† Word 2010 2019-07-16 [09:06]† 56'873† bytes
[ TD†751 ] 2019-07-16 SWG RA preparation SG 5 † Summary of the status of the studies - [DRAFT] review of existing ITU-R Resolutions, Opinion and Questions and development of new ITU-R Question on IMT †
[ TD†751 ]††-†English†-† Word 2010 2019-07-16 [09:59]† 59'832† bytes
[ TD†804 ] 2019-07-17 Ad Hoc Workplan † [Draft] reply liaison statement to ITU-T JCA-IMT2020 - Invitation to update the information in the IMT-2020 roadmap [to ITU Study Groups and External IMT-2020 liaison partners] †
[ TD†804 ]††-†English†-† Word 2010 2019-07-17 [09:54]† 137'882† bytes
[ TD†740 ] 2019-07-16 WP 5D † Reply liaison statement to Working Party 4B - Draft new Report ITU-R M.[NGAT_SAT] - Key elements for integration of satellite systems into Next Generation Access Technologies †
[ TD†740 ]†Revision 1†-†English†-† Word 2010 2019-07-17 [08:35]† 54'011† bytes
[ 1279 ] 2019-07-02 Director, BR † Response to liaison statement to registered Independent Evaluation Group †
[ 1279 ]†Part 1†-†English†-† Word 2010 2019-07-03 [09:39]† 50'596† bytes
[ 1279 ]††-†English†-† Word 2010 2019-07-03 [09:38]† 96'640† bytes
[ 1269 ] 2019-07-02 Director, BR † Evaluation activities from Chinese Evaluation Group †
[ 1269 ]††-†English†-† Word 2010 2019-07-03 [18:20]† 2'284'300† bytes
[ 1269 ]†Part 1†-†English†-† Zip (Document) 2019-07-02 [16:25]† 2'212'273† bytes
[ TD†815 ] 2019-07-22 Chairman, WG Spectrum Aspects † Meeting Report of Working Group Spectrum Aspects †
[ TD†815 ]††-†English†-† Word 2010 2019-07-22 [08:54]† 50'201† bytes
[ 1296 ] 2019-07-18 Director, BR † Final List of Participants - Working Party 5D (Bķzios, Brazil, 9-17 July 2019 †
[ 1296 ]††-†English†-† PDF (acrobat) 2019-07-18 [09:59]† 760'530† bytes
[ TD†816 ] 2019-07-17 Acting Chairman, SWG Circular † Meeting Report of SWG Circular †
[ TD†816 ]††-†English†-† Word 2010 2019-07-17 [16:51]† 56'331† bytes
[ ADM†271 ] 2019-07-17 Chairman, WP 5D † Agenda for the Closing Plenary of the 32nd meeting of Working Party 5D - Wednesday, 17 July 2019 at 1000 hours (Room Tartaruga + GeribŠ) †
[ ADM†271 ]††-†English†-† Word 2010 2019-07-17 [15:30]† 70'857† bytes
[ TD†814 ] 2019-07-17 WG Technology Aspects † Meeting Report of Working Group Technology Aspects †
[ TD†814 ]††-†English†-† Word 2010 2019-07-17 [15:10]† 63'112† bytes
[ TD†813 ] 2019-07-17 Chairman, SWG Coordination † Meeting Report of SWG Coordination †
[ TD†813 ]††-†English†-† Word 2010 2019-07-17 [15:09]† 59'781† bytes
[ ADM†270 ] 2019-07-17 Chairman, WG Technology Aspects † Draft agenda for the final meeting of WG Technology Aspects - Tuesday, 16 July 2019, 17:30 - 18:45 hours (Room Tartaruga + Room GeribŠ) †
[ ADM†270 ]†Revision 1†-†English†-† Word 2010 2019-07-17 [10:38]† 60'619† bytes
[ ADM†268 ] 2019-07-17 Chairman, WG General Aspects † Agenda for the 2nd General Aspects Working Group meeting - Tuesday, 16 July 2019 at 1400 hours (Room Tartaruga) †
[ ADM†268 ]††-†English†-† Word 2010 2019-07-17 [10:37]† 58'860† bytes
[ ADM†269 ] 2019-07-17 Chairman, WG Spectrum Aspects † Draft agenda of the final meeting of WG Spectrum Aspects - Tuesday, 16 july 2019 at 15:45 hours (Room Tartaruga + GeribŠ) †
[ ADM†269 ]††-†English†-† Word 2010 2019-07-17 [10:37]† 55'726† bytes
[ ADM†267 ] 2019-07-17 Chairman, SWG Sharing Studies † Draft agenda fro the 2nd meeting of SWG Sharing Studies - Tuesday, 16 July 2019 from 10:45 to 12:00 hours (Room Tartaruga) †
[ ADM†267 ]††-†English†-† Word 2010 2019-07-17 [10:37]† 57'634† bytes
[ TD†810 ] 2019-07-17 SWG OOBE † Liaison statement to 3GPP RAN4 - Test methods for over-the-air total radiated power field measurements for IMT radio equipment utilizing active antennas †
[ TD†810 ]†Revision 1†-†English†-† Word 2010 2019-07-17 [09:56]† 57'537† bytes
[ TD†809 ] 2019-07-17 SWG Coordination † Information on ITU-R Working Party 5D workshop on IMT-2020 Terrestrial radio interfaces Evaluation †
[ TD†809 ]†Revision 1†-†English†-† Word 2010 2019-07-17 [09:56]† 60'234† bytes
[ TD†807 ] 2019-07-17 Chairman, SWG Sharing Studies † Meeting Report of SWG Sharing Studies †
[ TD†807 ]†Revision 1†-†English†-† Word 2010 2019-07-17 [09:55]† 62'454† bytes
[ TD†812 ] 2019-07-17 Chairman, General Aspects WG † Chairman's Report of General Aspects Working Group †
[ TD†812 ]††-†English†-† Word 2010 2019-07-17 [09:57]† 56'258† bytes
[ TD†811 ] 2019-07-17 Chairman, TECH SWG OOBE † Meeting Report of SWG OOBE †
[ TD†811 ]††-†English†-† Word 2010 2019-07-17 [09:57]† 55'107† bytes
[ TD†808 ] 2019-07-17 SWG Evaluation † Meeting Report of Sub-working Group Evaluation †
[ TD†808 ]†Part 1†-†English†-† PowerPoint 2007 2019-07-17 [09:55]† 42'786† bytes
[ TD†808 ]††-†English†-† Word 2010 2019-07-17 [09:55]† 117'213† bytes
[ TD†806 ] 2019-07-17 Chairman, Ad Hoc Workplan † Meeting Report of Ad Hoc Workplan †
[ TD†806 ]††-†English†-† Word 2010 2019-07-17 [09:54]† 53'333† bytes
[ TD†805 ] 2019-07-17 Ad Hoc Workplan † Chapter 2 - ITU-R Working Party 5D Structure and Workplan †
[ TD†805 ]††-†English†-† Word 2010 2019-07-17 [09:54]† 736'632† bytes
[ TD†803 ] 2019-07-17 SWG Coordination † Acknowledgement of candidate RIT submission from NUFRONT under Step 3 of the IMT-2020 process †
[ TD†803 ]††-†English†-† Word 2010 2019-07-17 [09:53]† 132'725† bytes
[ TD†802 ] 2019-07-17 SWG Coordination † Acknowledgement of candidate RIT submission from TSDSI under Step 3 of the IMT-2020 process †
[ TD†802 ]††-†English†-† Word 2010 2019-07-17 [09:52]† 1'721'889† bytes
[ TD†801 ] 2019-07-17 SWG Coordination † Acknowledgement of candidate SRIT submission from ETSI (TC DECT) and DECT forum under Step 3 of the IMT-2020 process †
[ TD†801 ]††-†English†-† Word 2010 2019-07-17 [09:52]† 497'268† bytes
[ TD†800 ] 2019-07-17 SWG Coordination † Acknowledgement of candidate RIT submission from China (People's Republic of) under Step 3 of the IMT-2020 process †
[ TD†800 ]††-†English†-† Word 2010 2019-07-17 [09:52]† 106'393† bytes
[ TD†799 ] 2019-07-17 SWG Coordination † Acknowledgement of candidate RIT submission from Korea (Republic of) under Step 3 of the IMT-2020 process †
[ TD†799 ]††-†English†-† Word 2010 2019-07-17 [09:50]† 109'627† bytes
[ TD†798 ] 2019-07-17 SWG Coordination † Acknowledgement of candidate RIT submission from 3GPP proponent Step 3 of the IMT-2020 process †
[ TD†798 ]††-†English†-† Word 2010 2019-07-17 [09:49]† 106'302† bytes
[ TD†790 ] 2019-07-17 SWG Sharing Studies † Draft reply liaison statement to Working Party 6A - Revision of Report ITU-R BT.2382 related to information on IMT systems †
[ TD†790 ]†Revision 1†-†English†-† Word 2010 2019-07-17 [09:06]† 55'557† bytes
[ TD†788 ] 2019-07-17 SWG Frequency Arrangements † [Preliminary] draft revision of Recommendation ITU-R M.1036-5 - Frequency arrangements for implementation of the terrestrial component of International Mobile Telecommunications (IMT) in the bands identified for IMT in the Radio Regulations (RR) †
[ TD†788 ]†Revision 1†-†English†-† Word 2010 2019-07-17 [09:05]† 361'309† bytes
[ TD†797 ] 2019-07-17 SWG Coordination † Acknowledgement of candidate SRIT submission from 3GPP proponent under Step 3 of the IMT-2020 process †
[ TD†797 ]††-†English†-† Word 2010 2019-07-17 [09:10]† 63'636† bytes
[ TD†796 ] 2019-07-17 SWG Coordination † Draft liaison statement to IMT-2020 proponents 'Proponent Nufront' - Confirmation of receipt of candidate technology submission related to proposals for the terrestrial components of the radio interface(s) for IMT-2020 †
[ TD†796 ]††-†English†-† Word 2010 2019-07-17 [09:09]† 54'937† bytes
[ TD†795 ] 2019-07-17 SWG Coordination † Draft liaison statement to IMT-2020 proponents 'Proponent Korea (Republic of)' - Confirmation of receipt of candidate technology submission related to proposals for the terrestrial components of the radio interface(s) for IMT-2020 †
[ TD†795 ]††-†English†-† Word 2010 2019-07-17 [09:09]† 54'938† bytes
[ TD†794 ] 2019-07-17 SWG Coordination † Draft liaison statement to IMT-2020 proponents 'Proponent TDSI' - Confirmation of receipt of candidate technology submission related to proposals for the terrestrial components of the radio interface(s) for IMT-2020 †
[ TD†794 ]††-†English†-† Word 2010 2019-07-17 [09:08]† 55'304† bytes
[ TD†793 ] 2019-07-17 SWG Coordination † Draft liaison statement to IMT-2020 proponents 'Proponent ETSI (TC DECT) & DECT Forum' - Confirmation of receipt of candidate technology submission related to proposals for the terrestrial components of the radio interface(s) for IMT-2020 †
[ TD†793 ]††-†English†-† Word 2010 2019-07-17 [09:08]† 55'673† bytes
Results: 59 total items.
Result Page:† 1 - 2 †-†Next
Multiple Document Download:†Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:†Formats and Languages to be included (when available):
HTML Navigation Pages Yes
Formats doc pdf zip †+†Other formats
Languages (maximum 2) E F S A C R †+†Multilingual†
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top†-† Feedback†-† Contact Us†-† Copyright © ITU†2008†All Rights Reserved
Contact for this page :† ITU-R Web coordinator
Updated :†2019-08-16